Filter Results

1026 to 1050 of 1611
lupermitsubmittalrequirementscklist
lupermitsubmittalrequirementscklist Master Use Permits – Preparing Your Plans and ...
0.00155775517 |
a/97969
soed_jobsplan_2010booklet_final
is being developed that would allow 20 sites to obtain temporary permits for uses as such as food carts, ...
0.00155766716 |
a/56216
09-22-11
proceeds are being spent in 2011 to support critical surface street repair needs. The mayor's 2012 Proposed Budget recommends ...
0.00155763153 |
a/92110
wallingfordguidelines
, the building eleva-tion drawings will be in color to showbuilding materials in addition to façadetreatment and depth, architecturaldetails ...
0.00155761186 |
a/96376
othelloneighborhoodactionplan
and to community facilitiesPolicy 10.E.  Provide non‐motorized connections to open spacesStrategy 10.1:  Restore and create new bus connecti ...
0.00155748962 |
a/88098
transportation
and equipment) • Reimbursable services to other City departments or outside agencies (e.g., street use ...
0.00155747239 |
a/61533
desrptseattlelabortemple
. It is the last large functioning labor hall in Belltown, a neighborhood that was once the center of union activity. The building is also ...
0.00155743409 |
a/76245
seattle-labor-temple-designation
. It is the last large functioning labor hall in Belltown, a neighborhood that was once the center of union activity. The building is also ...
0.00155743409 |
a/76532
magnoliablvdvmp
appropriate, other methods of propagation such as planting larger (four to five foot) trees may be used. Madrona saplings ...
0.00155736879 |
a/92741
sclcap
generation andtransmission assets, buy and sell energy in shorter-term increments, and use pricing to match loadsand ...
0.00155734562 |
a/62890
2022 10 draft of the hers with new proposed edits - no edits ...
. These matters include, but are not limited to, various Council land use actions: Rezone Petition, SMC Chapter 23.34; ...
0.001557319 |
a/135627
09-12-02
with Alternative #2. This option compromises both creek and athletic uses but achieves the intent of the project. ...
0.00155720022 |
a/91923
09-26-02
with Alternative #2. This option compromises both creek and athletic uses but achieves the intent of the project. ...
0.00155720022 |
a/91924
dag_4_meeting_summary_final
enormous regional impacts. The Port looked at a complex Master Planning process that took 1.5 years, and this project has ...
0.00155719661 |
a/101083
seattledesigncommission-2007.10.04secondandpineskybridge
was recognized as a redesign opportunity after Macy’s acquired it. The 2nd and Pine project was issued a master ...
0.001557193 |
a/85408
seattledesigncommission-2008.02.07auroraavenimprovementsminutes
to the set of activities (tasks and deliverables) that will be accomplished in order to develop a Pedestrian Master Plan ...
0.00155715039 |
a/85417
notes20120112
to the east. The FEIS does not contain an analysis of the impacts associated with an event center. These impacts would have to be analyzed ...
0.00155708008 |
a/77264
desrpttreathouse
floors appear to remain. As the floor plans show, the names of many of the suites indicate their original use, such as the ...
0.0015569597 |
a/76281
treat-house-designation
and second floors appear to remain. As the floor plans show, the names of many of the suites indicate their original use, ...
0.0015569597 |
a/76566
draft plan introduction
that appear in the Land Use Code. The Transportation Element of this Plan provides direction for the Bicycle Master ...
0.00155692676 |
a/87414
cap by 2015 actions status report master(0)
cap by 2015 actions status report master(0) Page 1 of 28Action2013 Implementation Tasks 2014 ...
0.00155686261 |
a/88252
capdetailedstatusreportfeb2015
incremental energy use targets for each 3-year cycle through 2030.Education & user support for 2012 Energy Code. City ...
0.00155686261 |
a/88258
opendataplaybook_published_2016.08
public release) • GIS maps • ...
0.00155677169 |
a/107466
2014-04-03_wct_existingconditionsdesigncriteria_memo
Highway Administration. 2009.  The National Association of City Traffic Officials (NACTO) Urban Bikeway Design Guide.  Shoreline Mas ...
0.00155676343 |
a/100698
desrptlloydbldg
permitted, although more noxious industrial uses were prohibited. Given this new zoning, even though the ...
0.00155669043 |
a/76153