SEATTLE AREA CONSTRUCTION LOOK AHEAD

Last Update: April 20, 2017

To view this information geographically, visit SDOT's Travelers Information Map

Click here to download the PDF of this information

HIGHLIGHTS

April 21: Buses will drop-off and pick-up students at KeyArena for We Day. Expect congestion and delays in the South Lake Union neighborhood during the morning and afternoon commutes.

April 22 & 23: Southbound Fairview Ave. N. closed between Mercer and Republican St; northbound Fairview reduced to one lane.

April 22: SPD will escort the March for Science from Cal Anderson Park on Capitol Hill to the Seattle Center via Pine St. and 4th Ave.

April 24 - May 7: 6th Ave. reduced to one lane between Stewart St. and Westlake Ave. during roadway restoration work.

May 2: 3rd Ave. Arterial Paving Project begins (Virginia to Broad). First phase will reduce 3rd Ave. to one lane in each direction between Virginia St. and Blanchard St. Project is expected to last 10 months.

Note: Information subject to change. Additional construction or events may be planned in the Seattle area.
Questions? Contact: construction.coordination@seattle.gov or call 206-684-ROAD

Downtown Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 17 - 21
24/7
Lane closures on Stewart St. at 9th Ave. intersection Two lanes closed 24/7 on Stewart St. at 9th Ave. intersection during roadway restoration work.  In addition, 9th Ave. will be reduced to one lane at Stewart St.
April 22 6AM
to
April 23 11:59PM
Lane closures on Stewart St. and 6th Ave. Stewart St. will be reduced to one lane at 6th Ave. during roadway restoration work.  6th Ave. will be closed at Olive Way (traffic will be detoured to 8th Ave.).
April 22
10AM - 1PM
March for Science SPD will escort a march from the Cal Anderson Park to Seattle Center.  From 11th & Pine, route will go west on Pine, north on 4th, north on Cedar, north on 5th, and west on Harrison onto the Seattle Center campus.
April 24
to
May 7
24/7
6th Ave. reduced to one lane between Stewart St. and Westlake Ave. Crews will reduce 6th Ave. to one lane between Stewart St. and Westlake Ave. during roadway restoration work.
April 27
6PM - 10PM
NFFTY 2017 Opening Night At Cinerama Theater.
April 28 2PM
to
April 30 11:59PM
Lane closures on Stewart St. between 9th Ave. and 7th Ave. Beginning at 2PM on Friday, Stewart St. will be reduced to two lanes between 9th Ave. and 7th Ave. during roadway restoration work.  At 4:30AM Saturday morning, Stewart St. will be reduced to one lane.  In addition, 9th Ave, 8th, and 7th Ave. will be reduced to one lane.
April 28
5PM - 8PM
Cornish College of the Arts BFA Expo 2017 Event will close Terry Ave. between Lenora St. and Virginia St.
April 29
10AM - 12:30PM
People's Climate March SPD will escort the march from Occidental Park to Westlake Park via 4th Ave.
May 1
8:30AM - 11AM
May Day: Veteran Anti-Way Formation Walk from Benaroya Hall to Judkins Park using sidewalks only.
May 1
11AM - 6PM
Immigrant Rights March - Defend Our Rights SPD will escort march from Judkins Park to Westlake Park.
May 2
to
July 2017
3rd Ave. reduced to one lane in each direction between Virginia St. and Blanchard St. Crews will reduce 3rd Ave. to one lane in each direction between Virginia St. and Blanchard St. during the 3rd Ave. Arterial Paving Project.
May 6
9AM - 11AM
March of Dimes March for Babies Walk from Seattle Center to Downtown and back.
May 2
to
early-2018
3rd Ave. Arterial Paving Project The Seattle Department of Transportation will repave 3rd Ave. through Belltown (Virginia St to Broad St).  Construction is currently slated to begin on Tuesday, May 2.  Crews will work from south to north, with the project area divided into four construction zones.  Work must be substantially complete in one zone before the contractor moves onto the next.
Zone 1
May 2
through
June
The first zone will be from Virginia to mid-block north of Lenora.  They will initially work on the center lanes in this zone, with traffic restricted to a single curb lane of traffic in each direction.  This work is expected to take about two weeks to complete, after which construction will shift to the east side of 3rd Ave, with a single lane of traffic in each direction on the west side of the street.  These traffic configurations will remain in place 24/7 until this phase of construction has been completed.
January 2017
to
Fall 2017
2nd Ave. Mobility Improvements Project The Seattle Department of Transportation is making traffic signal improvements and extending the existing 2-way protected bike lane along 2nd Ave from Pike St to Denny Way. These improvements will organize the street and move people more efficiently.  Construction will start in early 2017 and the new protected bike lane is scheduled to open in fall 2017.
February 13
to
April 28
Sidewalk, parking lane, and traffic lane restrictions on 2nd Ave. between Denny Way and Pike St. during potholing for underground utilities, and signal and foundation work.  During working hours, one lane will remain open at all times north of Lenora St; two lanes will remain open south of Lenora St. Work hours are 7AM to 6PM weekdays.  Intermittent lane closures on cross-streets are also possible during working hours.
March 2017
to
July 2017
Seattle City Light Project -
6th Ave. & Cherry St. Duct Bank Installation Project
Seattle City Light plans to install a duct bank between existing electrical vaults at 6th Ave. and Cherry St.  During the last phase of this project, crews will work on the intersection of 6th Ave. and Cherry St., and continue into the south side of Cherry St.  During work hours, 6th Ave. and Cherry St. will be reduced to two lanes. Parking may also be restricted.  Work hours are 9AM to 3PM weekdays, and 9AM to 6PM weekends.
