|
Street Use Publications, Forms and Client Assistance Memos
For more information, please call the Street Use Counter at (206) 684-5283. Client Assistance Memos CAM 2102 Certificate of Public Liability Property Damage Insurance; effective 4/5/2010 CAM 2103 Resolving Right of Way Permit Disagreements CAM 2105 What You Will Need to Apply for a Permit Online CAM 2106 Right-of-Way Improvements Manual Website CAM 2107 Holiday Construction Moratorium CAM 2108 Single Use or Annual Vehicle CAM 2109 Permittee Responsibilities CAM 2110 Steps to an Approved Traffic Control Plan CAM 2111 Checklist for Traffic Control Plan Submittal CAM 2112 Traffic Control Vendors CAM 2114 Temporary No Parking Signs and Easels CAM 2115 Calculating Areas and Fees for Temporary Use of the Right-of-Way CAM 2116 Site Plan Requirements for Temporary Construction Permits CAM 2118 Portable Storage Units Construction and Street Improvements CAM 2200 Street Improvement Permitting Process; effective date: 6/7/2010; last revised 6/2/2010. CAM 2201 90% Complete Street Improvement Plan (SIP) Requirements; effective 12/1/2009; last revised 3/26/10 CAM 2203 Dedication Requirements for Construction in Public Rights-of-Way CAM 2204 Driveways and Curb Cuts CAM 2205 Interpreting Pavement Opening and Restoration CAM 2206 Interdepartmental Permit Coordination for New Construction Projects; last revised 7/17/09 CAM 2208 Sidewalk Maintenance and Repair CAM 2209 Permitting Requirements for Street Improvements; effective 7/17/09 CAM 2211 Street Improvement Permitting (SIP) Design Guidance; effective 12/1/09 CAM 2212 Base Map and Survey Requirements for Street Improvement Plans (SIP); effective 4/5/2010. CAM 2213: 60% Complete Street Improvement Plan (SIP) Approval; effective 6/8/09 CAM 2214: 90% Street Improvement Plan (SIP) Intake Appointment and 90% Complete SIP Acceptance Processes; effective 7/27/09 CAM 2215: Permeable Pavement in the Right of Way; effective 12/1/09 CAM 2216: SDOT Street Improvement Permitting (SIP) Pre-Construction Process; effective 4/5/2010 CAM 2217: SDOT Street Improvement Permitting (SIP) Inspections; effective date: 6/7/2010 CAM 2300 Street Tree Planting Procedures CAM 2301 Guidelines for Affixing Seasonal Lighting CAM 2302 Tree Pruning or Removal Permits Request Information CAM 2303 Tree Service Companies with an Annual Equipment Permit CAM 2304 Planting Strip Paving & Tree Planting Rules CAM 2305 Gardening in Planting Strips CAM 2307 Tree Posting Standards CAM 2500 Street Use Permits for Special Activities CAM 2501: Sidewalk and Plaza Street-Food Vending CAM 2502 Neighborhood Block Party Permits CAM 2503 Sidewalk Cafe Permits CAM 2504 Festival Streets CAM 2505 Traffic Signal Control Box Artwork Permit CAM 2506 Painted Intersections CAM 2600 Utility Permit Requirements and Forms CAM 2601 Pavement Restoration for Utility Service Connections CAM 2602 Becoming a Registered Pavement Restoration Contractor CAM 2701 Term Permit Fee Methodology
Street Improvement Permitting (SIP) Forms and Packets Online Permitting Fax Transmittal Cover Sheet: PDF | DOC Application for a Street Use Permit Application for a Street Use Utility Permit Holiday Moratorium Exception Request Pavement Restoration Contractor Application packet Annual Street Use Permit application Templates Traffic Control Template - Sidewalk Reroute DPD Publications
|
|