Filter Results

4851 to 4875 of 5610
lpb-minutes-01-07-15
row building. He said double significance doesn’t mean it has to be the only or in the top three. He said that with ...
0.002158773 |
a/74367
lpb-01-07-15-minutes
row building. He said double significance doesn’t mean it has to be the only or in the top three. He said that with ...
0.002158773 |
a/74604
lsaig-overview_eng
for the final design. THE DESIGN CONCEPT: Working with the Friends of Little Saigon Park, the community, and the Seattle Parks Department, ...
0.002158773 |
a/73346
mhc3721_apr14
operator: Owners onsite regularly for day to day operations • Business hours: Open seven days per week 9 am – approximately 12 am Exhibits ...
0.002158773 |
a/73683
admiralexecsummary
areas.admiralNeighborhood Plan BoundaryUrban Village What did we hear?• Love the parks, shopping, restaurants and ...
0.002158773 |
a/107973
03-12-2018_ag1_summarynotes_final
Attendees Arlene Chavez, El Centro de la Raza Linda Li, DON Community Liaison Robert Getch, Beacon Hill Safe Streets Katy Saunders, Makers ...
0.002158773 |
a/106524
mcgraw_faq_jan2024
of the bridge Will the seismic improvements change the operation of the bridge or its architectural features? We are not ...
0.002158773 |
a/151264
psb20321wel_staffreport
the project at the time. The installation of the artwork will be prior to other renovations of the public space but ...
0.002158773 |
a/74208
lpb8-18-21
. Doherty provided context of the site and identified the landmark structure and the original platting plan. She said at ...
0.002158773 |
a/74690
psb100423culturalwayfindingsr
project in 2018. Planned for but not finalized in the project were wayfinding and cultural and interpretive information ...
0.002158773 |
a/147957
seattledesigncommission-2010.11.04swaleonyaleminutes
seattledesigncommission-2010.11.04swaleonyaleminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura Director, DPD ...
0.002158773 |
a/85589
pspbminutes_5-4-22
to make a decision or if the application should be tabled. She said the plans indicate the sign would be anchored into ...
0.002158773 |
a/133706
pspbminutes_8-7-24
on Occidental would be in line with architectural features. Panels will be permanent and will be attached via anchors into ...
0.002158773 |
a/163993
lpb011525minutes
analysis was done by SMR, the architecture firm responsible for the prior rehabilitation. Board deliberation: BM Barnes ...
0.002158773 |
a/166522
seattledesigncommission-2014.01.23sr520westapproachbridgenorthmin ...
seattledesigncommission-2014.01.23sr520westapproachbridgenorthminutes APPROVED MINUTES OF THE MEETING Ed Murray Mayor Diane Sugimura ...
0.002158773 |
a/85752
psb073025800occsr
a building infill within the District that needs to be compatible with the District. Considerations in the Guidelines for new construction ...
0.002158773 |
a/171394
approved mm april 17 2025
Office of Planning and Community Development 600 4th Avenue, Floor 5 PO Box 94788 Seattle, WA 98124-4019 TEL 206-615-1349 ...
0.002158773 |
a/169743
fillingcommissonvacancies_1.25.24
vacancies32/8/2024Leaving and recently leftAffordable housing advocacyArchitecture –academiaConstruction ...
0.002158773 |
a/152605
kss_2020studioresidency_guidesfacility (002)
Street Station location is especially suited to the applicant’s growth and development: dedicated space, mission, location, public ...
0.002158773 |
a/49289
seattledesigncommission-2016.09.01judkinsparkstationminutes
HaddadDesign CommissionRachel GleesonDesign CommissionJescelle MajorDesign CommissionJake McKinstryPlanning CommissionMarj PressPlanning ...
0.002158773 |
a/84894
seattledesigncommission-2016.08.04colmandockminutes
, Vice ChairBrodie BainLee CopelandBen de RubertisThaddeus EggingRachel GleesonLaura HaddadTheo LimJohn SavoOffice of ...
0.002158773 |
a/84826
q3 surveillance technology determination report_2023final
for the Cedar River and South Fork Tolt watersheds. It is used for water resources planning and management. Department SPU ...
0.002158773 |
a/149035
debtsvc
projects and other details of the financing plan. Bond proceeds will be deposited into the 2016 Multipurpose Bond Fund. ...
0.002158773 |
a/62566
2012sbcindex
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113ARCHITECT (see definition for REGISTEREDDESIGN ...
0.002158773 |
a/97376
seattledesigncommission-2021.01.07st3designguidelines_presentatio ...
: Evaluation Tools Sub-Committee Meeting3)Draft Design Goals4)Draft Outline of Design Guideline Sections5)Next StepsPRESENTATION ...
0.002158773 |
a/85989