What’s happening now?

Work on a new all way stop and curb ramps at the intersection of 8th Ave NE and NE 70th St has been temporarily put on hold. The Seattle Department of Transportation (SDOT) is working to finalize changes to the overpass with the Washington State Department of Transportation (WSDOT). Once WSDOT issues final approval, construction will begin on the overpass and intersection will begin. 

Once construction begins, traffic will be reduced to one lane on 8th Ave NE when necessary for construction. Flaggers will assist motorist and pedestrians through the work zone. Work is expected to last 4-6 weeks. Crews will also return to add a new protected bike lane and pedestrian lane to the NE 70th St overpass. Striping is expected to take 1 to 2 days. Traffic on the overpass will be reduced to one lane during painting. Flaggers will assist motorists and pedestrians through the work zone. 

Striping crews will also revise the reconfigured parking on NE 70th St between 8th Ave NE and Roosevelt Way NE. Additional striping at the corner of parking spaces will be added to clarify legal parking spaces and ensure that residents can access their driveways. Cars will not be allowed to park on the street during the revision of striping. "No Parking" signs will be placed at least 48 hours before the start of work. During striping, there will be temporary lane closures; they are expected to last no more than a few hours at one location.

NE 70th St and I5 crossing map

Crews will also revise the previously built curb ramp at the corner of 6th Ave NE and NE 71st St to ensure that it meets Americans with Disability Act (ADA) standards. The curb ramp will be lengthened and softer material will be added to its sides. To facilitate the work, 6th Ave NE will be closed on the south side of NE 71st St for 1 to 3 weeks. Local residents will be detoured to 5th Ave NE. NE 71st St, where it becomes NE 70th St, will be reduced to one lane when necessary; flaggers will direct traffic.

To receive information about the schedule and what to expect during construction, sign up for email updates.

Project Overview

Crossing improvements for people walking, biking, and driving are coming to NE 70th St between 6th Ave NE and 12th Ave NE. Improvements between 6th Ave NE and 8th Ave NE were requested by the community as part of the City's Neighborhood Street Fund (NSF). These improvements include new all-way stops at the intersections of NE 70th St at 8th Ave NE and 6th Ave NE, new crosswalks, a walkway, and protected bike lanes in both directions. We're also adding a protected bike lane on the south side of NE 70th St between 8th Ave NE and 12th Ave NE, and adding a neighborhood greenway connection on NE 70th between 12th Ave NE and 15th Ave NE. To facilitate the new bike lanes, parking will be consolidated to the south side of NE 70th St between 8th Ave NE and Roosevelt Way NE and removed between Roosevelt Way NE and 12th Ave NE on both sides of the street. Driveway access will be maintained.

Elements

  • New all-way stops at the intersections of NE 70th St at 8th Ave NE and 6th Ave NE
  • New curb bulbs and ramps at 6th Ave NE and 8th Ave NE
  • A painted walkway on the north side of the I-5 overpass
  • Protected bike lanes in both directions between 6th Ave NE and 8th Ave NE
  • Protected bike lane (eastbound) between 8th Ave NE and 12th Ave NE
  • Neighborhood greenway connection, including speed humps and new stop signs between 12th Ave NE and 15th Ave NE
  • New street lights on the southwest corner of NE 71st St and 6th Ave NE and the northeast corner of NE 70th St and 8th Ave NE

Benefits

  • Adds predictability for all travelers as they move through the NE 70th St and 8th Ave NE intersection
  • Enhances safety for people walking and biking
  • Provides a continuous sidewalk network on the north side of the street
  • Provides east/est bike connections from Green Lake to 15th Ave NE

Neighborhood greenway connection on NE 70th St between 12th Ave NE and 15th Ave NE

Between 12th Ave NE and 15th Ave NE, we plan to add a neighborhood greenway to connect the new NSF project and the protected bike lane on NE 70th to the future protected bike lanes that are being added as part of the 15th Ave NE paving project. Greenway elements include adding speed humps and signage.

Design

Revised design

Design street view

  • Bike lanes are being added on NE 70th St between 8th Ave NE and 12th Ave NE
  • A protected bike lane (eastbound) will be installed on the south side of the street, and a bike lane (westbound) added to the north side of the street
  • Between 8th Ave NE and Roosevelt Way NE parking will be consolidated to the south side of the street
  • Between Roosevelt Way NE and 12th Ave NE parking will be removed from both sides of the street

Schedule

2016

NSF applications and project selection

2017

Project design

2018

Project construction

2019

NSF applications and project selection (new cycle)

Project Funding

Funding comes from the 2015 voter-approved, 9-year Levy to Move Seattle, which will improve safety for all travelers, maintain streets and bridges, and invest in reliable, affordable travel options for a growing city. The levy includes $24 million to continue the Neighborhood Street Fund program over the 9 years.

