Filter Results

1376 to 1400 of 1652
lpb3-17-21
and families of their own. In his 1952 obituary, Aaron Cohen was described as a pioneer labor union official. There were many additions ...
0.00214489433 |
a/74656
lpb101624echughesrschoolagmt
. o. Demolition of non-historic building additions, provided associated alterations or changes to the Landmark are ...
0.00214489433 |
a/161387
130thcompplanfeisaddendum
as part of the City’s permitting and development review processes. As part of our cumulative impacts assessment, we ...
0.00214489433 |
a/87385
constpermitstandardssfaddalt
prior to intake. The limited time of intake is not intended for applicants to complete their application materials. ABBREVIATIONS ADU ...
0.00214489433 |
a/97925
res 32076
will prioritize efforts to create and expand affordable housing options including changing land use and permitting laws to ...
0.00214489433 |
a/137898
seattledesigncommission-2005.07.07broadviewlibraryexpansionminute ...
with City Light to acquire solar panels 07 July 2005 Project: Four Seasons Hotel Phase: Street Use Permit Exceptions ...
0.00214489433 |
a/85363
lpb101624lincolnschoolagmt
, or wheelstops in parking areas. m. Demolition of non-historic building additions, provided associated alterations or ...
0.00214489433 |
a/161394
city_light_detail
. The customer pays for this feeder. The project includes design, preparing permits and either building the project, or ...
0.00214489433 |
a/61491
ne_surveyresults
and fairly functional other than that it is too narrow with on-street parking south of 65th Stand needs a turn arrow at 75th St. 65th Street ...
0.00214489433 |
a/102620
administration
elevator controls study;•SMT 14 demolition and structural repairs;•Roof replacements at Airport Way Center (AWC) ...
0.00214489433 |
a/62335
light_projects
Substation. The customer pays for this feeder. The project includes design, preparing permits and either building the ...
0.00214489433 |
a/61450
economiceffectsofrezones
space and 201 parking spaces. Purchase price was $5.15 million in late 2006, or $22.29 per sq ft for the land; inclusion of $1.5 million of ...
0.00214489433 |
a/87981
2016-council-work-program
; (2) operations and maintenance plan for the Central Waterfront; (3) expansion of the Seattle Aquarium; (4) demolition of ...
0.00214489433 |
a/53341
seattledesigncommission-2002.08.15lakecityparkinggarageminutes
. For heat and ventilation, there is a chimney mounted above the elevator where the glazing permits the top of the elevator ...
0.00214489433 |
a/85299
249transportation
to the replacement of State Route 99 along the Seattle waterfront. The program includes the City's involvement in the viaduct ...
0.00214489433 |
a/61971
city_light
. The project includes design, preparing permits and either building the project, or putting it on hold until the ...
0.00214489433 |
a/61490
ex 1 city of seattle 2024 state legislative agenda
are unhoused or at risk of losing housing. We support efforts to create and expand affordable housing options, including social housing, and ...
0.00214489433 |
a/164669
seattle_city_light
for this feeder. The project includes design, preparing permits and either building the project, or putting it on hold ...
0.00214489433 |
a/61459
lpb111622westseattleagmt
that are operable and do not obscure the glazing when in the open position. 3 m. Installation, removal, or alteration of curbs, bollards, ...
0.00214489433 |
a/135952
2018sfcintro
also are specified for thecomponents that will permit their safe use without special knowledge or effort. The means ...
0.00214489433 |
a/97764
slis
, or building or demolition permit issuance. In addition, the Executive should review similar programs ...
0.00214489433 |
a/62615
uwannualreport2013
as of this reporting period. [ 8 ] TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus ...
0.00214489433 |
a/77872
uwannualreport2015
Capacity in Campus Area Permitted GSF Development % of Total Development Capacity constructed as of this report Central 32% ...
0.00214489433 |
a/77874
oca_crime_prevention_review_09-05-2012
description than time permitted in the CBO review, 2) a comparison of City program practices with the evidence-based ...
0.00214489433 |
a/127434
dpr_projects
for the City to remove. The City's demolition work and additional restoration work will be done under a separate project ...
0.00214489433 |
a/61690