Filter Results

1701 to 1725 of 11044
2009endofyearaccompilishments123109
: Run Date: Division Project # Project Name Accomplishment Unit of Measure Work Plan Target Q1 Total Q2 Total Q3 Total Q4 Total ...
0.00304496964 |
a/99362
appendix
/Dexter AVE NTC323250Neighborhood Traffic Control ProgramThis program will install traffic calming devices ...
0.00304496964 |
a/62699
spd 911 logging recorder sir draft - for public comment ...
traffic between dispatchers and patrol officers. 1.2 Explain the reason the project/technology is being created or ...
0.00304496964 |
a/117216
final_crowd_psychology_report_v1
significant distances, are not impacted by traffic stoppages and officers can use their bikes as mobile barricades when in ...
0.00304496964 |
a/128342
appendix
of Transportation Traffic Marking Lead Wkr FullTime 1 Seattle Department of Transportation Transp Plnr,Assoc FullTime ...
0.00304496964 |
a/61812
fremontgreenway_upgrade_mailer
and biking the priority on residential streets.Greenways can include:• 20 mph speed limit signs• speed humps to calm ...
0.00304496964 |
a/102070
23rdavee_displayboards
at key intersections• Reduce speeding• Consider adding traffic signals at E Lynn St and near Interlaken Pl E• Support ...
0.00304496964 |
a/106688
sepa checklist south thornton nds_07252022
. Utility gas main relocation and water main replacement g. Some regrading, removal of existing pavement, pavement restoration, and ...
0.00304496964 |
a/131820
northbeaconsepachecklist
), building code, and other public health and safety requirements. b. Noise 1) What types of noise exist in the area which may affect ...
0.00304496964 |
a/88059
appendix_cip
and reprogram the system. Traffic on the network is easily rerouted until major failures can be repaired. The new ...
0.00304496964 |
a/147698
appendix
StratAdvsr1,General Govt FullTime (1)Seattle Department of Transportation StratAdvsr2,General Govt FullTime (1)Seattle Department of Transpo ...
0.00304496964 |
a/61744
madbrtnovemberoutreachreportfinal
concerned that operating BRT in mixed traffic or in Business Access & Transit (BAT) lanes would reduce the speed and ...
0.00304496964 |
a/106153
mercer ms don recommendations final v2
parking, as recommended by the City of Seattle School Traffic Safety Committee. Parking quantity requirements are based on ...
0.00304496964 |
a/136501
olympichillsdeparturerecommendationsfeb2015
to reduce the appearance of bulk; (4) Impacts on traffic, noise, circulation and parking in the area; and (5) Impacts on ...
0.00304496964 |
a/76920
sdot director's rule 3-2011
**************************************************************************************************** 1.0 References 1.1 Seattle Municipal ...
0.00304496964 |
a/99206
seattle2035_landuse
facilities and small institutions in residential areas if such concentrations would create or further aggravate parking shortages, ...
0.00304496964 |
a/87446
melrosepromenade_openhousesummary_april2018
and timeline • Pike Pine Renaissance table • Berger Partnership board set • SDOT Melrose Promenade project boards o Project background board ...
0.00304496964 |
a/100126
ndmap oct 23 project kickoff meeting summary memo
that prioritizes pedestrians and bikes over vehicle traffic. ▪ Retrofit the Battery Street tunnel into an active public ...
0.00304496964 |
a/56189
introduction_2012adoptedbudget
million. The original proposed budget included uses for this one-time revenue, including street surface repair, winter storm readiness, ...
0.00304496964 |
a/61942
introduction_2012adoptedbudget_000
, neighborhood traffic control, and freight spot improvements. Council made several changes to the planned uses of these ...
0.00304496964 |
a/61943
introduction_2012adoptedbudget_001
of Washington for $19.8 million. The original proposed budget included uses for this one-time revenue, including street surface repair, ...
0.00304496964 |
a/61944
introduction_2012adoptedbudget_003
of Washington for $19.8 million. The original proposed budget included uses for this one-time revenue, including street surface repair, ...
0.00304496964 |
a/61946
introduction_2012adoptedbudget_002
of Washington for $19.8 million. The original proposed budget included uses for this one-time revenue, including street surface repair, ...
0.00304496964 |
a/61945
newmobility_playbookfinal
for the city of Seattle.SDOT is focused on creating a safe, interconnected, vibrant, affordable, and innovative city for all. We value:A ...
0.00304496964 |
a/103071
12-09-10
. In addition, a contractor will be required to return any areas used but not retained by WSDOT to their pre-construction state exclusive of ...
0.00304496964 |
a/92093