Filter Results

1476 to 1500 of 1652
mhc022625sr
1st Ave, Sanitary Building. Additional relevant information: • Zone 1, street level, Food (a-b) and Retail (b) uses ...
0.002142034 |
a/165678
isrd112823_1001jackson_staffnotes
SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 – Demolition SMC 23.66.320 – ...
0.002142034 |
a/149981
seattle questions aeg response finance and legal (partial)
include permitting and other fees that aren’t included in Exhibit 1. SEATTLE PARTNERS RESPONSE: ATTACHMENT 1 – Questions to ...
0.002142034 |
a/56279
desrptseattlenatbankunitedway
. Thus, for unknown reasons it appears that Carl Gould and his firm had relatively limited involvement with the final design of the ...
0.002142034 |
a/76247
seattle-national-bank-building-designation
to Bebb & Gould. Thus, for unknown reasons it appears that Carl Gould and his firm had relatively limited involvement with the final design ...
0.002142034 |
a/76534
mpac meeting minutes march 2019 final draft
are not evident or obvious in the park anywhere. Bob Dempster has built a replica of the plane that actually flew around the world and he ...
0.002142034 |
a/92313
31710swacminutes
prevention not big tonnage part of project  Construction and demolition targets for cuts  Are just now moving into C&D ...
0.002142034 |
a/110716
notes-082615
), reviews amendment requests to the plan, and provides comments on any project developed under the provisions of the adopted plan that ...
0.002142034 |
a/77626
lpb060122_villa_camini_draft_far_covenant
-exempt use of floor area on the Landmark Property, or permit any non-exempt use of floor area on the Landmark Property to ...
0.002142034 |
a/128599
42110swacminutesappvd
contributes to 60% recycle goal Waste prevention, product stewardship – harder to track benefits – cut expenditures – about half of typical ...
0.002142034 |
a/110745
notes20160817
consideration, VM elected to pay the City, $4.2 million in mitigation for the future proposed demolition of the Chasselton ...
0.002142034 |
a/77902
adaptivestrategiesduringacatastrophe[1]
RESOURCE DEPLOYMENT H. Obstacles to delivery of basic goods in the short-term occur, but is it fair to assume the following: A degree of ...
0.002142034 |
a/57350
desrptunitedwaybldg
, for unknown reasons it appears that Carl Gould and his firm had relatively limited involvement with the final design of the building. ...
0.002142034 |
a/76287
lpb_certificateofapproval-12420
for the proposed demolition and replacement of the bandshell structure, and associated site alterations at Volunteer Park ...
0.002142034 |
a/93617
noismemo
, construction, demolition, or change of use permit for 4 a property when renters will be required to ...
0.002142034 |
a/50605
str-dns_2017
[ ] Exempt [X ] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions [ ] DNS involving non-exempt grading or ...
0.002142034 |
a/53883
desrptfranklin apartments
Street, 1949) was built in Belltown between 1929 and the 1970s. By the 1960s many of the 1920s buildings had deteriorated and were in danger ...
0.002142034 |
a/76046
lpb9-16-15-minutes
that one leaf contains website information - fallenleaf.org - that explains the project. She said they make sure they are up to code, have ...
0.002142034 |
a/74698
notes20190910
and they are looking at submitting the demolition and construction permit later in the year. The ...
0.002142034 |
a/77774
finalfeb14minutes
of ADUs that could be expected to be built, as well as the number of single-family house demolitions, over ten years. Mr. ...
0.002142034 |
a/108631
august13approvedmeetingminutes
previously submitted and rejected #7: Demolition and Displacement • Not recommended for docketing citing criterion D; ...
0.002142034 |
a/108437
burgess-2016-01-accomplishments-tracking-log
Globe as a historic landmarkHistoric Preservation Board designated the Globe as a landmark in April, 2012November-09Voted to expand ...
0.002142034 |
a/54028
dns-analysis_littlesaigon
Street at the north and South King Street at the south. Work includes approximately 420 cu.yds of excavation and 550 cu.yds. of backfill as ...
0.002142034 |
a/128288
phase1startconstructionmadison
will work Monday through Friday, generally 7 AM until 5 PM.• Noise and dust will accompany sawcutting and demolition ...
0.002142034 |
a/103749
60_yesler_artwork
:____________________________________ • Approval Requested for: [ ] Change of Use [ ] Sign(s) [ ] Street Use Permit ...
0.002142034 |
a/74113