Filter Results

8876 to 8900 of 11044
19-9
forestry, signs & markings, traffic control, layout or construction staking as necessary) $ Drainage Costs $ Estimating ...
0.003019525 |
a/78305
edc-meetingminutesdraft09-5-13 final
factors in upward mobility. While geography makes a difference, concentrated poverty, extensive traffic and a weak ...
0.003019525 |
a/56298
2017opa-1060ccs04-02-18
Policy 16.090-POL-5(b) requires that employees record police activity and sets forth various law enforcement actions that must be recorded. ...
0.003019525 |
a/82079
contextgeorgetown hri 2014 survey update - final report feb 2015
more industrial and warehouse-related businesses. One of the end results of the traffic impacts was the closure of the ...
0.003019525 |
a/74350
introduction
2012-051 Install a traffic circle and curb cuts at 72nd St NW and 1st Ave NW SDOT $ 20,000 Northwest 2012-054 ...
0.003019525 |
a/61980
2013.10.17 union st design commission minutes
structure. He stated that grade difference could mean extra capacity to ease transmission of traffic. Action The Design ...
0.003019525 |
a/86086
100511adoptedmeetingsummary
but this is not sustainable. JH – so the City will speak with one voice and say that’s it. No more. RF – ultimately the Mayor will decide. ...
0.003019525 |
a/118054
cdwacnotes20180418finalapprovedbycommittee
to traffic jam metaphor. 4. Combined Sewer Overflow(CSO) Program: Ballard Site Master Plan Ship Canal Water Quality ...
0.003019525 |
a/111028
cdwacnotes20180418finalapprovedbycommittee
to traffic jam metaphor. 4. Combined Sewer Overflow(CSO) Program: Ballard Site Master Plan Ship Canal Water Quality ...
0.003019525 |
a/114676
meetingnotes4192016
construction-related traffic, community preferences and financial constraints. SPU also takes into consideration its ...
0.003019525 |
a/115194
2022opa-0339ccs080823
“an authorized emergency vehicle” may operate outside standard traffic regulations. It states drivers of authorized ...
0.003019525 |
a/148744
2018opa-0458ccs102218
to dispatched calls starting before the employee arrives on the scene; traffic and Terry stops; on-view infractions and ...
0.003019525 |
a/82434
leary_30percent_factsheet
as part of this proposed design to move the curb line out.Safety improvements including new ADA-compliant curb ramps, additional curb ...
0.003019525 |
a/158964
7c. 18-703, 9th avenue and university pavement park
, signs & markings, traffic control, layout or construction staking as necessary) $ 27,300 Drainage Costs $ 0 Estimating ...
0.003019525 |
a/78151
spu_w_project_detail
spu_w_project_detail SPU - WaterStart Date:End Date:This project funds planning, preliminary engineering, and design costs associated with ...
0.003019525 |
a/60991
dkt 512 city's response on court's order to show cause 12-17-18
activities from start to finish: • Dispatched calls, starting before the employee arrives on the call to ensure adequate time to turn on ...
0.003019525 |
a/52883
2018opa-0691ccs01-28-19
the categories of activity that must be recorded, which include: responses to dispatched calls starting before the employee arrives on the ...
0.003019525 |
a/82541
columbia_2way_transit_factsheet
columbia_2way_transit_factsheet PROJECT INFORMATION & CONTACTDan Anderson, Communications & Outreach Leaddan.a.anderson@seattle.gov(206) ...
0.003019525 |
a/105898
permitdiscussionpresentation110310
Benefits •Stormwater mitigation •Air cleaning •Carbon sequestration •Habitat •Heat Island •Property value increase to aesthetics •Aesthetics ...
0.003019525 |
a/117924
2018opa-0035ccs07-02-18
. STATEMENT OF FACTS: On the date in question, Named Employee #1 (NE#1) conducted a traffic stop in the vicinity of a ...
0.003019525 |
a/82209
isrd8-24-21
, patrons, and businesses. He said he likes how this project will increase the population, foot traffic and activity in ...
0.003019525 |
a/73182
west-seattle-junction-summary-of-themes-final
-family areas within Urban Village o Questions about the need for additional housing when zoning capacity is currently available o Major ...
0.003019525 |
a/54192
notes-2015-01-14
safety committee, safety routes, traffic studies, etc. Mr. Sheppard mentioned that if the Committee feels that the list on ...
0.003019525 |
a/76919
060823 - se committee meeting minutes
060823 - se committee meeting minutes Special Events Committee Meeting Minutes June 8th, 2023 10:00 AM – 11:00 AM VIA WebEx Meeting Member ...
0.003019525 |
a/144985
5b. 18-580, 33rd ave ne between ne 125 street and ne 130 street
, signs & markings, traffic control, layout or construction staking as necessary) $ 25,000 Drainage Costs $ 10,000 ...
0.003019525 |
a/78114