W Dravus St Bridge Planning Study

Updated September 2026

What's Happening Now?

We are in the early stages of the W Dravus St Bridge Planning Study. We are collecting and reviewing data to help us understand the bridge’s current condition and study the best options. This includes conducting traffic counts and other fieldwork. We are also preparing to host a virtual public meeting and collect community feedback through a survey. These activities will help us develop initial options for repairing or replacing the bridge. 

Project Overview

The W Dravus St Bridge Planning Study will help the City of Seattle (City) evaluate options for repairing or replacing the bridge and identify a preferred alternative.  

Built in 1935, the W Dravus St Bridge connects the Magnolia, Interbay, and Queen Anne neighborhoods by crossing BNSF Railway’s Balmer Yard. More than 21,000 vehicles use the bridge each day, along with people walking, biking, and rolling. The City owns the bridge and shares maintenance responsibilities with BNSF. While we’ve repaired and retrofitted the W Dravus St Bridge over the years, it is now over 90 years old. It needs long-term investments to remain safe, reliable, and useful for future generations. 

Benefits of this planning study include:

  • Proposing a safer, stronger, and more resilient bridge for everyone: We will identify improvements to help prevent costly emergency repairs and keep the bridge reliable.
  • Prioritizing connectivity between Magnolia, Interbay, and Queen Anne: The study will explore ways to help people travel between these neighborhoods for years to come.
  • Preparing for the future: We will prepare to upgrade the bridge to meet today's safety, earthquake, and transportation standards. Our plans will also consider future infrastructure projects in the area, including the planned Interbay Link Station.
  • Using community feedback to shape the project: We are listening to people who use the bridge every day.

Project Area

A map of the project area highlighting the section of W Dravus St over the railway.

Project Schedule

Fall 2026

  • Develop alternatives

Winter 2026/2027

  • Select alternatives to study in more depth

Spring 2027

  • Refine bridge alternatives down to three options

Summer 2027

  • Select preferred alternative

Frequently Asked Questions

The W Dravus St Bridge is more than 90 years old. While we've repaired and strengthened it over the years, it will need significant long-term investment to remain safe and reliable. This study will help determine the best approach for the bridge's future. 

Yes. The W Dravus St Bridge is open and in service. 

No. The purpose of this study is to evaluate a range of repair and replacement options. Community feedback, construction impacts, costs, safety, future needs, and other factors will help inform the study’s recommendation for a preferred alternative. 

The study will evaluate both repair and replacement alternatives for the bridge. Our team will develop and revise different options throughout the study. 

The project team will evaluate options and gather community feedback first. We expect to identify and recommend a preferred alternative in spring 2027.  

The W Dravus St Bridge Planning Study draws on feedback from other bridge studies. This includes the Ballard-Interbay Regional Transportation System Study. We'll also create new opportunities for people to share their ideas. Community feedback will help us understand how people use the W Dravus St Bridge and how they would like to use it in the future. We'll discover what matters most, and what questions or concerns people have. The study will consider feedback and other factors. 

The study will help coordinate future bridge improvements with other major transportation projects. This includes improvements on W Dravus St over 15th Ave W, maintenance on the Magnolia and Ballard bridges, and Sound Transit’s Ballard Link Extension project. 

No. This planning study will identify and recommend a preferred alternative. Construction would occur in future phases. 

Nearby Projects

Funding

This project is funded by the voter-approved Seattle Transportation Levy, which invests in maintaining and improving Seattle's transportation system. Learn more at seattle.gov/transportation/levy.

Contact Information

Our team is committed to keeping the community informed throughout the project. If you have any questions about our work, please feel free to email DravusBridgePlanning@seattle.gov or call (206) 257-2155.

Need a Translation?

If you need this information translated, please call (206) 257-2155.

Servicios de traducción e interpretación disponibles bajo petición (206) 257-2155.

如果您需要翻譯此訊息,請致電 (206) 257-2155.

Transportation

Angela Brady, Acting Director
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: (206) 684-7623
684-Road@seattle.gov

Sign Up for Latest Updates

Subscribe

The Seattle Department of Transportation (SDOT) is on a mission to deliver a transportation system that provides safe and affordable access to places and opportunities for everyone as we work to achieve our vision of Seattle as a thriving, equitable community powered by dependable transportation.