What's happening now?

The improvements at 25th Ave SW and SW Cambridge St were completed in April 2025, while the work at 26th Ave SW and SW Cambridge St was completed in 2022 as part of the H Line and Reconnect West Seattle projects. 

Crews have improved both intersections by installing new curb ramps. And at 26th Ave SW crews also painted and installed post bulbs.  

Intersection of 25th Ave SW and SW Cambridge St showing new curb ramps with tactile yellow strips, a roundabout with greenery, and a person pushing a stroller across the street under a clear blue sky.

The photo above shows new curb ramps at the intersection of 25th Ave SW and SW Cambridge St improves accessibility and safety for people walking and using mobility devices. 

We want to thank everyone who took part in the community prioritization process for the 26th Ave SW and 25th Ave SW & SW Cambridge St Safety Enhancements project. Your input has been invaluable in making this project a reality! 

Three-frame photo showing recent upgrades at two residential intersections: new flex posts and striping in the top frame; bottom frames compare old, worn sidewalks with new curb ramps and tactile strips.

The collage above shows intersection upgrades: the new curb ramps and painted curb bulbs with flexi posts at 26th Ave and SW Cambridge St (top), and before-and-after sidewalk improvements with accessible curb ramps at 25th Ave and SW Cambridge St (bottom). 

About the Project 

The intersection of 26th Ave SW and SW Cambridge St is located in the South Delridge and Roxhill neighborhoods. It plays an important role in the community as SW Cambridge St provides access to Roxhill Park, and it is also a bus stop area for Roxhill Elementary students. The project improved both intersections by adding: 

  • New curb ramps and paint and post bulbs at 26th Ave SW and SW Cambridge St
  • New curb ramps at 25th Ave SW and SW Cambridge St 

Design

26th Ave SW

Schedule

Timeline

Phase Timeline
Project Selection 2022
Design 2023
Construction 2024
Project Completion 2025

Project Background

This was one of nine Neighborhood Street Fund (NSF) projects requested by community and selected by the Levy to Move Seattle Oversight Committee to be funded by Neighborhood Street Fund. NSF is a city program, running on 3-year cycles, that enables neighbors to propose and help prioritize transportation-related projects that are then built by the Seattle Department of Transportation (SDOT). 

Questions?

  • If you have questions or need translated materials, please contact us at NSF@seattle.gov or 206-727-3581. Thank you.
  • Servicios de traducción e interpretación disponibles bajo petición 206-727-3581.
  • Matutulungan ka naming maintindihan kung hihingi kang tulong 206-727-3581.
  • 요청하시면 번역이나 통역을 제공해드립니다 206-727-3581.
  • Dịch và thông dịch viên sẵn sàng nếu có sự yêu cầu 206-727-3581.
  • Haddii aad dooneyso turjubeen fadlen wac 206-727-3581.

Transportation

Adiam Emery, Interim Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Transportation

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.