Filter Results

2276 to 2300 of 2582
parks
creosote treated wooden piles. An additional benefit is that SPR and the Office of the Waterfront and Civic Projects are working with ...
0.002189833 |
a/63564
q2-2023-quarterlyreport
to permit over-sized vehicle access and signage is added to provide contact information for warehouse vendors. Hygiene is ...
0.002189833 |
a/158748
q2-2023-quarterlyreport
to permit over-sized vehicle access and signage is added to provide contact information for warehouse vendors. Hygiene is ...
0.002189833 |
a/146922
public-webinar-5.22.25
-alt, or seismic upgrade, infeasible for low-income multifamily or structural/electric upgrades & more.Exemptions: Electric only buildings ...
0.002189833 |
a/169226
2019_4_22-structureforstability
, photographerSTRUCTURE FOR STABILITY8IntroductionIn Seattle, commercially-zoned blocks with a cultural space on them are twice as likely to ...
0.002189833 |
a/49632
haggett hall demolitiona and replacment_cucac_2024.03.12
ScheduleProject Definition Apr 2023 – Jul 2023Design and Permitting Aug 2023 – Nov 2025Abatement Start Nov 2023 ...
0.002189833 |
a/153736
route40_presentation_fremont_neighborhood_council_final
, and vibration during street demolition and excavation▪Properties with planned water service interruptions will be ...
0.002189833 |
a/151926
children's sac 052416 presentation
demolition of structures containing residential uses which are not Major Institution uses shall be prohibited if the ...
0.002189833 |
a/77085
presentation043018
departure which may be allowed for each development standard from which a departure has been requested. Minority reports shall be ...
0.002189833 |
a/77934
treeprotectionconstructiondevelopmentsites
of decay.To protect trees and tree roots within the fenced CRZ, do not do the following:• Stockpile construction materials or ...
0.002189833 |
a/96646
lpbcurrentnom_bucca_de_beppo _ ducati
uses, with no new residential buildings permitted. In the post World War II era automobile related facilities began to ...
0.002189833 |
a/74437
upcoming_opportunitiesv.18
alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, ...
0.002189833 |
a/99786
seattlerecreationdemandstudy2016
shoreline access Access to the water’s edge that includes at least 40 linear feet of shoreline and is either publicly owned or dedicated by ...
0.002189833 |
a/92570
upcoming_opportunitiesv.13
alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, ...
0.002189833 |
a/99781
upcoming_opportunitiesv.17
alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, ...
0.002189833 |
a/99785
upcoming_opps_2019_3.5(0)
functional needs, right-of-way needs, types of environmental permitting required, and ways to minimize impact to the ...
0.002189833 |
a/99805
upcoming_opportunitiesv.15
functional needs, right-of-way needs, types of environmental permitting required, and ways to minimize impact to the ...
0.002189833 |
a/99783
upcoming_opportunitiesv.16
replacement alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional ...
0.002189833 |
a/99784
upcoming_opportunitiesv.11
identify the: essential functional needs, right-of-way needs, types of environmental permitting required, and ways to ...
0.002189833 |
a/99779
upcoming_opportunitiesv.12
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.002189833 |
a/99780
upcoming_opportunitiesv.20
the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, types of environmental ...
0.002189833 |
a/99788
upcoming_opps_2019_3.5
, types of environmental permitting required, and ways to minimize impact to the navigable channel and 15th Ave W corridor ...
0.002189833 |
a/99806
upcoming_opportunitiesv.14
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.002189833 |
a/99782
upcoming_opportunitiesv.19
identify the: essential functional needs, right-of-way needs, types of environmental permitting required, and ways to ...
0.002189833 |
a/99787
upcoming_opportunitiesv.21
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.002189833 |
a/99789