Highland Park Way SW and SW Holden St Safety Improvements
Updated April 19, 2024
What's Happening Now?
Final steps to complete the permanent traffic signal underway
We are on the final stretch of construction for the permanent traffic signal at the intersection of Highland Park Way SW and SW Holden St. Over the next few weeks, we will attach the traffic signal heads to the metal mast arms so they are no longer hanging from a wire as pictured below.
After that, we will hang traffic cameras to monitor and adjust the signal in real-time and install traffic loops in the pavement on all four sides of the intersection so the signal can recognize when a person driving is waiting at the light. We will also activate the crosswalk button on the sidewalk, so people can request a signal change when they need to walk across the street.
All of these steps will improve traffic signal timing for people who are driving, while providing signalized crossings for people who are walking.
When
This work is scheduled from April 22 - May 10, though that could shift based on weather and crew availability. Our work hours are from 7 AM – 4 PM.
What to Expect
Alternating traffic lanes will be closed during some of this work, but there will always be one lane open for cars to get through. There will also be temporary sidewalk closures and detour routes for people walking. This is not particularly noisy work, but if you live or work in the area, you may hear construction equipment running and some beeping when crews back up equipment.
Thank you for your patience as we create a safer and more accessible intersection for all. If you have any questions or concerns, please email us at: HighlandHolden@seattle.gov or leave us a voicemail at: (206) 900-8741.
To stay informed of project progress, please sign up for our email updates.
Project Overview & Design
Highland Park Way SW is a major north-south route in West Seattle, providing access to SR 99, SR 509, I-5, and the Duwamish Trail. It has been the site of several crashes and safety issues due to poor sight distances, high speeds, travel lane confusion, and a lack of pedestrian facilities like crosswalks. The Highland Park community asked for changes at this busy intersection and this project includes:
- A more durable traffic signal with metal poles that have signal lights instead of lights connected to wooden poles.
- Traffic cameras to monitor and adjust the signal in real-time, as well as vehicle detection in the pavement so the signal can recognize when a person driving is waiting at the light.
- New sidewalks and upgraded ADA accessible concrete curb ramps and curb bulbs at all four corners of the intersection.
- Permanent crosswalks at each crossing.
Public Art Installation
On November 9, 2023 this 17-foot-tall Steller’s jay landed on southwest corner of Highland Park Way SW and SW Holden St, welcoming all to the neighborhood. This new public artwork was created by Matthew Mazzotta and is titled Where’s the Party: Elevating Nature and Resilience. It was chosen by a community selection panel and administered by Seattle Office of Arts & Culture as part of the Highland Park Way SW and SW Holden St Safety Improvements Project. Learn more on our blog.
Project History & Additional Traffic Calming
The closure of the West Seattle Bridge on March 23, 2020 brought significant traffic to the Highland Park neighborhood and to the already-strained intersection of Highland Park Way SW and SW Holden St. One of the first projects we built shortly after the bridge closed was a temporary signal at the intersection. This temporary signal will be replaced by a permanent signal as part of the Highland Park Way SW and SW Holden St Safety Improvements project.
In June and July 2020, we also built speed humps and cushions in nine locations near the intersection to support safety around the new traffic signal. These locations are shown below. The speed humps and cushions help slow down vehicles as they approach the intersection and discourage neighborhood cut-through traffic. Speed humps are a solid hump across the road and speed cushions leave spaces between for emergency vehicles and people biking to easily pass through.
Separate from this project, the Reconnect West Seattle project team added traffic calming in the Highland Park neighborhood to address detour traffic from the West Seattle Bridge closure, through a Home Zone. A Home Zone involves the entire neighborhood working together to prioritize improvements that calm traffic on residential streets and improve pedestrian mobility and neighborhood livability.
Materials
- Construction Notices & Project Announcements
- Public Art Announcement & Meet-the-Artist Invitation (November 2023)
- Construction Notice: Night Work for Restriping (October 2023)
- Construction Notice: Especially Noisy Work (September 2023)
- Construction Notice: Driveway Demolition (September 2023)
- Construction Notice: Hedge Trimming and Sidewalk Demolition (September 2023)
- Construction Notice: Driveway Closure (September 2023)
- Construction Notice: Alley Entrance Closure (August 2023)
- Construction Notice: Weekend Work (July 2023)
- Construction Notice: Construction Overview Mailer (June 2023)
- SDOT Blog: Construction after the West Seattle Bridge reopens
- Highland Park Action Coalition Meeting (October 28, 2020)
- 30% design intersection graphic (Fall 2020)
- Design outreach (Spring-Summer 2020)
- Speed humps and cushions postcard (June 2020)
- Highland Park Action Coalition Meeting (May 27, 2020)
- Project mailer (May 2020)
- Early design plans for public input (May 2020)
Funding
This project is funded by the 9-year Levy to Move Seattle, approved by voters in 2015. The public artwork was built into the construction budget as a 1% for Art project.