West Seattle Stadium ADA Improvements

Updated: October 28, 2025

Fall 2025 

Seattle Parks and Recreation (SPR) has issued the Notice to proceed to Optimus Construction & Development for the ADA West Seattle Stadium Project, Optimus will mobilize on site in late October 2025, and the Stadium work is expected to be completed by late Fall 2026. 

Location 

West Seattle Stadium, 4432 35th Ave. SW, Seattle, WA 98126 

Schedule 

Planning: Summer 2018 
Design: Spring 2019 
Construction: Fall 2025 
Completion: Fall 2026 

Project Description 

This project will upgrade the West Seattle Stadium to current accessibility standards, including improvement to accessible routes, parking stalls, providing wheelchair seating and a platform lift to the south concrete grandstands, restroom and interior improvements and Site Work. Site Work includes new concrete ramps, plazas, asphalt parking stalls, landscaping and irrigation improvements, and a new detention vault. This project also includes 2 Additives that we will be doing as well. Additive 1 covers Epoxy Flooring over sealed concrete in the restrooms. Additive 2 includes construction of an additional ramp from the parking area to the concrete bleacher structure. 

During construction, the contractor will need to close a portion of the track near the Grandstands.  Seattle Parks and Recreation and the Contractor hired for the project will work to minimize the impact on the track & field.  

Parks and Recreation

AP Diaz, Superintendent
Mailing Address: 100 Dexter Ave N, Seattle, WA, 98109
Phone: (206) 684-4075
Fax: (206) 615-1813
pks_info@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Parks and Recreation

Healthy People, Thriving Environment, Vibrant Community