Link to Transportation Home Page Link to Transportation Home Page Link to Transportation About Us Page Link to Transportation Contact Us Page
Delivering a first-rate transportation system for Seattle Scott Kubly, Director

Services 

Projects 

Planning 

Resources 

Events

News

Site Index


Street Maintenance Program
Pavement Management
Current Paving Projects
Recent Paving Projects
Bridge Projects
Bridge Painting Projects
Bridge Rehabilitation, Replacement and Seismic Retrofit
Pothole Rangers
Street Maintenance Request Form

25th Avenue NE Paving Project

Updated: March 20, 2017

Project update: Construction now scheduled for early 2018

We are now planning to begin paving activities on 25th Ave NE in early 2018. Starting work in early 2018 will allow contractors to take advantage of better weather and limit the impact and inconvenience of the construction. Construction was initially planned to begin in the fall of 2017.

This summer we will begin our pre-construction outreach to the businesses and residents in the area. If you'd like an update before then, do not hesitate to contact us via email or phone (see below).

Thank you!

Questions about the project?

Email the project team at 25thAvePaving@seattle.gov or call at (206) 733-9050.

Background

The Seattle Department of Transportation (SDOT) plans to resurface about 4.4 miles of 25th Avenue NE between Montlake Boulevard NE and NE 65th St. As part of the resurfacing, crews will grind off the old road surface, place new asphalt and repaint the lane striping.

The project will also:

  • Install or upgrade curb ramps to be compliant with the American Disability Act (ADA)
  • Relocate pedestrian push buttons to accommodate ADA curb ramps
  • Install a new pedestrian push button crossing at NE 47th St adjacent to the University Village entrance.
  • Replace traffic detection loops that control the signals
crosswalk Street

This project is currently in design. As we get closer to finalizing the design, we will begin engaging businesses and residents about the project.

Each year, SDOT resurfaces a number of the City's arterials, determining which streets should be repaved on the basis of traffic volumes and the current condition of the road.

Called a "mill and overlay" project, the contractor will grind off the top two inches of existing road surface, make any needed repairs to the road base below, and then repave with new asphalt. This work is expected to extend the life of the street for another 10-12 years, and will provide a smoother driving experience.

This maintenance work does not preclude us from returning later to make additional improvements to 25th Ave NE.

For more information about SDOT's paving program, please visit: http://www.seattle.gov/transportation/paving.htm

 

Project Budget & Funding

Total project budget: $3.6 million

Funding Sources:

  • Move Seattle Levy
  • Federal Highway Administration grant

Project schedule*

Initial design

2016

Updated design

Summer 2017

Community outreach begins

Final design

Fall 2017

Advertise for construction

Late 2017

Construction begins

Early 2018

*This schedule if a rough estimation of the project timeline. The schedule is subject to change.

Project Map

Map

Questions or Comments?

Adonis Ducksworth
Project Communications Lead
(206) 684-4193
adonis.ducksworth@seattle.gov

Jack Bartman, PE
Project Manager, SDOT
(206) 684-8084
jack.bartman@seattle.gov