Filter Results

8251 to 8275 of 11414
sbab_safehealthybridgesproposalsupport_2020-08-31
(such as Cheasty Blvd crossing MLK and overpasses across Aurora), have never had adequate space for the volume of active transportation ...
0.003019525 |
a/98997
libertybank_openhouse_summary
St? A: Residents or neighborhood councils can submit a request for a new RPZ. For more information on this process, please visit the RPZ web ...
0.003019525 |
a/100100
secmeetingminutes081221
, traffic control plan, streets closure • A huge drop off from a population of 105,000 to about 36,000 due to pandemic • ...
0.003019525 |
a/110208
bld1323_mar02_final
brought about by the pandemic and are a part of district history. He said community needs like traffic calming and small ...
0.003019525 |
a/154660
430pipeline_6615-12thavene_102822_final
will be restricted. • Slowed vehicle traffic and staging of equipment and construction vehicles near the project area will ...
0.003019525 |
a/135639
upcoming_opps_2021_2.8
West Seattle Mobility Action Plan [mode share goals are based on weekday, peak-hour (6-9 AM; 3-7 PM) traffic)]: 1,000 trips ...
0.003019525 |
a/99824
january 2022 sbab & spab minutes
public space, shifting priority to people walking and biking, and changing vehicle use (discourage pass through traffic, ...
0.003019525 |
a/100723
swac_notes_20191106
for the waste removal and landfill closure replacement components to support site prep for two I-5 southbound lanes of ...
0.003019525 |
a/112408
cam2304
cam2304 — part of a multi-departmental City of Seattle series on getting a permit 1 Seattle Department of Client Assistance Memo ...
0.003019525 |
a/104198
opcd-compplanamendments-sepathresholddetermination
. No significant adverse impact potential is identified. To the extent that future development occurs with denser commercial or mixed ...
0.003019525 |
a/87617
opcdindustrialstrategy-compplanamendments-sepathresholddeterminat ...
health. No significant adverse impact potential is identified. To the extent that future development occurs with denser commercial or ...
0.003019525 |
a/86773
430pipeline _site o_1519 federal ave e_120222 ak_final
. • Slowed vehicle traffic and possible road detours and closures may occur. • Equipment and construction vehicles near ...
0.003019525 |
a/137261
july13minutes
to skybridges forward to the docket for further analysis. He expressed his opinion that the City of Seattle lacks adequate prevention ...
0.003019525 |
a/108794
rpz_greenlake_postcardv2
balancing the needs of others to use the public right of way. RPZs help neighborhoods deal with parking congestion from ...
0.003019525 |
a/103639
spu-opportunities_bitterlakereservoirimprovements
Control and Tree Protection • Traffic Control Contracting approach Project will be contracted as design-bid-build. ...
0.003019525 |
a/160167
spu-opportunities_bitterlakereservoirimprovements
Control and Tree Protection • Traffic Control Contracting approach Project will be contracted as design-bid-build. ...
0.003019525 |
a/162266
june132013approvedminutes
traffic through using a narrower roadway space while at the same time allowing more space for transit and pedestrian‐bike i ...
0.003019525 |
a/108843
430pipeline-12thavene-nenorthlakeway_101222
your car outside of the work area and avoid parking in areas with no-park signs. • Slowed vehicle traffic and staging of ...
0.003019525 |
a/134880
idminutes9-25-18
. Brunkenhoefer said more capacity is needed and this is the best location. Mr. Williams asked if it is related to the stadium ...
0.003019525 |
a/73164
seattledesigncommission-2009.01.15connerhomesminutes
on California Avenue SW. Commissioners’ Comments and Questions The presentation is incredibly thorough and clear, with great graphics. Is ...
0.003019525 |
a/85462
2017opa-0172_mar_letter_11-09-2017
PursueSPD Policy 13.031-POL-3 explains when a pursuit is justified. The policy further states that"[o]fficers will not pursue solely for any ...
0.003019525 |
a/81775
2017opa-0172_mar_letter_11-09-2017
PursueSPD Policy 13.031-POL-3 explains when a pursuit is justified. The policy further states that"[o]fficers will not pursue solely for any ...
0.003019525 |
a/83824
seattle_central_college_cac_draft_mimp_comments_compiled
accessibility from Harvard into the plaza; c. Connection to the Broadway Performance Center; d. Retention of sense of respite with green ...
0.003019525 |
a/77056
cpu-volume-08-031519
heavy traffic. Through review of the officer’s ICV, OPA determined that his driving was justified, calculated, and ...
0.003019525 |
a/83714
march2017joint commissionletteronecentercityneartermstrategies
of vehicular traffic, the conversion of Pine and Pike to one-way streets runs counter to the idea of creating a ...
0.003019525 |
a/108906