Filter Results

4301 to 4325 of 11077
shared micromobility permit requirements 6.0 2026 final
mobility options to advance Seattle’s climate goals. General G1. Nature of Permit. A street use permit issued to a Vendor as part of the ...
0.00220881612 |
a/178812
introduction
Library, Seattle Department of Transportation, Seattle City Light, Seattle Public Utilities (divided into four sections: ...
0.00220881612 |
a/62379
pspb081022glsection2
that a contemporary material is necessary to accurately replace the visual qualities of an element of an existing building. iv. The Board ...
0.00220881612 |
a/132194
shared_micromobility_permit_requirements
to advance Seattle’s climate goals. General G1. Nature of Permit. A street use permit issued to a Vendor as part of the Program ...
0.00220881612 |
a/143061
oneseattleplandeisenergynaturalresources
Plan Update. Thresholds of significance utilized in this impact analysis include: ▪ Energy usage in excess of projected ...
0.00220881612 |
a/153564
cip_overview
space to serve their intended purposes. The City’s utility infrastructure is also included in the CIP, including electric, ...
0.00220881612 |
a/178181
appendix_e_madison_hazmat_dr
with 21 directional platforms along the project corridor, new Transit Only Lanes (TOLs) and Business Access & Transit (BAT) lanes, ...
0.00220881612 |
a/106132
sdot
and new pay stations that allow flexibility in managing parking and pricing. 9% 8%City of Seattle - 2015 Adopted and 2016 ...
0.00220881612 |
a/62451
sdot
in smart technology, including a robust Transportation Operations Center and new pay stations that allow flexibility in ...
0.00220881612 |
a/62524
minutesjandec2014
Bradford, Melvenia R SPU Util Acct Rep Brown, Katherine K Law Admin Spec II Buckler, Eric J Library Page Carroll Jr, ...
0.00220881612 |
a/95636
gender-equity-in-pay-task-force-report
of food (2.3 years' worth).  Eight more months of mortgage and utilities payments.  16 more months of rent.  4,360 ...
0.00220881612 |
a/51783
2022-solid-waste-plan-update_chapter-6_solid-waste-handling-colle ...
Approved June 2023 Page 6.6 Figure 6.1 Commercial and Residential Collection Service Areas 2019 Source: Seattle Public ...
0.00220881612 |
a/146067
2021periodicreviewchecklistguidance
, as defined by this chapter: (a) that is designed or used primarily as a residence on the water and has detachable ...
0.00220881612 |
a/168092
sustainable_building_cluster_study_030105
by the City through City Light and Seattle Public Utilities. • Upzoning: increased floor-area-ratios (FARs), height and ...
0.00220881612 |
a/56441
q2-2024-sbp-progress-report
q2-2024-sbp-progress-report SBP Progress Report Second Quarter, 2024Implementing the 2021-2026Strategic Business Plan UpdateSeptember 16th, ...
0.00220881612 |
a/163157
rsji survey report 2018 - final
FROM HISTORYHistory is a tool for effective organizing. Understanding the lessons of history allows us to create a more ...
0.00220881612 |
a/95997
2025interimstreetactivationordinancesdci
set forth in this Section 23.42.041 is allowed to fulfill street-level use requirements in 18 addition to uses ...
0.00220881612 |
a/167708
oneseattleplanfeis-chapter3.4-energynaturalresources
Comprehensive Plan Update. Thresholds of significance utilized in this impact analysis include: ▪ Energy usage in excess of ...
0.00220881612 |
a/165720
k - 6 earthquake cirriculum tremor troop
there is an earthquake?Has anyone here ever felt an earthquake? (Allow studentstime to express their observations and ...
0.00220881612 |
a/57221
opcdudistrictseisworkshopworksheet
of 2015 U-District FEIS.)Implement MHA and increase floor area and/or height by one to two stories.The SEIS alternatives differ in whether ...
0.00220881612 |
a/87787
review team evaluations 060217
begins at John St, with a tunnel on the 1st Ave N Garage lot, which allows for the needed 50’ drop before entering the new ...
0.00220881612 |
a/56240
oed_jobs_plan_8-25-2011-final
units o Concentrate street-level commercial uses in pedestrian zones o Allow small commercial uses in certain multifami ...
0.00220881612 |
a/56198
capitolhillguideline
.............................................................................yesParking and Vehicle Access (former A-8)Screening of ...
0.00220881612 |
a/87950
capitolhillneighborhooddesignguidelines2013
.............................................................................yesParking and Vehicle Access (former A-8)Screening of ...
0.00220881612 |
a/86464
capitolhilldg2013
.............................................................................yesParking and Vehicle Access (former A-8)Screening of ...
0.00220881612 |
a/139424