Stage 1
February 29
to
Fall 2016
Denny Network project Construction of the Denny substation network will begin on Minor Avenue and on Stewart Street. The contractor plans to begin by installing two large vaults – one on Minor Avenue and one on Stewart Street just south of Minor Avenue. They then plan to connect the vaults with underground duct banks. Work will proceed in this manner down Stewart Street to 6th Avenue. This stage of work is expected to be complete in the third quarter of 2016.
March 6
to
April 28
8PM - 4AM
weekdays
Eastbound Virginia St. reduced to one lane at 8th Ave. during the installation of a new duct bank.  8th Ave. will also be reduced to one lane.
April 27
May 14
7AM - 3PM
Eastbound Virginia St. reduced to one lane between 9th Ave. and 8th Ave. during the installation of a new duct bank.
March 20
to
April 27
7AM - 3PM
weekdays
Westbound Harrison St. closed between Fairview Ave. N. and Minor Ave. N. during the installation of a new electrical duct bank.
April 19 - 28
8PM - 5AM
weekdays
Westbound Harrison St. closed at Boren Ave. during the installation of a new electrical duct bank.
March 20
to
April 21
24/7
Southbound Pontius Ave. N. closed between Thomas St. and John St. during the installation of a new electrical duct bank.
April 12 - 24
24/7
Eastbound Harrison St. closed between Minor Ave. N. and Pontius Ave. N. during the installation of a new electrical duct bank.
April 24
to
May 5
24/7
Southbound Pontius Ave. N. closed between Republican and Harrison St. during the installation of a new electrical vault.
April 4, 2016 Denny Substation project Pontius Ave. N. permanently closed between Denny Way and John St.
Until further notice
24/7
Crews continue excavating and hauling inside the substation work site. Work hours are 7AM to 7PM weekdays, and 9AM to 5PM Saturday.
March 27
to
April 10
24/7
Northbound Minor Ave. N. closed between Denny Way and Thomas St. during underground utility work.  Southbound access will be maintained from Thomas St. and John St.
March 27
to
April 10
24/7
Westbound John St. closed between Minor Ave. N. and Pontius Ave. N. closed during underground utility work.  Eastbound traffic will be maintained.
April 11 - 27
24/7
Northbound Minor Ave. N. closed between Denny Way and Thomas St. during underground utility work.  Southbound access will be maintained from Thomas St. and John St.
April 11 - 27
24/7
Eastbound John St. closed between Fairview Ave. N. and Minor Ave. N. closed during underground utility work.  Westbound traffic will be maintained.
May 2016
to
Fall 2017
24/7
Yesler Bridge Rehabilitation Project The Seattle Department of Transportation will be rehabilitating the Yesler Way Bridge, located at the intersection of Yesler Way and Terrace St over 4th Ave S, starting as soon as May 2016 and lasting through fall 2017.  Traffic impacts will include: Yesler Way closed in both directions between 3rd Ave. and midway between 5th Ave. and 6th Ave; Terrace St. closed to through traffic, open to local access; 4th Ave. will have ongoing lane closures and occasional full nighttime and weekend closures; sidewalks on either side of 4th Ave. will have alternating closures; transit and bicycle detours in the project area.
January 3
through
April 2017
24/7
Crews will close the sidewalk and adjacent travel lane on the east side of 4th Ave S. between S. Washington St. and Jefferson St. during widening of the bridge footings, and installation of a large electrical utility vault next to the eastern bridge abutment.  A signed detour will be in place.
Until further notice
24/7
Elliott Bay Seawall Project Traffic on Alaskan Wy. S./Alaskan Wy. will be shifted to beneath the Viaduct between S. King St. and Pike St.  Traffic will also be shifted to the east side of Alaskan Wy. between Pike St. and Virginia St.
Until further notice
24/7
As seawall construction expands to the area adjacent to Colman Dock, ferry access for bicyclists and vehicles will shift to Yesler Wy.  Pedestrian access will be maintained via the Marion St. pedestrian bridge, and at street-level between Marion and Columbia St.
Until further notice
24/7
The Marion St. driveway at the Colman Dock shifts north, between Marion St. and Madison St.  During this time most vehicles will exit Colman Dock at Yesler Wy.  All trucks over 30' must exit at Yesler Wy.  Vehicular traffic directed to exit at the Marion St. driveway will turn right or left onto Alaskan Wy.  
October 5 2015
to
June 30 2016
Construction resumes on the waterfront between University St. and Madison St.
January 4
to
mid-2017
Seawall construction begins between Pine and Pike Streets.  Impacts include: removal of on-street parking and trees between Virginia St. and Pike St; removal of the sidewalk on the west side of street; installation of a water treatment facility at Virginia St. and Alaskan Wy.  Access to the Seattle Aquarium, Waterfront Park, and businesses will remain open.
Until Further Notice SR 99 Tunnel Project Parking under the Alaskan Way Viaduct is permanently closed between S King St and Pike St.
Until Further Notice Alaskan Way S.  is closed between S Atlantic St and Madison St until further notice.  Two-way traffic has been re-routed under the Alaskan Way Viaduct and Railroad Way S via 1st Ave S.
Until the SR 99 Tunnel opens to traffic 6th Ave N is closed between Thomas St and Republican St.  Harrison St is closed between Aurora Ave N and Broad St.  Republican St is closed between Aurora Ave N and 6th Ave N.
Until Further Notice 1201 2nd Ave.
2+U

