Route 44 - Transit-Plus Multimodal Corridor

Updated: September 21, 2020

Making bus trips faster and more reliable, and improving safety

What’s happening now?

Thanks to those who joined us for our online presentation and took our survey. We appreciate your questions and input throughout the design process. In case you missed it, we have posted a recording of the event below.

Work is scheduled to be complete in 2023.

Project overview

Partnering with King County Metro, we'll improve transit reliability, reduce transit travel times, and enhance pedestrian safety and access along the Route 44 corridor. Since 2019, we've been working to identify the improvement projects that will move forward into design. We began by studying a variety of possible improvements, and we held neighborhood drop-in sessions in fall 2019 to better understand community priorities along the corridor. Last year, we also received more than 800 responses to our community survey. (See our Fall 2019 Outreach Summary for more information.)

Improvements made as part of the Transit-Plus Multimodal Corridor may include:

  • Dedicated bus lanes and queue jumps: Bus-only lanes and signals that give buses a head start to separate buses from traffic and increase speed and reliability
  • Signal upgrades or optimization: Transit signal priority extends or activates green lights to reduce waiting times for buses at signals 
  • Channelization changes or turn restrictions: Changes to roadway channelization and limiting certain turns can allow buses to move faster, avoid conflicts, and improve safety
  • Safety improvements: Improvements to crossings and transit connections to help people get to bus stops more easily

The Route 44 corridor was identified in the 2012 Seattle Transit Master Plan (TMP) as a Priority Bus Corridor and in the 2016 TMP Update as a RapidRide corridor. King County Metro identifies the Route 44 corridor as a future RapidRide corridor in METRO CONNECTS, the King County Metro long-range plan adopted in January 2017. Metro is currently defining funding, timeline and phasing for delivery of the countywide METRO CONNECTS RapidRide Program. SDOT and Metro anticipate implementing transit speed and reliability upgrades in this corridor in 2023, prior to Metro's future delivery of RapidRide.

Route 44 background

Route 44 is one of the highest-ridership routes in Seattle, serving over 9,300 daily weekday riders. It is a 10.7 mile east-west trolley route in North Seattle that serves the Ballard, Wallingford, and University District neighborhoods, including the University of Washington and University of Washington Medical Center. It also provides important connections to several current and future major north-south transit routes. Over 35,000 people live within a quarter mile of the corridor and over 32,000 people work within a quarter mile of the corridor.

While the Route 44 is scheduled to arrive every 10 minutes or better, buses on this route can be slow and unreliable. This project will identify and implement improvements that provide faster, more reliable transit service for the Route 44.

Key transit connections

Route 44 connects with two RapidRide routes: the E Line at Aurora Ave/SR 99 and N 46th St and the D Line at 15th Ave NW and NW Market St. These RapidRide routes are the top 2 King County Metro routes by ridership. Additionally, Route 44 connects to the current terminus of the Sound Transit's University of Washington Link light rail Station.  Once the Northgate Link light rail extension is completed, Route 44 will also connect with the U District Station. 

See more on the RapidRide program update.

See more on the comprehensive assessment of the Levy to Move Seattle.

Project map

Project area map

Sidewalk work 

As a part of this project, we'll repair more than 4,500 linear feet of sidewalk near bus stops and upgrade more than 50 curb ramps to meet current ADA standards to improve access and mobility along the transit corridor. The sections of the corridor where we will make these sidewalk upgrades is shown on the map below. 

Map showing areas of sidewalk work

Other projects along this route

SDOT and Metro are focusing many investments along the Route 44 TPMC route. Our project team is in close coordination with the following projects: 

Community outreach

DateEvent
October 2019 Community Engagement Survey
November 2019 Open Houses: November 19, 20, and 21
May 2020 Release 30% Design Concepts
September 2020 Online presentation: September 10, 2020
September 2020 Community Engagement Survey

The three stages of our projects

Project Timeline

1. Planning
What we do: Collect traffic and transit data, review previously completed studies, develop concepts and gather community experiences to define options.

2. Design
What we do: We work with the community and produce a more detailed project design.

3. Construction
What we do: We construct the project and keep the community informed on the latest construction updates, schedule, and expected impacts.

Project materials

To view a PDF of project-related materials, please click on the links provided below. 

Design Phase

 Planning Phase

Funding

This project is being funded by a combination of Local and State funds.  The source of the local funding is  the 9-year Levy to Move Seattle, approved by voters in 2015, and the source of the state funding is a Washington State Regional Mobility Grant.

Translation

If you need this information translated, please call 206-256-5563.

如果您需要此信息翻譯成中文 請致電 206-256-5563.

Kung kailangan mo ang impormasyon na ito na nakasalin sa Tagalog mangyari lamang na tumawag sa 206-256-5563.

Si necesita traducir esta información al español, llame al 206-256-5563.

Odeeffannoon kun akka siif 206-256-5563.

Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi 206-256-5563.

የዚህን መረጃ ትርጉም ከፈለጉ፣ በዚህ ስልክ ቁጥር ይደውሉ፡ 206-256-5563.

ናይዚ ሓበሬታ ትርጉም እንተደሊኹም፣ በዚ ቁጽሪ ስልኪ ይድውሉ፡ 206-256-5563.

당신이 번역이 정보를 필요로하는 경우에, 206-256-5563 로 전화 해주십시오.