Filter Results

3476 to 3500 of 3631
pspbagenda_6-13-18 arc
Paper” PSB 137/18 AGENDA – ARCHITECTURAL REVIEW COMMITTEE MEETING Date: Wednesday, June 13, 2018 Time: 9:00 a.m. Place: ...
0.002142034 |
a/73982
sr_aug25
, interior displays, bar, and sliding door, interior finishes, and pie production equipment. Exhibits: • Photos of existing conditions • ...
0.002142034 |
a/73702
lpbagenda_10-16-19
Interlake Avenue N Request for extension 101619.6 BRIEFING 101619.61 Century 21 Coliseum / Key Arena 60 minutes 305 Harrison Street ...
0.002142034 |
a/74774
ccrcagenda_10-2-18
, atelier dome architecture Street Use and Design: Proposed sidewalk café. 100218.14 3610 S. Edmunds St. – PCC @ The ...
0.002142034 |
a/72820
20181204-hubbardpublicmeetingnotes
20181204-hubbardpublicmeetingnotes HUBBARD HOMESTEAD PLAY AREA PROJECT Seattle Parks and Recreation’s Planning & ...
0.002142034 |
a/93220
lpb27520_kimball_sf
of the designation standards. The Landmarks Board Coordinator recognizes the school’s architecture as representative of ...
0.002142034 |
a/75324
ccrcagenda_6-5-18
BRIEFINGS 060518.11 4915 Rainier Ave. S. – Limeña (formerly Bar Tapeo) 4:00 PM Presenter: Miriam Hinden, atelier dome ...
0.002142034 |
a/72854
isrd3621(0)
near the southeast corner of the building on S. Main St. See attached plans, renderings, specifications and cut sheets. ...
0.002142034 |
a/73327
isrd3621
and incorporated into the façade near the southeast corner of the building on S. Main St. See attached plans, renderings, ...
0.002142034 |
a/73328
13publicparticipation
an on-going opportunity for citizens to participate in planning and development of policies and programs and to advise SPU ...
0.002142034 |
a/112435
pspbagenda_8-29-18_arc
Paper” PSB 228/18 AGENDA – ARCHITECTURAL REVIEW COMMITTEE MEETING Date: Wednesday, August 29, 2018 Time: 9:00 a.m. ...
0.002142034 |
a/74024
isrd031224_engsr
of a Certificate of Approval for use and for exterior and site alterations as identified on the applicant’s site plan and ...
0.002142034 |
a/153580
pspbagenda_9-5-18
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/74043
final - 2017.07.25 capitol hill guidelines update meeting ...
Office of Planning & Community Development (OPCD) and Department of Construction & Inspections (SDCI) and the Capitol Hill ...
0.002142034 |
a/86467
pioneersquare-01-21-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/73722
pioneersquare-01-07-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/73720
final-2018.01.25capitolhillguidelinesupdatemeetingminutes
, the fifth work group session was held at 12th Ave Arts (1620 12th Ave) in the Capitol Hill Neighborhood of Seattle. This meeting was ...
0.002142034 |
a/86471
pioneersquare-04-01-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/73729
pspbagenda_7-1-15
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/73996
pioneersquare-03-18-15-agenda
: In addition to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/73728
ballard-03-05-15-agenda
Jonathan Williams Update on plans to install pay kiosks within the Ballard Avenue Landmark District. 030515.22 C & C ...
0.002142034 |
a/72636
bordeaux_nom_sr
characteristics of an architectural style, or period, or a method of construction. E. It is an outstanding work of a ...
0.002142034 |
a/75180
pspbagenda_6-3-15
to attending the Board meeting, all applicants with the exception of those seeking a change of use should appear before the ...
0.002142034 |
a/73992
isrd082724_515 s. main_sr
details: This is part of a pilot program where installation is planned for one- to two-years, after which time the ...
0.002142034 |
a/159512
isrd082724_670 s. weller_sr
: This is part of a pilot program where installation is planned for one- to two-years, after which time the structure would ...
0.002142034 |
a/159511