Filter Results

451 to 475 of 505
idminutes4-11-17
23.66.030 – Certificates of approval – Application, review and appeals SMC 23.66.320 – Permitted uses SMC 23.66.326 – ...
0.002189833 |
a/73128
id12-13-16_minutes
through permitting now. Sonia-Lynn Abenojar said there is no awning now; the proposed awning will contribute to ...
0.002189833 |
a/72925
december2024_swac-meeting-minutes
to update so that it reflects current zoning and density • Objective: make permitting process more clear and safer for ...
0.002189833 |
a/165454
2022-solid-waste-plan-update_acronyms-glossary
. Seattle’s 2022 Solid Waste Plan Update Glossary Final Approved June 2023 Page vii TERM DEFINITION detachable container Also referred to ...
0.002189833 |
a/146048
october2024_swac-meeting-summary
the quality of the recycling stream o CDL permits in compliance - currently around 60-70% o Better compliance, better ...
0.002189833 |
a/165455
seattledesigncommission2008.01.17firestation30minutes
access a graceful arc across Elliott (steel with curve). Would value engineering permit access from the west side with ...
0.002189833 |
a/85804
seattledesigncommission-2008.01.17thomasstreetpedestrianbridgemin ...
now cannot access a graceful arc across Elliott (steel with curve). Would value engineering permit access from the west ...
0.002189833 |
a/85416
mpac minutes 07.12.2023 draft
collection • Battery Powered Small Equipment • Pilot Project: 1 Yard Dumpsters o Rasmussen seeks feedback on the ...
0.002189833 |
a/149323
uwannualreport2012
period. TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus Development Capacity in Campus Area ...
0.002189833 |
a/77871
uwannualreport2013
as of this reporting period. [ 8 ] TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus ...
0.002189833 |
a/77872
uwannualreport2015
Capacity in Campus Area Permitted GSF Development % of Total Development Capacity constructed as of this report Central 32% ...
0.002189833 |
a/77874
oed
districts through direct funding, technical support and Business Improvement Area (BIA) formation; • permit film and ...
0.002189833 |
a/62962
uwannualreport2016
Area as of 12/31/15 Campus Area % of Total Campus Development Capacity in Campus Area Permitted GSF Development % of Total ...
0.002189833 |
a/77875
surveyofhumanservicesudistirct
in the foreseeable future. States’ rights trump federal law, however, and Washington State permits needle exchange ...
0.002189833 |
a/87809
lpbcurrentnom_swed_supplemental report_bola
and 1960s.  Original construction permit drawings and an original specification from 1960 were reviewed along with 2017 rec ...
0.002189833 |
a/74549
designguideliensupdatefindingsandalternativesreportphase1
for a more integrated permitting team that could assist with projects wishing to go above and beyond the current LEED requi ...
0.002189833 |
a/87951
citywidedesignguidelines
of a parking structure45D-6 Screening of Dumpsters, Utilities and Service AreasBuilding sites should locate service ...
0.002189833 |
a/96290
2014oct27_cellars
Report # 2014-340134 - SPD Homicide file 14-319: The suspect JM went there with a date, he knew as R, to dance, etc. Before they entered the ...
0.002189833 |
a/50447
preservation-guide
Furniture, Fixtures, Equipment 50,000 - Soft Costs Development Costs Energy Audit 5,000 5,000 Environmental Study (Level I, ...
0.002189833 |
a/67741
dcpresentation1amazon-at-westlake-ave-and-lenora-stagendaid3599
-street bike space per 5,000 SF. Retail use requires 1 off-street bike space per 5,000 SF, after the first 50 spaces use ½ the ratio ...
0.002189833 |
a/85145
lpb092023leonapp
WILLCOME FROM GENERATORS.B.STAGING: STAGING OF DUMPSTERS TO BE ON HARDSCAPES AND NOT ON ANY SOFTSCAPES. THE CONTRACTOR ...
0.002189833 |
a/147302
lpb050323leonaparkridgedwgs
AND ONLY IN HIGH NEED AND SHORT DURATIONS. THE CONTRACTOR IS TO ASSUME ALL POWER NEEDS WILLCOME FROM GENERATORS.B.STAGING: STAGING OF ...
0.002189833 |
a/142009
qaescommitteerecommendationsfinal
security. The work will also provide improvements to the site including a staff parking lot and a service loading dock.In order to reclaim ...
0.002189833 |
a/76932
vol 3_b_bgt_feis_tech_appendix_b_web_lowrez
be by truck. The contractor would determine the best construction methods as permitted by the City and in conformance with ...
0.002189833 |
a/100533
seattledesigncommission-2014.11.06dennysubstationpresentation
the amount of light that is available to the open space.2. Permitted Setbacks - SMC 23.48.014-A.3a. Waiver for Development ...
0.002189833 |
a/85769