1st & 2nd Ave. between University and Seneca; Seneca & University between 1st and 2nd

38-story office building
Opening: 2019
Construct 38-story office building.  Intermittent closure of sidewalk, parking, and travel lanes on 1st and 2nd Ave. between Seneca St. and University St, and on Seneca and University St. between 1st and 2nd Ave.
Until Further Notice 505 Madison St.
Madison Centre

SW corner of 5th & Madison
37-story office tower

Estimated completion: 2017
Intermittent sidewalk and curb lane closures on the east side of 5th Ave. between Madison St. and Marion St, on the south side of Madison St. from 5th east to the alley, and on the north side of Marion St. from 5th east to the alley.
Until Further Notice 811 5th Ave.
The Mark

NW corner of 5th & Columbia
43-story high rise tower

Estimated completion: April 2017
24/7 closure of sidewalk and curb lane on the west side of 5th Ave. between Marion St. and Columbia St, and on the north side of Columbia St. between 5th Ave. and 4th Ave.  Closure of west travel lane on 5th between Marion and Columbia during working hours.
Until Further Notice 204 Pine St.
2nd Ave. between Pine and Stewart
40-story apartment building
Opening: 2017
Construct 40-story tower.  Intermittent closure of sidewalk and curb lane on the east side of 2nd Ave. between Stewart St. and Pine St, and on the north side of Pine St. between 2nd Ave. and 3rd Ave.  The alley to the east will also be closed.
Until Further Notice
24/7
2301 6th Ave.

707 residential units with ground-floor retail.

Opening: 2015
Intermittent sidewalk, curb lane, and traffic lane closures on  the east side of 5th Ave. between Battery St. and Bell St, the south side of Battery St. between of 5th Ave. and 6th Ave, the north side of Bell St. between of 6th Ave. and 5th Ave, and the west side of 6th Ave. between Bell St. and Battery St.
Until Further Notice
24/7
2021 7th Ave.
2101 7th Ave.

Block 14 & 19
Intermittent sidewalk, curb lane, and traffic lane closures on 7th Ave. between Lenora St. and Westlake Ave, on Lenora St. between of 7th Ave. and 6th Ave, on 6th Ave. between Lenora St. and Virginia St, on Virginia St. between 6th Ave. and Westlake Ave, on Westlake Ave. between 7th Ave. and Westlake Ave, and on Blanchard St. between 6th Ave. and 7th Ave.
Until Further Notice 1901Western Ave.
MarketFront

Retail space and apartment building

Opening: 2017
Sidewalk, curb lane, and southbound travel lane on the west side of Western Ave, south of Pine St, closed for construction activities.
East Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 22
8AM - 11AM
Tenacious Ten 10-mile and 10K runs start and finish at Gas Works Park.  Routes will use streets, sidewalks, and trails in Fremont and Ballard, and around Lake Union.
April 22
10AM - 1PM
March for Science SPD will escort a march from the Cal Anderson Park to Seattle Center.  From 11th & Pine, route will go west on Pine, north on 4th, north on Cedar, north on 5th, and west on Harrison onto the Seattle Center campus.
April 29
6:30AM - 11AM
Lane closures on the Montlake Bridge Crews will close the northbound and southbound left lanes across the Montlake Bridge during bridge deck repairs.
May 6
9:30AM - 5PM
Fiesta 5K Ole and Taco Truck Challenge Run on streets around Volunteer Park begins at 9:30AM.  Taco Truck Challenge in Park begins at 11AM.
January 9
to
Summer 2017
Seattle City Light Project -
E. Union St. Underground Conversions Project
A Seattle City Light contractor will be working in the Capitol Hill neighborhood to install underground electrical conduit, vaults and associated equipment in parts of E. Union St. from 10th to 11th Ave. This work is aligned with the City of Seattle’s ordinance to underground power lines in this area.  Work is expected to last 5 months.
January 9
to
February 2017
Stage 1
On E. Union St, crews will work on one side of the street at a time during construction.  Customers can expect temporary travel lanes, parking restrictions, sidewalk and bike lane impacts within this work zone.  This phase of work is anticipated for completion in late-February 2017.
February 2017
to
late-April 2017
Stage 2
Crews are continuing their work for Stage 2 along East Union Street and 10th Ave.   Customers can expect temporary travel lanes, parking restrictions, sidewalk and bike lane impacts within this work zone.  This phase of work is anticipated for completion in late-April 2017.
mid-March 2017
to
early-May 2017
Stage 3
Stage 3 work will occur on 11th Ave. between E. Union St. and E. Madison St.   Customers can expect temporary travel lanes, parking restrictions, sidewalk and bike lane impacts within this work zone.  This phase of work is anticipated for completion in early-May 2017.
May 2017
Stage 4
Stage 4 work will occur on E. Union St. between 11th Ave. and 12th Ave.   Customers can expect temporary travel lanes, parking restrictions, sidewalk and bike lane impacts within this work zone.
January 2015
Through
Summer 2017
WSDOT I-90 Two-Way Transit and HOV Operations - Stage 3 Project will add an HOV lane in each direction of the outer roadway between Seattle and Mercer Island; build an eastbound HOV direct access exit ramp at Island Crest Way on Mercer Island; Upgrade I-90 tunnels fire and life safety systems in Seattle and Mercer Island; prepare the center roadway for Sound Transit's 14-mile East Link rail extension from Seattle to Redmond.
Until further notice
9PM - 5AM
Intermittent nighttime lane closures on eastbound and westbound I-90 between I-5 and Bellevue during dowel bar retrofit.
April 21 - 24 Westbound I-90 reduced to one lane between Bellevue and Seattle.  Traffic will be detoured to the I-90 express lanes.
May 5 - 8 Eastbound I-90 reduced to one lane between Seattle and Bellevue.  Traffic will be detoured to the I-90 express lanes.
May 12 - 15 Westbound I-90 reduced to one lane between Bellevue and Seattle.  Traffic will be detoured to the I-90 express lanes.
North Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 22
8AM - 11AM
Tenacious Ten 10-mile and 10K runs start and finish at Gas Works Park.  Routes will use streets, sidewalks, and trails in Fremont and Ballard, and around Lake Union.
April 30
8:30AM - 11AM
Top Pot Doughnut Dash Run will use streets and trails around Green Lake.
May 7
10AM - 5PM
Mobile Food Rodeo - Taco Libre On N. Canal St. in Fremont.
Until Further Notice 1301 Dexter Ave. N.
Leeward

