Filter Results

3326 to 3350 of 11068
final seattle university mimp report fy24 2024.09.23
of 52 July 2013 Update: This language and the associated plan was incorporated into the final compiled MIMP of March 2013. 3. The ...
0.0022159717 |
a/162914
pspbminutes11-6-19
sign package or plan will be considered reduced for purposes of the exception if it calls for approval of signage that is substantially less ...
0.0022159717 |
a/74057
departurerecommendations-2008-12
a departure from building height as allowed under SMC 23.44.017 and SMC 23.79. 1.2 Project Description The project ...
0.0022159717 |
a/76723
1823adoptedcipoverview
. The City’s utility infrastructure is also included in the CIP, including electric, solid waste, water and wastewater ...
0.0022159717 |
a/62881
sepa-checklist-transitional-encampments-expansion_8.6.2019
that transitional encampments for homeless individuals are allowed on any property owned or controlled by a religious ...
0.0022159717 |
a/53905
fas
utilities, to reporting a pothole, requesting public information or even adopting a new pet. The department’s 600-plus ...
0.0022159717 |
a/127196
south park sea level rise adaptation strategy - final summary ...
south park sea level rise adaptation strategy - final summary (2) 700 Fifth Avenue | PO Box 34018 | Seattle, WA 98124-4018 | ...
0.0022159717 |
a/128186
vtsusermanual2013(0)
infrastructure utilized by a myriad of vessel types. In addition to large commercial traffic destined for the refineries ...
0.0022159717 |
a/95021
vtsusermanual2013
infrastructure utilized by a myriad of vessel types. In addition to large commercial traffic destined for the refineries ...
0.0022159717 |
a/95022
vtsusermanual2013
infrastructure utilized by a myriad of vessel types. In addition to large commercial traffic destined for the refineries ...
0.0022159717 |
a/95277
rpmtgmaterials03182026
information, and seek clarification to allow time for City Light to respond. The goal is to address all items before ...
0.0022159717 |
a/179103
annual_report_2009
by the State of Washington. Employees of METRO and the King County Health Department who established membership in the System when these ...
0.0022159717 |
a/95758
2009scers-annual report
allowed to continue their System membership. There are currently 5,304 retirees and beneficiaries receiving benefits, and ...
0.0022159717 |
a/95745
southlakeunionurbandesignframework
space. View corridors and sunlight access to streets were carefully considered, leading to recommendations to limit the number of new towers ...
0.0022159717 |
a/87716
plans_gtdt pbl_90 percent design
SPECIFICATION 9-05.18.5.SEATTLE PUBLIC UTILITIES (SPU) APPROVAL IS REQUIRED FOR ALL PROPOSED NEW CATCH BASINS,INLETS AND ...
0.0022159717 |
a/150306
2018sbcchapter31
, as appropriate, of NFPA 701. 3102.4 Allowable floor areas. The area of a membrane structure shall not exceed the ...
0.00221588137 |
a/97445
psb6-1-16_minutes
devices may be permitted subject to the use provisions and development standards of the underlying zone and this chapter, with the following ...
0.00221588137 |
a/73775
sdot
flows and provide travelers with enhanced information about travel conditions during this period of intense construction activity in ...
0.00221588137 |
a/62249
2018sfgcchapter3
) and the 2012 Edition of ANSI Z223.1/NFPA 54 (National Fuel Gas Code). 301.2 Energy utilization. Heating, ventilating and ...
0.00221588137 |
a/97211
desrptnorthwestrooms
planning the 1962 Seattle World’s Fair design, Paul Thiry utilized the neighborhood street grid as the underlying ...
0.00221588137 |
a/76190
cherry hill mimp_2023 annual report_final
rate of 50 percent prior to approval of the first building permit, including demolition, allowed under the Master Plan. No ...
0.00221588137 |
a/163233
ch mimp_2023 annual report_final resubmission
will be to achieve an employee SOV rate of 50 percent prior to approval of the first building permit, including demolition, ...
0.00221588137 |
a/163966
2021sfgcchapter3
utilization. Heating, ventilating and air-conditioning systems of all structures shall be designed and installed for ...
0.00221588137 |
a/162665
5-publicsafety
in the region. Under the new agree-ment, King County will guarantee Seattle 228 jail beds in 2012 which will be enough to ...
0.00221588137 |
a/61960
dwf
dwf SPU -DRAINAGE ANDWASTEWATER City of Seattle 2004-2009 Proposed Capital Improvement Program 313SPU – Drainage & Wastewater Overview of ...
0.00221588137 |
a/60559