Project Complete
This project was completed in 2025.
26th Ave SW and SW Cambridge St Safety Enhancements
Updated: April, 2025
What's happening now?
The improvements at 25th Ave SW and SW Cambridge St were completed in April 2025, while the work at 26th Ave SW and SW Cambridge St was completed in 2022 as part of the H Line and Reconnect West Seattle projects.
Crews have improved both intersections by installing new curb ramps. And at 26th Ave SW crews also painted and installed post bulbs.
The photo above shows new curb ramps at the intersection of 25th Ave SW and SW Cambridge St improves accessibility and safety for people walking and using mobility devices.
We want to thank everyone who took part in the community prioritization process for the 26th Ave SW and 25th Ave SW & SW Cambridge St Safety Enhancements project. Your input has been invaluable in making this project a reality!
The collage above shows intersection upgrades: the new curb ramps and painted curb bulbs with flexi posts at 26th Ave and SW Cambridge St (top), and before-and-after sidewalk improvements with accessible curb ramps at 25th Ave and SW Cambridge St (bottom).
About the Project
The intersection of 26th Ave SW and SW Cambridge St is located in the South Delridge and Roxhill neighborhoods. It plays an important role in the community as SW Cambridge St provides access to Roxhill Park, and it is also a bus stop area for Roxhill Elementary students. The project improved both intersections by adding:
- New curb ramps and paint and post bulbs at 26th Ave SW and SW Cambridge St
- New curb ramps at 25th Ave SW and SW Cambridge St
Design
Schedule
Phase | Timeline |
---|---|
Project Selection | 2022 |
Design | 2023 |
Construction | 2024 |
Project Completion | 2025 |
Project Background
This was one of nine Neighborhood Street Fund (NSF) projects requested by community and selected by the Levy to Move Seattle Oversight Committee to be funded by Neighborhood Street Fund. NSF is a city program, running on 3-year cycles, that enables neighbors to propose and help prioritize transportation-related projects that are then built by the Seattle Department of Transportation (SDOT).
Questions?
- If you have questions or need translated materials, please contact us at NSF@seattle.gov or 206-727-3581. Thank you.
- Servicios de traducción e interpretación disponibles bajo petición 206-727-3581.
- Matutulungan ka naming maintindihan kung hihingi kang tulong 206-727-3581.
- 요청하시면 번역이나 통역을 제공해드립니다 206-727-3581.
- Dịch và thông dịch viên sẵn sàng nếu có sự yêu cầu 206-727-3581.
- Haddii aad dooneyso turjubeen fadlen wac 206-727-3581.