296-unit apartment building

Opening: 2017
Intermittent sidewalk, parking lane, and bike lane closures on the west side of Dexter Ave. N. between Lee St. and Comstock St.
Northeast Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 22
8AM - 11AM
Tenacious Ten 10-mile and 10K runs start and finish at Gas Works Park.  Routes will use streets, sidewalks, and trails in Fremont and Ballard, and around Lake Union.
April 22
10AM - 2PM
Husky Football Preview & Fan Fest At Husky Stadium.
April 23
5AM - 10:30AM
Lane closures on southbound I-5 between NE 50th St. and the Ship Canal Bridge Two right lanes of southbound I-5 closed on the Ship Canal Bridge during roadway maintenance.  In addition, the NE 50th St. on-ramp to southbound I-5 will be closed.
April 29
6:30AM - 11AM
Lane closures on the Montlake Bridge Crews will close the northbound and southbound left lanes across the Montlake Bridge during bridge deck repairs.
April 30
8:30AM - 11AM
Top Pot Doughnut Dash Run will use streets and trails around Green Lake.
May 6
10AM - 4PM
Opening Day of Boating Season Boat parade will close the Montlake Bridge from approximately 10AM to 4PM.
Until further notice Sound Transit
Northgate Link Extension Project
Northgate Station
Parking is temporarily removed on the west side of 1st Ave. NE between NE 92nd St. and NE 95th St.
Until further notice The North Seattle Park-and-Ride lot and interim Park-and-Ride lot located near the former Marie Callender's restaurant in Northgate will close Monday, March 17, 2016.  The new interim Park-and-Ride will be located at the NW corner of NE 103rd St. and 5th Ave. NE.
Until further notice Upcoming construction of the Northgate light rail station will occupy space in the Northgate Park-and-Ride (West).  Fencing will go up around the middle section of the West lot as early as Dec. 7, 2016.  To offset the loss of those stalls, the north end of the former North Seattle Park & Ride will reopen on the west side of 1st Ave NE between NE 100th and 103rd Streets. 
October 1
through
2019
Sound Transit
Northgate Link Extension Project
Roosevelt Station
NE 66th St. and NE 67th St. between 12th Ave. NE and Roosevelt Wy. NE closed to through traffic.  The sidewalk and parking lane on the west side of 12th Ave. NE between NE 65th St. and NE 68th St. will also be closed.
Through
2020
Sound Transit
Northgate Link Extension Project
University District Station
Brooklyn Ave. NE closed between NE 45th St. and NE 43rd St.  NE 43rd St. closed between Brooklyn Ave. NE and the alley to the west.  NE 43rd St. eastbound only between Brooklyn Ave. NE and the alley to the east.
September 2015
to
Summer 2017
SR520 West Approach Bridge North Project 24th Ave. E. overpass closed to pedestrians and bicyclists during project.
April 17 - 20
April 24 - 27
May 1 - 4
9PM - 6AM
Westbound SR520 intermittently reduced to one lane at night between Bellevue and Montlake Blvd. during barrier placement and fire protection installation. 
May 1 - 5
7AM - 5PM
Arboretum Waterfront Trail closed on Foster Island during bridge removal work.
Northwest Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 22
8AM - 11AM
Tenacious Ten 10-mile and 10K runs start and finish at Gas Works Park.  Routes will use streets, sidewalks, and trails in Fremont and Ballard, and around Lake Union.
May 7
9:30AM - 111AM
Ballard Locks Centennial 5K Run starts and finishes at Ballard Locks.
May 7
10AM - 5PM
Mobile Food Rodeo - Taco Libre On N. Canal St. in Fremont.
SODO Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 17 - 28
7AM - 4PM
Weekdays
S. Washington St. closed between 5th Ave. S. and 6th Ave. S. Crews will close S. Washington St. between 5th Ave. S. and 6th Ave. S. during the installation of a Seattle City Light duct bank.
April 21 & 22
8:30PM - 12:30AM
deadmau5 concerts At WaMu Theater.  Doors open at 7:30PM.
April 22 & 23
4AM - 10PM
Lane closures on 1st Ave. S. north of S. Royal Brougham Way Crews will close the left lane of northbound and southbound 1st Ave. S, north of S. Royal Brougham Way, during repairs to manholes.
April 24
8PM - 11PM
The xx concert At WaMu Theater.  Doors open at 7PM.
April 26
8PM - 11PM
Bastille concert At WaMu Theater.  Doors open at 7PM.
April 29
10AM - 12:30PM
People's Climate March SPD will escort the march from Occidental Park to Westlake Park via 4th Ave.
April 29
7PM - 9PM
Seattle Sounders vs. New England At CenturyLink Field.
April 30
8PM - 11PM
The 1975 concert At WaMu Theater.  Doors open at 7PM.
May 2
7:10PM - 10PM
