Greenwood Ave N Sidewalk Improvements

Updated August 6, 2026

What's Happening Now?

N 134th St Closure August 12-14 from 7 AM – 4 PM

Next week, crews will do electric work on N 134th St, including trenching and pavement work. This work requires closing a section of N 134th St east of Greenwood Ave N and is anticipated to take from Wednesday, August 12, to Friday, August 14, from 7 AM – 4 PM each day.  

 
Map showing closure and detour at N 134th St between Greenwood Ave N and Bitter Pl N

Upcoming Construction

 
Over the next several weeks, we’ll work on the east side of Greenwood Ave N between N 137th St and N 133rd St. This work requires driveway closures, and we’ll notify affected properties in advance. Walk up access to homes and businesses is maintained during driveway closures.

Construction activities

  • Demolition of existing pavement

  • Installing utilities for future traffic signals

  • Installing curbs and gutters

  • Installing sidewalks

  • Installing driveways 

What To Expect

  • Weekday working hours from 7 AM – 4 PM
  • Lane reductions near active construction areas from 9 AM – 3 PM. 1 lane in each direction is maintained throughout construction and all vehicle lanes are open during peak commute times and weekends.
  • Temporary driveway closures starting July 27. We will notify affected properties about driveway closures in advance. Walk up access to homes and businesses is maintained throughout construction
  • Parking restrictions 
  • Demolition which will cause noise, dust, and vibrations 
  • Impacts to bus stops. Please visit King County Metro’s Service Advisories page for current route and stop information.

Metro Bus Stop # 6840 Closure (Northbound): July 27 – September 8  

Metro Bus Stop #6840 on the east side of Greenwood Avenue N & N 134th Street is closed from Monday, July 27 through Tuesday, September 8. This closure affects northbound routes 5 & 35. Visit King County Metro Service Advisories for more information.

Construction Sequencing 

  • We are working on the east side of Greenwood Ave N first and will work north to south
  • Once we reach the southern limit on the east side, we will move to the west side of the street and work north to south again
  • Generally, we will work on one section of sidewalk at a time, completing demolition and installing the new sidewalk before moving to the next section. We may start preparation and demolition work on the next section of sidewalk while we install the sidewalk in the adjacent section.
  • Work in each project section will last approximately 2 - 3 months
  • Construction will last until early/mid 2027

Please sign up for email updates to get the latest project and construction news. You can find this project under the "walking & biking" section. 

Project Overview

We are improving sidewalks along Greenwood Ave N between N 112th St to N117th ST and N 134th St to N 137th St. We are adding new sidewalks, curbs, planting strips, pedestrian signal upgrades, and curb ramps that meet ADA (Americans with Disabilities Act) standards. This project will include civil work for a future half signal installation at N 134th Street. The future half signal will provide safer and more accessible connections for the community to access transit along Greenwood Ave N.  

Parking lanes within the project area will be repaved and new curb and gutter will be installed along the new sidewalk. These improvements will make it easier for residents to walk, roll, and access schools, businesses, and other destinations. By creating safer and more accessible routes, we’re connecting the community and promoting active travel options for people of all ages and abilities. 

Project Area

Project Locations: 

  • Greenwood Ave N between N 136th St and N 137th St (east and west side of the street)
  • Greenwood Ave N between N 133rd St and N 134th St (east and west side of the street)
  • Greenwood Ave N between N 112nd St to N 117th St (east and west side of street) 

 N 136th St – N 137th St 

N 133rd St – N 134th St N 115th St – N 117th St N 112nd St – N 115th St 

Project Background

The Greenwood Ave N Sidewalk Improvements Project represents the final chapter in a remarkable, years-long effort to transform Greenwood Ave N into a safer, more accessible corridor for everyone. Before annexation into the City of Seattle, much of Greenwood Ave N was built without sidewalks, leaving gaps in safety and connectivity.

Since 2009, we’ve been working to close these gaps, enhancing accessibility, and creating safer routes for pedestrians, cyclists, and transit riders. This final phase marks the culmination of years of planning and dedication to connecting community destinations, schools, and businesses. This project is more than a set of improvements—it's a celebration of progress, collaboration, and a shared vision for a healthier, more accessible Greenwood community.  

Project Schedule

Design: After early outreach through the Neighborhood Greenways program, the Greenwood Sidewalks Project became a standalone initiative in 2024 with dedicated funding. We're excited to resume design work in spring 2025.

Construction: Construction is scheduled to begin as soon as Mid-July 2026.

Please note, construction schedules are subject to change based on crew and material availability.   

Funding

This project is funded by the New Sidewalks Program, Crossings Program, and Transit Spot Program.  

Nearby Project

Project Materials

Transportation

Angela Brady, Acting Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Sign Up for Latest Updates

Subscribe

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.