You just searched for:
Search
Filter Results
176 to 200 of 1732
question #58 - wqidde illicit discharge data
https://www.seattle.gov/documents/departments/spu/documents/plans/stormwate ...
: home demolition has damaged a heating oil tank and spilled hho to the ground. requested cleanup by the contractor. no ...
0.002189617 |
a/155466
final seattle university mimp report fy24 2024.09.23
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
interest in the Lynn Building along E Madison Street. When the university moves forward with a Master Use Permit (MUP) ...
0.00218950142 |
a/162914
2018sfcchapter9
https://www.seattle.gov/documents/departments/sdci/codes/seattlefirecode/20 ...
. The fire code official shall have the authority to require construction documents and calcu-lations for all fire protection and life ...
0.00218920037 |
a/97756
lpb3-2-16_minutes
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
with the bracing plan with the applicant and they need to make sure as they work on the demolition permit ...
0.00218916452 |
a/74658
annualreport2019
https://www.seattle.gov/documents/departments/neighborhoods/majorinstitutio ...
– June 30, 2019) SUMMARY OF UPDATES I. INTRODUCTION The design and Master Use Permit were approved for the Center for ...
0.00218894542 |
a/77251
urmfinalrecommendations
https://www.seattle.gov/documents/departments/sdci/codes/changestocodes/unr ...
to be abated or braced. This requirement is enforced when SDCI receives an application for a building permit for any work ...
0.002188811 |
a/96918
tiny-house-village-bill_for-introduction-
https://www.seattle.gov/documents/departments/council/issues/tinyhousevilla ...
of Significance (determination that an Environmental Impact 2 Statement is required) for Master Use Permits and for ...
0.00218861713 |
a/53909
mandatory-housing-affordability-for-residential-development-ordin ...
https://www.seattle.gov/documents/departments/council/committees/mandatory- ...
arcades; 6 e. Voluntary building setbacks; 7 6. Determinations of Significance (determination that an environmental impact 8 statement is ...
0.00218835636 |
a/53229
opcd-oh-sdci mandatory housing affordability for residential ...
https://www.seattle.gov/documents/departments/hala/opcd-oh-sdci mandatory ...
, demolition, grading, and other 9 construction permits (supplemental procedures for environmental review ...
0.00218835636 |
a/64768
2018sbcchapter9
https://www.seattle.gov/documents/departments/sdci/codes/seattlebuildingcod ...
be permitted to be installed for partialor complete protection provided that such system meets the requirements of this ...
0.00218771817 |
a/97455
seattle-ltgo-2019a-b-taxable-os
https://www.seattle.gov/documents/departments/investorrelations/2019 ...
of any amount in respect of principal of or interest on the Bonds, or any notice which is permitted or required to be given ...
0.00218771817 |
a/58539
2012srcappendixe
https://www.seattle.gov/documents/departments/sdci/codes/seattleresidential ...
, additions or repairs to existing manufac-tured homes. The construction, alteration, moving,demolition, repair and use of ...
0.00218726275 |
a/97773
sw_plan_016224
https://www.seattle.gov/documents/departments/spu/documents/plans/solidwast ...
construction, demolition or alternation permit. However, most roofing and many small remodeling projects ...
0.00218700687 |
a/113506
northlotdirectorsreport
https://www.seattle.gov/documents/departments/opcd/vault/southdowntown/nort ...
) is proposing to amend the City’s Land Use Code (SMC, Title 23) to allow increases in permitted height under specified ...
0.00218681712 |
a/88162
pspbminutes2-7-18
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
that new construction will be completed within two (2) years of demolition. SMC 23.66.120- Permitted ...
0.00218672631 |
a/74063
gl_intro
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
: Certificates of Approval for Use, Design and Demolition from the Board are required before a permit ...
0.00218672631 |
a/74146
2018sbcchapter33
https://www.seattle.gov/documents/departments/sdci/codes/seattlebuildingcod ...
shall be left level and free of debris upon completion of demolition, and all holesshall be filled or protected with secure ...
0.00218659965 |
a/97447
sdci design review exemption ord
https://www.seattle.gov/documents/departments/sdci/codes/changestocodes/des ...
(determination that an Environmental Impact 3 Statement is required) for Master Use Permits and for building, ...
0.00218587229 |
a/161023
2024designreviewexemptionsordinance
https://www.seattle.gov/documents/departments/sdci/codes/changestocodes/des ...
(determination that an Environmental Impact 3 Statement is required) for Master Use Permits and for building, ...
0.00218587229 |
a/155316
2012srcchapter4
https://www.seattle.gov/documents/departments/sdci/codes/seattleresidential ...
the provisions of Section R322. Wood foundations shallbe designed and installed in accordance with AF&PA PWF.Exception: The provisions of ...
0.00218587229 |
a/97807
reportonmayorsrecommendations
https://www.seattle.gov/documents/departments/opcd/vault/multifamily/report ...
........................................................................................................................21 ...
0.00218583061 |
a/88029
2021secchapter5
https://www.seattle.gov/documents/departments/sdci/codes/seattleenergycode/ ...
. Unaltered portions of existing buildings used for residential purposes that received a certificate of occupancy at least ...
0.00218583061 |
a/162722
draft battery language 03_ifc_2021
https://www.seattle.gov/documents/departments/fire/business/fire code and ...
and maintenance of all structures and premises for precautions against fire and the spread of fire and general requirements of fire safety. ...
0.002185465 |
a/154144
lowrisecodeupdatedirectorsreport
https://www.seattle.gov/documents/departments/opcd/vault/multifamily/lowris ...
.......................................................................................................................13 5. ...
0.00218532956 |
a/87994
psbminutes8-16-17
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
that new construction will be completed within two (2) years of demolition. SMC23.66.120 Permitted uses ...
0.00218506739 |
a/73817