District 3 - Project Updates

2017 Your Voice, Your Choice: Parks and Street Elected Projects

STREETS | I-5 Offramp onto Olive Way

Crossing Upgrades

Project Description and Goals:
People traveling the I-5 freeway northbound can exit onto E Olive Way. However, due to its design, people exiting the freeway have limited visibility and must slow from a high rate of speed very quickly. These conditions make it challenging for pedestrians who are crossing the off-ramp to access downtown Seattle via Olive Way. Installing crossing beacons to alert people driving of pedestrians enhances safety. New curb ramps to be constructed by others.

Project Solution(s):

Install crossing beacons

Construction anticipated in spring/summer 2023 pending WSDOT coordination.

I5 offramp onto Olive Way, crossing upgrades map

Back to top.
Back to Your Voice, Your Choice landing page.

STREETS | 17th Ave S between E Yesler Way and S Jackson St

Traffic Circle and Crossing Upgrade

Project Description and Goals:
17th Ave S is a residential street, which experiences a high volume of traffic from pedestrians and people driving between E Yesler Way and S Jackson St. Installing a traffic circle and crossing improvements will improve traffic flow, predictability, and pedestrian safety.

Project Solution(s):

Install a marked crosswalk

Install a traffic circle at 17th Ave S and S Washington St

Construction was completed in June 2018.

17th Ave South between Yesler Way and South Jackson Street, crossing upgrades map

Back to top.
Back to Your Voice, Your Choice landing page.

STREETS | 19th Ave S and E Denny Way

Crossing Upgrades

Project Description and Goals:
Many travelers use E Denny Way as a commuting route into the City and pedestrians have expressed difficultly when crossing Denny at 19th Ave S. The northeast corner of the intersection has a school bus stop for students attending TOPS K-8 school. Installing a marked crosswalk and curb ramps enhances the connection to TOPS K-8 School, safety and accessibility at this intersection.

Project Solution(s):

Install a marked crosswalk on the north side of E Denny Way

Install new curb ramps

Construction was completed in November 2018.

19th Ave South and East Denny crossing upgrades map

Back to top.
Back to Your Voice, Your Choice landing page.

PARKS | Judkins Park and S Dearborn St

Crossing Upgrades

Project Description and Goals:
Judkins Park is poorly connected to the community on its east side at S Dearborn St. The park entrance at this location contains two pathways; one of them is overgrown and disrupted by tree roots, the second isn't accessible for everyone.

Enhancing walkways and adding seating space improves accessibility and connectivity for travelers of all ages and abilities, and better connects Judkins Park to the community.

Project Solution(s):

Restore and enhance the existing walkway to create a gracious park entry

Maintain ADA compliance

Install a park bench at the top of the park to promote its scenic viewpoint

Construction was completed in 2019.

An aerial map depicting the Judkins park playfield and the internal walkways within the park. Newly enhanced walkways and landscape maintenance upgrades to the park, are shown on it's eastern side connecting this entrance to south dearborn street.

Back to top.
Back to Your Voice, Your Choice landing page.

Materials

Transportation

Greg Spotts, Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Transportation

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.