Design is now complete, and construction is expected to begin in May 2026. Improvements along Greenwood Ave N between N 112th St and N 137th St will include new sidewalks, improved crossings, ADA (Americans with Disabilities Act) accessible curb ramps, and upgrades that make it easier for everyone to travel to local businesses, schools, community destinations, and transit hubs. 

We will continue to share updates as we get closer to construction. To receive timely notices about what’s happening next, subscribe to Get Project Updates and stay informed throughout construction. 

Project Overview

We are improving sidewalks along Greenwood Ave N between N 112th St to N117th ST and N 134th St to N 137th St. We are adding new sidewalks, curbs, planting strips, pedestrian signal upgrades, and curb ramps that meet ADA (Americans with Disabilities Act) standards. This project will include civil work for a future half signal installation at N 134th Street. The future half signal will provide safer and more accessible connections for the community to access transit along Greenwood Ave N.  

Parking lanes within the project area will be repaved and new curb and gutter will be installed along the new sidewalk. These improvements will make it easier for residents to walk, roll, and access schools, businesses, and other destinations. By creating safer and more accessible routes, we’re connecting the community and promoting active travel options for people of all ages and abilities. 

Project Area

Project Locations: 

  • Greenwood Ave N between N 136th St and N 137th St (east and west side of the street)
  • Greenwood Ave N between N 133rd St and N 134th St (east and west side of the street)
  • Greenwood Ave N between N 112nd St to N 117th St (east and west side of street) 

 N 136th St – N 137th St 

N 133rd St – N 134th St N 115th St – N 117th St N 112nd St – N 115th St 

Project Background

The Greenwood Ave N Sidewalk Improvements Project represents the final chapter in a remarkable, years-long effort to transform Greenwood Ave N into a safer, more accessible corridor for everyone. Before annexation into the City of Seattle, much of Greenwood Ave N was built without sidewalks, leaving gaps in safety and connectivity.

Since 2009, we’ve been working to close these gaps, enhancing accessibility, and creating safer routes for pedestrians, cyclists, and transit riders. This final phase marks the culmination of years of planning and dedication to connecting community destinations, schools, and businesses. This project is more than a set of improvements—it's a celebration of progress, collaboration, and a shared vision for a healthier, more accessible Greenwood community.  

Project Schedule

Design: After early outreach through the Neighborhood Greenways program, the Greenwood Sidewalks Project became a standalone initiative in 2024 with dedicated funding. We're excited to resume design work in spring 2025.

Construction: Construction is scheduled to begin as soon as May 2026.

Please note, construction schedules are subject to change based on crew and material availability.   

Funding

This project is funded by the New Sidewalks Program, Crossings Program, and Transit Spot Program.  

Nearby Project

Project Materials

Transportation

Adiam Emery, Interim Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Transportation

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.