You just searched for:
Search
Filter Results
6751 to 6775 of 14259
2018.05.03_sdc_meeting_seattlecenterarena_final_meetingminutes
http://www.seattle.gov/documents/departments/opcd/designcommission/seattlec ...
truck/service access will include a 30-foot wide curb cut, while vehicular access includes a 26-foot wide curb cut with two lanes dedicated ...
0.00308980537 |
a/85902
isrd_election_2023_revisedisrdguidlines_for9.22.23
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
Districtwide Guidance - Public Life 32 b. Promote a pedestrian environment while considering visibility for other traffic ...
0.00308980537 |
a/147561
vol4_sourcecontrol_july2025draft_redlines
http://www.seattle.gov/documents/departments/sdci/codes/changestocodes/stor ...
oil/water separator, catch basin filter sock, or equivalent BMP that is approved by SPU is required for parking lots that meet the threshold ...
0.00308980537 |
a/170617
levy2015_05_5_draftoutreachsummary
http://www.seattle.gov/documents/departments/sdot/about/documentlibrary/lev ...
• Improve bus service by making it more frequent and reliable • Make more efficient corridors for all modes of travel • Optimize ...
0.00308980537 |
a/99249
220705 aurora sbab
http://www.seattle.gov/documents/departments/sdot/boardscommittees/sbab/pre ...
drainage•Cut through traffic on neighborhood streetsAurora Ave N and N 76thSt, 1953•The Bicycle Master Plan (BMP) ...
0.00308980537 |
a/131339
fremontave
http://www.seattle.gov/documents/departments/seattlebicycleadvisoryboard/pr ...
fremontave ...
0.00308980537 |
a/107145
vision zero action plan
http://www.seattle.gov/documents/departments/sdot/boardscommittees/sbab/pre ...
began its Vision Zero efforts in 2015, nearly 1,643 people have been seriously injured and 224 people have been killed in a ...
0.00308980537 |
a/163594
1 - vision zero update - march 2024 loc meeting
http://www.seattle.gov/documents/departments/sdot/about/funding/loc/1 - ...
next34Since Seattle began its Vision Zero efforts in 2015, nearly 1,643 people have been seriously injured and 224 people have been killed ...
0.00308980537 |
a/153533
tab_vzap_briefing 03 27
http://www.seattle.gov/documents/departments/sdot/boardscommittees/tab/pre- ...
began its Vision Zero efforts in 2015, nearly 1,643 people have been seriously injured and 224 people have been killed in a ...
0.00308980537 |
a/163612
rainierimprovements_mailer_may2019
http://www.seattle.gov/documents/departments/sdot/visionzero/rainierimprove ...
in Seattle. We're working to make it safer for everyone. In 2014, we launched a collaborative process to improve Rainier as part of ...
0.00308980537 |
a/106755
2023 10 11_aurora_spab
http://www.seattle.gov/documents/departments/sdot/boardscommittees/spab/pre ...
RefresherIncluded in Seattle’s High Injury Network for traffic collisionsRapidRide E Line is one of the busiest frequent ...
0.00308980537 |
a/148219
wsdot_seattle_pedestrian advisory_board_presentation_v0.5
http://www.seattle.gov/documents/departments/sdot/pedestrianprogram/spab/pr ...
wsdot_seattle_pedestrian advisory_board_presentation_v0.5 Justin Nawrocki, Active Transportation CoordinatorShane Oden, Assistant Area ...
0.00308980537 |
a/103893
wseattle_boards(0)
http://www.seattle.gov/documents/departments/sdot/greenways/wseattle_boards ...
, and other greenwaysSlower Speeds and Stop Signs• Calm traffic entering and crossing the greenway• Drivers are better able ...
0.00308980537 |
a/102235
vol_4_sourcecontrol_jan2026draft_redlines
http://www.seattle.gov/documents/departments/sdci/codes/changestocodes/stor ...
, or equivalent BMP that is approved by SPU, is required for parking lots that meet the threshold for vehicle traffic ...
0.00308980537 |
a/176462
presentations013117_combined
http://www.seattle.gov/documents/departments/neighborhoods/majorinstitution ...
of proposed bicycle parking facilities. 3. Traffic safety impact evaluation (specific intersections per FEIS) and ...
0.00308980537 |
a/77569
rvsc2022jul
http://www.seattle.gov/documents/departments/sdot/publicspacemanagement/hom ...
)•Pedestrian Master Plan (PMP) Budget•Traffic Calming on S Bangor St•Traffic Calming on Beacon Ave ...
0.00308980537 |
a/138318
14-11-06-rv-n-s-ngw-mtg-1
http://www.seattle.gov/documents/departments/sdot/greenways/14-11-06-rv-n-s ...
Delridge Greenway Seattle’s traffic safety goal Zero traffic fatalities and serious injuries by 2030 ...
0.00308980537 |
a/101966
don_handbook_web
http://www.seattle.gov/documents/departments/neighborhoods/shared/community ...
by downloading the Find It, Fix It mobile app. You’ll be able to quickly and easily report issues, such as abandoned vehicles, graffiti, ...
0.00308980537 |
a/78627
northgatepedestrianbridge1
http://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/bridg ...
will be lost, leading to a lack of safety for pedestrian and bike traffic. Pine trees along the South side of the bridge ...
0.00308980537 |
a/100881
aluvmarchpresentation
http://www.seattle.gov/documents/departments/sdot/publicspacemanagement/hom ...
by Aurora Ave ProjectFunded by Aurora Ave ProjectFunded by Healthy StreetUse to develop conceptual designMedian traffic ...
0.00308980537 |
a/142752
2016_aac_ne_combinedmt
http://www.seattle.gov/documents/departments/sdot/maintenanceprogram/cowen/ ...
AVE NE15TH AVE NENE 45TH PLUNIVERSITY WAY NE35TH AVE NE2018 ARTERIAL PAVING - NORTHEAST SEATTLE 2018 Paving Projects5123415TH AVE NENo ...
0.00308980537 |
a/102900
2016_aac_ne_combinedmt
http://www.seattle.gov/documents/departments/sdot/maintenanceprogram/35thav ...
AVE NE15TH AVE NENE 45TH PLUNIVERSITY WAY NE35TH AVE NE2018 ARTERIAL PAVING - NORTHEAST SEATTLE 2018 Paving Projects5123415TH AVE NENo ...
0.00308980537 |
a/102771
2016_aac_ne_combinedmt
http://www.seattle.gov/documents/departments/sdot/maintenanceprogram/2016_a ...
AVE NE15TH AVE NENE 45TH PLUNIVERSITY WAY NE35TH AVE NE2018 ARTERIAL PAVING - NORTHEAST SEATTLE 2018 Paving Projects5123415TH AVE NENo ...
0.00308980537 |
a/102499
bbps_dropinsummary_august_final
http://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/bridg ...
more efficient travel, including: o Bus lane only o Wider lanes • On/off ramp improvements o Widening them o Rerouting vehicle ...
0.00308980537 |
a/100832
cc_streetcar_ridership_and_special_markets_memo_20231106
http://www.seattle.gov/documents/departments/sdot/streetcar/cc_streetcar_ri ...
the area around the stadiums. As traffic management efforts can close service at the Occidental Mall terminus of the ...
0.00308980537 |
a/151745
Previous
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
Next