Seattle Mariners vs. LA Angels At Safeco Field.
May 3
7:10PM - 10PM
Seattle Mariners vs. LA Angels At Safeco Field.
May 4
7:10PM - 10PM
Seattle Mariners vs. LA Angels At Safeco Field.
May 5
7:10PM - 10PM
Seattle Mariners vs. Texas Rangers At Safeco Field.
May 6
12PM - 2PM
Sounders vs. Toronto At CenturyLink Field.
May 6
6:10PM - 9PM
Seattle Mariners vs. Texas Rangers At Safeco Field.
May 7
1:10PM - 4PM
Seattle Mariners vs. Texas Rangers At Safeco Field.
May 2016
to
Fall 2017
24/7
Yesler Bridge Rehabilitation Project The Seattle Department of Transportation will be rehabilitating the Yesler Way Bridge, located at the intersection of Yesler Way and Terrace St over 4th Ave S, starting as soon as May 2016 and lasting through fall 2017.  Traffic impacts will include: Yesler Way closed in both directions between 3rd Ave. and midway between 5th Ave. and 6th Ave; Terrace St. closed to through traffic, open to local access; 4th Ave. will have ongoing lane closures and occasional full nighttime and weekend closures; sidewalks on either side of 4th Ave. will have alternating closures; transit and bicycle detours in the project area.
January 3
through
April 2017
24/7
Crews will close the sidewalk and adjacent travel lane on the east side of 4th Ave S. between S. Washington St. and Jefferson St. during widening of the bridge footings, and installation of a large electrical utility vault next to the eastern bridge abutment.  A signed detour will be in place.
Until further notice
24/7
Elliott Bay Seawall Project Traffic on Alaskan Wy. S./Alaskan Wy. will be shifted to beneath the Viaduct between S. King St. and Pike St.  Traffic will also be shifted to the east side of Alaskan Wy. between Pike St. and Virginia St.
Until further notice
24/7
As seawall construction expands to the area adjacent to Colman Dock, ferry access for bicyclists and vehicles will shift to Yesler Wy.  Pedestrian access will be maintained via the Marion St. pedestrian bridge, and at street-level between Marion and Columbia St.
Until further notice
24/7
The Marion St. driveway at the Colman Dock shifts north, between Marion St. and Madison St.  During this time most vehicles will exit Colman Dock at Yesler Wy.  All trucks over 30' must exit at Yesler Wy.  Vehicular traffic directed to exit at the Marion St. driveway will turn right or left onto Alaskan Wy.  
October 5 2015
to
June 30 2016
Construction resumes on the waterfront between University St. and Madison St.
January 4
to
mid-2017
Seawall construction begins between Pine and Pike Streets.  Impacts include: removal of on-street parking and trees between Virginia St. and Pike St; removal of the sidewalk on the west side of street; installation of a water treatment facility at Virginia St. and Alaskan Wy.  Access to the Seattle Aquarium, Waterfront Park, and businesses will remain open.
Until Further Notice SR 99 Tunnel Project Parking under the Alaskan Way Viaduct is permanently closed between S King St and Pike St.
Until Further Notice Alaskan Way S.  is closed between S Atlantic St and Madison St until further notice.  Two-way traffic has been re-routed under the Alaskan Way Viaduct and Railroad Way S via 1st Ave S.
Until the SR 99 Tunnel opens to traffic 6th Ave N is closed between Thomas St and Republican St.  Harrison St is closed between Aurora Ave N and Broad St.  Republican St is closed between Aurora Ave N and 6th Ave N.
February 17
to
late-April
Seattle City Light Project -
S. Washington St. Reliability Upgrade Project
Lane, parking, and pedestrian restrictions on S. Washington St. between 1st Ave. S. and Occidental Ave. S. during replacement of existing underground electrical conduits.  During work in the 1st & Washington intersection, crews will alternately close the northbound or southbound lanes of traffic on 1st Ave. S. (one lane of traffic in each direction will be maintained at all times). Work hours are 9AM to 3PM weekdays, and 9AM to 6PM weekdays.
Early - May 2017
to
Mid-July 2017
Seattle City Light Project -
S. Main St. Reliability Upgrade Project
Lane, parking, and pedestrian restrictions on S. Main St. between 1st Ave. S. and Occidental Ave. S. during replacement of existing underground electrical conduits.  During work in the 1st & Main intersection, lanes will be reduced and detours in effect (intersection work will take place on weekends only). Work hours are 9AM to 3PM weekdays, and 9AM to 6PM weekdays.
Until Further Notice
24/7
255 S. King St.
(North Lot of CenturyLink Field)

