Seattle Parks and Recreation
Christopher Williams, Acting Superintendent
Building 47 Drawings and Photos
The following drawings are from the 1940's and 2000's with a 2002 build out of Building 47. Some areas in the drawings are not included in the RFP. SPR recommends pairing these drawings with a building tour to finalize with a construction team.
Building 47 Drawings from the 1940s
- Auditorium Balcony and Misc. Framing
- Auditorium Balcony Truss Changes
- Auditorium Roof and First Floor Framing Plans
- Auditorium Wall Details
- Auditorium Walls - Reinf. Steel Placing Plan
- Balcony and Bleacher Framing
- Balcony Details
- Basement Plan - HVAC
- Elevations - East and West
- Elevations - North and South
- Elevations and Window Details
- First Floor Plan
- Ground Floor Plan - HVAC
- Ground Floor Plan
- Mezzanine and Balcony - HVAC Plans
- Mezzanine and Balcony Plans
- North Wall Corbels
- Repairs and Alterations to Swimming Pool
- Section and Details
- Sections (2)
- Sections
- Swimming Pool Details
- Theatre Fixture Details
- Theatre Ventilation Additions
- Theatre Ventilation System Revisions
- Theatre Ventilation
Building 47 Drawings from the 2000s
- Door and window schedules
- Electrical diagrams
- Electrical schedules
- Electrical symbols and abbreviations
- Enlarged plans and elevations
- Equipment schedule
- Ground floor lighting plan
- Ground floor mechanical plan
- Ground floor power plan
- Interior details (2)
- Interior details
- Interior elevations
- Main floor lighting plan
- Main floor mechanical plan
- Main floor plan
- Main floor power plan
- Main level - as built (2)
- Main level - as built
- Mechanical boiler room plan and details (2)
- Mechanical boiler room plan and details
- Mechanical details
- Mechanical roof plan
- Mechanical schedules
- Mechanical symbols and legend
- Mechanical symbols, legend and abbreviations
- Mezzanine and balcony power plan
- Mezzanine, balcony, and basement lighting plan
- *NEW Utility Upgrades
- One-line diagram
- Reflected ceiling plan - main floor
- SITE MAP