Get Involved

We're committed to keeping you informed throughout the life of the project. Email is the best way to stay up to date on the project.

Sign up to receive email updates

Past outreach events
DateAudience
September 26, 2017 Roosevelt Neighborhood Association Briefing
September 13, 2017 Green Lake Community Council Presentation
May 18, 2017 NE 65th Vision Zero Project Neighborhood Transportation Forum
March 28, 2017 Public Meeting
February 28, 2017 NE 65th Vision Zero Project Neighborhood Transportation Forum

Materials

Construction Notice (October 2018)
Fact Sheet
(September 2017)
Fact Sheet (May 2017)
Fact Sheet (February 2017)
SDOT Project Review Document

To request information in another format:

We are designing and building a transportation project proposed by your neighbors to make it safer for people walking and biking and to strengthen community. To learn more about the project or request translations call 206-775-8720

Estamos disenando y construyendo un proyecto de transporte propuesto por nuestros vecinos a fin de que sea mas seguro para que las personas caminen y monten bicicleta y asimismo fortalecer a la comunidad. Para obtener mayor informacion acerca del proyecto o para solicitar transporte llamar a: 206-775-8720

Chúng tôi đang thiết kế và xây dựng một dự án giao thông đề xuất bởi chính những người hàng xóm của quý vị nhằm làm cho việc đi bộ và đi xe đạp trở nên an toàn hơn và cộng đồng vững mạnh hơn. Để tìm hiểu thêm về dự án hoặc yêu cầu các bản dịch, hãy gọi 206-775-8720

我們正在設計並建造一個由您的鄰居提議的交通計畫,這個計畫旨在改善人們的步行及?車安全,並強化社區。 如需進一步瞭解這項計畫,或是申請翻譯服務,請撥打 206-775-8720

我们正在设计并建造一个由您的邻居提议的交通计划,这个计划旨在改善人们的步行及?车安全,并强化社区。如需进一步了解这项计划,或是申请翻译服务,请拨打 206-775-8720

በእግራቸው ለሚጓዙ እና ብስክሌት ለሚጋልቡ ሰዎች ይበልጥ ለደኅንነታቸው አስተማማኝ እንዲሆን በእርስዎ ጎረቤቶች በቀረበ ንድፈ ሐሳብ ላይ በመመርኮዝ የትራንስፖርት አገልግሎት ፕሮጄክትን በመንደፍ እና በማዘጋጀት ላይ ነን። ስለ ፕሮጄክቱ የበለጠ ለማወቅ ወይም ትርጉም አገልግሎት ለማግኘት ጥያቄ ለማቅረብ ወደዚህ ይደውሉ 206-775-8720

በእግሮም ንዝጓዓዙን ብሽክልታ ንዝጥቀሙን ሰባት ውሑስንኦም ንምሕላውን እቲ ማሕበረሰብ ንምጥንኻርን ብጎረባብትኻ ዝተተለመ ናይ መጓዓዝያ ፕሮጀክት ዲዛይን ነውጽን ንሃንጽን ኣሎና፡፡ ብዛዕባ እቲ ፕሮጀክት ዝበለጸ ሓበሬታ ንምርካብ ወይ ናይ ናብ መጓዝያ ንምድዋል ሓገዝ ንምርካብ 206-775-8720

Nuti Pirojektii geejjibaa ollaawwan keessaniin gaafataman kan wixineessinuu fi ijaarruuf, namoota deemaniifi isaan bishikilitii ofaniif daandii nagaa taasisuufi hawaasichas cimsuudhaaf. Waa’ee pirojektichaa caalaa baruuf ykn geejjiba gaafachuuf nuuf bilbilaa 206-775-8720

Waxaynu nakhshadaynaynaa oona dhisaynaa mashruuc gaadiid ay soo jeediyeen dadka deriskaaga ah si aynu ugaga dhigno mid ammaan ah dadka soconaya iyo kuwa baaskiilada wata iyo si aynu u xoojino jaaliyada. Si aad u oggaatid inbaddan oo ku saabsan mashruuca ama u codsatid waxyaabo turjuban soo wac 206-775-8720

Kami ay nagdidisenyo at nagtatayo ng isang proyekto para sa transportasyon na namungkahi ng inyong mga kapitbahay para gawing mas ligtas para sa mga taong naglalakad at nagbibisikleta at para mapatatag ang komunidad. Upang higit pang matutunan ang tungkol sa proyekto o humiling ng mga pagsasalin-wika, tumawag sa 206-775-8720