23-story hotel tower (282 rooms) and an 18-story office tower  with retail and parking

Estimated completion: Mid-2017
Construct two towers connected by podium for hotel, office, convention center, parking garage and retail space.
Until Further Notice
24/7
450 Alaskan Way S.

8-story office building

Estimated completion: Q3 2017
Construct 8-story office building with ground floor retail.  Intermittent sidewalk, parking lane, and travel lane closures on  the north side of S. King St. between Alaskan Way S. and 1st Ave. S.
Until Further Notice
24/7
589 Occidental Ave. S.
Gridiron Condominiums

11-story/107 units

Estimated completion: Summer 2017
Construct 11-story condominiums with ground floor retail.  Intermittent sidewalk, parking lane, and travel lane closures on  the north side of Railroad Way S. between 1st Ave. S. and Occidental Ave. S, and the west side of Occidental Ave. S, north of Railroad Way S.
West Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
May 1 - 4
9PM - 5AM
Westbound Fauntleroy Expressway closed  The westbound lanes of the Fauntleroy Expressway will be closed nightly for street light repairs.  Westbound traffic will be detoured off the Expressway at the Delridge Way off-ramp.
South Seattle Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 21 11PM
to
April 24 5AM
Westbound I-90 reduced to one lane between Bellevue and Seattle Westbound I-90 reduced to one lane; traffic detoured to express lanes.  In addition, the westbound I-90 off-ramps to Rainier Ave. S. will also be closed.
May 1
11AM - 6PM
Immigrant Rights March - Defend Our Rights SPD will escort march from Judkins Park to Westlake Park.
May 5 11PM
to
May 8 5AM
Eastbound I-90 reduced to one lane between Seattle and Bellevue Eastbound I-90 reduced to one lane; traffic detoured to express lanes.  In addition, the northbound and southbound Rainier Ave. S. on-ramps to eastbound I-90 will also be closed.
South Lake Union Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 21
6AM - 1PM
Lane closures on Mercer St. between Boren Ave. N. and Fairview Ave. N. Crews will close the eastbound curb lane and adjacent sidewalk on  Mercer St. between Boren Ave. N. and Fairview Ave. N. during concrete pumping.
April 21
7AM - 4PM
We Day At KeyArena.  Buses will pick-up and drop-off students on streets adjacent to the venue.  Expect congestion and delays in the South Lake Union neighborhood during the morning and afternoon commute.
April 22
3AM - 9PM
Dexter Ave. N. closed between Galer St. and Comstock St. Crews will close Dexter Ave. N. between Galer St. and Comstock St. during crane work.
April 22 & 23
4AM - 10PM
Lane closures on Fairview Ave. N. between Mercer St. and Republican St. Crews will close all southbound lanes of Fairview Ave. N. between Mercer St. and Republican St. during the installation of a new side sewer.  In addition, northbound Fairview Ave. N. will be reduced to one lane between Republican and Mercer.
April 22
8AM - 11AM
Tenacious Ten 10-mile and 10K runs start and finish at Gas Works Park.  Routes will use streets, sidewalks, and trails in Fremont and Ballard, and around Lake Union.
April 22
10AM - 1PM
March for Science SPD will escort a march from the Cal Anderson Park to Seattle Center.  From 11th & Pine, route will go west on Pine, north on 4th, north on Cedar, north on 5th, and west on Harrison onto the Seattle Center campus.
April 26
7:30PM - 10PM
The Weekend concert At KeyArena.  Doors open at 6:30PM
April 28
6AM - 3PM
Lane closures on Mercer St. between Boren Ave. N. and Fairview Ave. N. Crews will close the eastbound curb lane and adjacent sidewalk on  Mercer St. between Boren Ave. N. and Fairview Ave. N. during concrete pumping.
April 28 7PM
to
May 1 5AM
Broad St. closed between 1st Ave. and 3rd Ave. Crews will close Broad St. between 1st Ave. and 3rd Ave. during the installation of conduit.  1st, 2nd, and 3rd Avenues will remain open.
April 29
5:30PM - 8PM
The Match for Africa - Rodger Federer vs. John Isner At KeyArena.
May 4
7PM - 10PM
Chris Tomlin Presents Worship Night in America At KeyArena.  Doors open at 6:30PM
May 6
9AM - 11AM
March of Dimes March for Babies Walk from Seattle Center to Downtown and back.
May 6
10AM - 5PM
Art Rising Event will close John St. between Dexter Ave. N. and Westlake Ave. N.  Event is in collaboration with the Reopening Celebration of Denny Park and the SLU Saturday Market.
Stage 1
February 29
to
Fall 2016
Denny Network project Construction of the Denny substation network will begin on Minor Avenue and on Stewart Street. The contractor plans to begin by installing two large vaults – one on Minor Avenue and one on Stewart Street just south of Minor Avenue. They then plan to connect the vaults with underground duct banks. Work will proceed in this manner down Stewart Street to 6th Avenue. This stage of work is expected to be complete in the third quarter of 2016.
