Filter Results

201 to 225 of 1652
adrule27.01.24_v1_marine_terminals_for_fcab_13124
facilities. ON DOCK RAIL (ODR) is a railroad facility located on or within a marine terminal. VESSEL is a ship, barge or other floating ...
0.00218220474 |
a/151957
adrule27.01.14
of materials. SECTION 2 -- PERMITS 2.1 General. An annual Marine Terminal permit (Code 8025) must be ...
0.00218220474 |
a/64113
adrule27.01.24
on or within a marine terminal. VESSEL is a ship, barge or other floating vessel utilized in the transportation of materials. Section 2. ...
0.00218220474 |
a/153899
4-neighborhoodsanddevelopment
opportunities, leveraging competitive advantages, connecting to other resources in the region, and identifying issues and trends ...
0.002181963 |
a/61959
prelimdecision20180904
: Amend the paragraph under “Demolition”: Demolition is permitted prior to future ...
0.00218170416 |
a/77837
thorntoncreekdeparturerecommendationsfinal
and criteria set forth in Chapter 8 23.79 only when departure would contribute to reduced demolition of residential ...
0.002181682 |
a/77680
vm_2019_annual_report
shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. Prior to the approval of a ...
0.0021815924 |
a/77926
vm2019annreport
to minimize the potential shadow impacts to these campus resources and offsite uses. No action in reporting period Historic Resources 52. ...
0.0021815924 |
a/77921
vm 2018 annual report
of a demolition permit for a building that was constructed 50 years ago or earlier, an historical analysis ...
0.0021815924 |
a/77913
adrule27.01.22_v1_marine_terminals_proposed_for_12122023_12-29
) is a railroad facility located on or within a marine terminal. VESSEL is a ship, barge or other floating vessel utilized in the ...
0.00218111277 |
a/151368
seattle-solid-waste-2011-os
or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ...
0.00218109647 |
a/107405
ch mimp_2023 annual report_final resubmission
Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of ...
0.00218101917 |
a/163966
correctedfindingsandrecommendations
the paragraph under “Demolition”: Demolition is permitted prior to future development as ...
0.00218094164 |
a/77696
cherry hill mimp_2023 annual report_final
” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of Building ...
0.00218034838 |
a/163233
2021sebcchapter15
upon completion of demolition, and all holes shall be filled or protected with secure fences. Holes are ...
0.00218032231 |
a/162617
ch3_design_construction
...............................................................................................................................3-25 Fish ...
0.00217999262 |
a/113785
pspbminutes8-21-19
of demolition. 23.66.120 - Permitted uses A. All uses are permitted outright except ...
0.00217989832 |
a/74087
ch_mimp_2022 annual report_final
. in their “18th Ave Building Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP ...
0.00217966456 |
a/139530
cb-118736-cs-memo-8.2.2016
, demolition, grading, and other construction permits (supplemental procedures for environmental review ...
0.00217961 |
a/53222
opcd-seattle 2035 comp plan update ord
for such demolition shall be in 3 effect, but any permit decision or permit for any ...
0.002179421 |
a/87433
2022solidwaste-chapter3-solidwastedatatrends
as commercial recyclers, as described above, to obtain a Recycler License. All Seattle Department of Construction and Inspection ...
0.002178967 |
a/146063
2022solidwastedraftch3
recyclers, as described above, to obtain a Recycler License. All Seattle Department of Construction and Inspection permit ...
0.002178967 |
a/126528
annual report 2018 -- 5-2-19 - final
in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to First Issuance of Building Permits. The ...
0.00217887457 |
a/77363
5waterinfrastructurefinalredacted
on demolition permit requirements, see DSG Chapter 2, Design for Permitting and ...
0.00217887457 |
a/154278
annualreport2018
expressed interest in the Lynn Building along E Madison Street. When the university moves forward with a Master Use Permit ...
0.00217857375 |
a/77250