Filter Results

976 to 1000 of 3631
desrptdouglasstruthlibrary
characteristics of an architectural style, period, or of a method of construction; and E. It is an outstanding work of a ...
0.00217863615 |
a/75974
desrptdaniel bagley elementary school(0)
of the cultural, political, or economic heritage of the community, City, state or nation. D. It embodies the distinctive visible ...
0.00217863615 |
a/75963
desrptseattleyachtclub
of an architectural style, period, or of a method of construction F. Because of its prominence of spatial location, ...
0.00217863615 |
a/76250
seattle-yacht-club-designation
characteristics of an architectural style, period, or of a method of construction F. Because of its prominence of spatial ...
0.00217863615 |
a/76537
psbminutes4-19-17
the condition until the panel is pulled up and the asphalt removed. He said structural reinforcement may be needed as well. He said their ...
0.00217863615 |
a/73809
seattledesigncommission-2004.08.05mercercorridorminutes
-range view of these facilities as urban services, and also as urban architecture; ƒ Appreciates and recommends approval of ...
0.002178631 |
a/85342
lpbminutes8-21-19
planning business. Architectural Review Committee requested additional information. She said the ...
0.00217853137 |
a/75051
id1.12.16
below. There was discussion about the proposed placement of the blade signs as shown on the sign plan. Ms. Rogers said ...
0.00217853137 |
a/72917
constpermitstandardssmallmf
to intake. The limited time of intake is not intended for applicants to complete their application materials. O/S Screener: Responsible for ...
0.00217825361 |
a/97927
seattledesigncommission-2007.03.15firestation28minutes
Rodriguez, Fleets and Facilities Department Ruri Yampolski, Office of Arts and Cultural Affairs Attendees: Jess Harris, ...
0.00217825361 |
a/85394
jefferson-youth-clubhouse-rfp
– Jefferson Park Master Plan Site Map ..................................................................... # 3 – ...
0.00217825361 |
a/91770
square_feet_2013_wrap_up
by the day’s attendees. Over 150 people, representing arts organizations, independent artists, funders, developers, property owners, ...
0.00217825361 |
a/49650
library
in their library facilities. In 2007, the Library commissioned a building condition assessment and development of an asset management ...
0.00217825244 |
a/61512
gl_new_structures
gl_new_structures MAKERS architecture and urban design Page 1 P Sq GL GL Section 2 new construction Draft 2 accepted ...
0.00217825244 |
a/74147
healthandhumanservicestab
Plan for Housing and Community Development, which is coordinated by the Human Services Department (HSD). As required by ...
0.00217825244 |
a/60486
cen
architecture planned for 2023; • Continuous improvement of the visitor parking experience, building on ...
0.00217825244 |
a/63558
sclcip
, but typically includes developing a building design inclusive of architectural, structural, electrical, plumbing, and ...
0.00217825244 |
a/147696
scl_2429adoptedcip
inclusive of architectural, structural, electrical, plumbing, and mechanical systems. The project shall also support the ...
0.00217825244 |
a/153302
library
ProjectsBLOPT2,7957622,92387885854942009,185Project Planning and ManagementBC31901000041053590468Queen Anne Library ...
0.00217823638 |
a/60369
desrptnavalreservearmory
. Seattle: Charles Press, 1999. BOLA Architecture + Planning: "Brace Lumber Warehouse." City of ...
0.00217801845 |
a/76181
naval-reserve-armory-designation
War. Seattle: Charles Press, 1999. BOLA Architecture + Planning: "Brace Lumber Warehouse." City of ...
0.00217801845 |
a/76480
seattledesigncommission-2008.11.20neighborhoodandstationareaplann ...
November 20, 2008 Convened 8:30 am Adjourned 4:30 pm Projects Reviewed Neighborhood Planning and Station Area ...
0.00217800587 |
a/85459
fas_2328cip
to, the following services: predesign, programming, master planning, conceptual planning, ...
0.00217800587 |
a/138624
2022-commercialwastestreamcompositionstudy
................................................................................................ 34 Study Design and Sampling ...
0.00217800587 |
a/144615
psb5-4-16_minutes
to change the basement space from retail to office. He said the grey area on the ground floor building plan is already ...
0.00217798166 |
a/73773