March 6
to
April 28
8PM - 4AM
weekdays
Eastbound Virginia St. reduced to one lane at 8th Ave. during the installation of a new duct bank.  8th Ave. will also be reduced to one lane.
April 27
May 14
7AM - 3PM
Eastbound Virginia St. reduced to one lane between 9th Ave. and 8th Ave. during the installation of a new duct bank.
March 20
to
April 27
7AM - 3PM
weekdays
Westbound Harrison St. closed between Fairview Ave. N. and Minor Ave. N. during the installation of a new electrical duct bank.
April 19 - 28
8PM - 5AM
weekdays
Westbound Harrison St. closed at Boren Ave. during the installation of a new electrical duct bank.
March 20
to
April 21
24/7
Southbound Pontius Ave. N. closed between Thomas St. and John St. during the installation of a new electrical duct bank.
April 12 - 24
24/7
Eastbound Harrison St. closed between Minor Ave. N. and Pontius Ave. N. during the installation of a new electrical duct bank.
April 24
to
May 5
24/7
Southbound Pontius Ave. N. closed between Republican and Harrison St. during the installation of a new electrical vault.
April 4, 2016 Denny Substation project Pontius Ave. N. permanently closed between Denny Way and John St.
Until further notice
24/7
Crews continue excavating and hauling inside the substation work site. Work hours are 7AM to 7PM weekdays, and 9AM to 5PM Saturday.
March 27
to
April 10
24/7
Northbound Minor Ave. N. closed between Denny Way and Thomas St. during underground utility work.  Southbound access will be maintained from Thomas St. and John St.
March 27
to
April 10
24/7
Westbound John St. closed between Minor Ave. N. and Pontius Ave. N. closed during underground utility work.  Eastbound traffic will be maintained.
April 11 - 27
24/7
Northbound Minor Ave. N. closed between Denny Way and Thomas St. during underground utility work.  Southbound access will be maintained from Thomas St. and John St.
April 11 - 27
24/7
Eastbound John St. closed between Fairview Ave. N. and Minor Ave. N. closed during underground utility work.  Westbound traffic will be maintained.
Mid-January
to
Spring 2017
Seattle City Light Project -
Harrison St. Electrical Improvements Project
Seattle City Light is working to increase the reliability of the electrical system in the South Lake Union neighborhood by excavating for new electrical vaults and a conduit (duct bank). This work will be done in four stages
January 9
to
early-March 2017
Stage 1
Crews will be breaking street pavement on Harrison St. between Dexter Ave. N. and 8th Ave. N. to install the new electrical vault and conduit. During construction, Harrison St. will be closed to all westbound traffic from Dexter Ave. N. to 8th Ave. N, but open to all eastbound traffic.
early-March 2017
to
late-April 2017
Stage 2
Crews will be breaking street pavement on Harrison St. at 8th Ave. N. to install the new electrical vault and conduit. During construction, one lane of alternating traffic will be open at all times.
Mid-July 2017
Stage 3
On Harrison St. between 8th Ave. N. and 9th Ave. N.  During work hours, Harrison St. will be closed and traffic detoured.
24/7
Until further notice
WSDOT North Access Project Sidewalk on east and west side of Aurora Ave. N. closed between Harrison St. and Mercer St.
24/7
Until further notice
Republican St. closed between Aurora Ave. N. and Dexter Ave. N.  Local Access from Dexter Ave. N. to alley only.
April 25
10AM - 2PM
Left lane of southbound Aurora Ave. N. closed between Raye St. and the Dexter Way N. off-ramp during overhead sign maintenance.
Until Further Notice
24/7
400 Dexter Ave. N.

11-story office building with ground floor commercial space

Opening: 2017
Intermittent sidewalk, curb lane, and traffic lane closures on the east side of Dexter Ave. N. between Republican St. and Harrison St, on the south side of Republican from Dexter Ave. N. east to the alley, and on the north side of Harrison St. from Dexter Ave. N. east to the alley.
Until Further Notice
24/7
435 Dexter Ave. N.

294 unit apartment building in a 7-story building

Opening: 2017
Intermittent sidewalk, curb lane, and traffic lane closures on the west side of Dexter Ave. N. between Republican St. and Harrison St.
Until Further Notice
24/7
222 Fairview Ave. N.

7-story apartment building with retail space

Opening: 2017
Intermittent sidewalk, curb lane, and traffic lane closures on the east side of Fairview Ave. N. between Thomas St. and John St., the north side of John St. east of Fairview Ave. N, and the south side of Thomas St. east of Fairview Ave. N.
Until Further Notice
24/7
221 Minor Ave. N.

7-story apartment building with retail space

Opening: 2017
Intermittent sidewalk, curb lane, and traffic lane closures on the west side of Minor Ave. N. between Thomas St. and John St., the north side of John St. west of Minor Ave. N, and the south side of Thomas St. west of Minor Ave. N.
Until Further Notice
24/7
300 Boren Ave. N. - Troy Block

Two office building with retail space and underground parking

Opening: 2017
Intermittent sidewalk, curb lane, and traffic lane closures on the streets bounded by project: Fairview Ave. N, Thomas St, Boren Ave. N, and Harrison St.
Until Further Notice
24/7
400 Fairview Ave. N.

13 floor office building with ground-floor retail and 5 floors of underground parking.

Opening: 2017
Intermittent sidewalk, curb lane, and traffic lane closures on  the east side of Fairview Ave. N. between Republican St. and Harrison St, on the south side of Republican east of Fairview, and on the north side of Harrison east of Fairview.
Until Further Notice
24/7
501 Fairview Ave. N. - Urban Union

12-story office and retail space, with parking for 375 vehicles

Opening: 2016
Intermittent sidewalk, curb lane, and traffic lane closures on  the west side of Fairview Ave. N. north of Republican St, and the north side of Republican St. west of Fairview Ave. N.
SR 99 Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
Until Further Notice SR 99 Tunnel Project Parking under the Alaskan Way Viaduct is permanently closed between S King St and Pike St.
Until Further Notice Alaskan Way S.  is closed between S Atlantic St and Madison St until further notice.  Two-way traffic has been re-routed under the Alaskan Way Viaduct and Railroad Way S via 1st Ave S.
Until the SR 99 Tunnel opens to traffic 6th Ave N is closed between Thomas St and Republican St.  Harrison St is closed between Aurora Ave N and Broad St.  Republican St is closed between Aurora Ave N and 6th Ave N.
24/7
Until further notice
WSDOT North Access Project Sidewalk on east and west side of Aurora Ave. N. closed between Harrison St. and Mercer St.
24/7
Until further notice
Republican St. closed between Aurora Ave. N. and Dexter Ave. N.  Local Access from Dexter Ave. N. to alley only.
April 25
10AM - 2PM
Left lane of southbound Aurora Ave. N. closed between Raye St. and the Dexter Way N. off-ramp during overhead sign maintenance.
I-5 / I-90 / SR520 Planned Construction / Events
Date(s) and Times Project Name / Agency Description of Traffic Impacts
April 21 11PM
to
April 24 5AM
Westbound I-90 reduced to one lane between Bellevue and Seattle Westbound I-90 reduced to one lane; traffic detoured to express lanes.  In addition, the westbound I-90 off-ramps to Rainier Ave. S. will also be closed.
April 23
5AM - 10:30AM
Lane closures on southbound I-5 between NE 50th St. and the Ship Canal Bridge Two right lanes of southbound I-5 closed on the Ship Canal Bridge during roadway maintenance.  In addition, the NE 50th St. on-ramp to southbound I-5 will be closed.
April 29 & 30 I-5 Express Lanes closed The I-5 Express Lanes will remain closed Saturday and Sunday until 1:45PM during roadway maintenance.  The Express Lanes will reopen in the northbound direction at 1:45PM.
May 5 11PM
to
May 8 5AM
Eastbound I-90 reduced to one lane between Seattle and Bellevue Eastbound I-90 reduced to one lane; traffic detoured to express lanes.  In addition, the northbound and southbound Rainier Ave. S. on-ramps to eastbound I-90 will also be closed.
January 2015
Through
Summer 2017
WSDOT I-90 Two-Way Transit and HOV Operations - Stage 3 Project will add an HOV lane in each direction of the outer roadway between Seattle and Mercer Island; build an eastbound HOV direct access exit ramp at Island Crest Way on Mercer Island; Upgrade I-90 tunnels fire and life safety systems in Seattle and Mercer Island; prepare the center roadway for Sound Transit's 14-mile East Link rail extension from Seattle to Redmond.
Until further notice
9PM - 5AM
Intermittent nighttime lane closures on eastbound and westbound I-90 between I-5 and Bellevue during dowel bar retrofit.
April 21 - 24 Westbound I-90 reduced to one lane between Bellevue and Seattle.  Traffic will be detoured to the I-90 express lanes.
May 5 - 8 Eastbound I-90 reduced to one lane between Seattle and Bellevue.  Traffic will be detoured to the I-90 express lanes.
May 12 - 15 Westbound I-90 reduced to one lane between Bellevue and Seattle.  Traffic will be detoured to the I-90 express lanes.
September 2015
to
Summer 2017
SR520 West Approach Bridge North Project 24th Ave. E. overpass closed to pedestrians and bicyclists during project.
April 17 - 20
April 24 - 27
May 1 - 4
9PM - 6AM
Westbound SR520 intermittently reduced to one lane at night between Bellevue and Montlake Blvd. during barrier placement and fire protection installation. 
May 1 - 5
7AM - 5PM
Arboretum Waterfront Trail closed on Foster Island during bridge removal work.




Have the Seattle Area Construction Look Ahead delivered to your inbox

E-mail:

Subscribe (Join the list)

Unsubscribe (Remove me from the list)

Home | About Us | Contact Us | Site Index | News | FAQs | E-Mail Alerts