You just searched for:
Search
Filter Results
426 to 450 of 1913
part_ii_intro
https://www.seattle.gov/documents/departments/sdot/stp/part_ii_intro.pdf
Enhances The freight network map, first- and last-mile connectivity needs for major port, industrial, and intermodal ...
0.001761099 |
a/158019
ch4
https://www.seattle.gov/documents/departments/sdot/bikeprogram/bgt/ch4.pdf
Manufacturing and Industrial Center (BINMIC) Plan•Seattle Department of Transportation Freight Mobility ...
0.00176109152 |
a/100491
ducpg-plan
https://www.seattle.gov/documents/departments/neighborhoods/planning/plan/d ...
Streets andpedestrian-oriented streets.tCreate a downtown-wide urban designmaster plan..The City should hire a ...
0.0017604786 |
a/78400
feisv2
https://www.seattle.gov/documents/departments/sdci/vault/scsigncodeoverlay/ ...
+ arena traffic 3,650 Source: Fehr & Peers, 2017. Step 2 - Estimate mode split and Average Vehicle Occupancy (AVO) using data from the ...
0.00176032283 |
a/98740
transportation
https://www.seattle.gov/documents/departments/financedepartment/0914adopted ...
of the Bicycle Master Plan, design and construction of three new trail segments, construction of more than ...
0.00176029385 |
a/61478
utilitiesandtransportation
https://www.seattle.gov/documents/departments/financedepartment/11adoptedbu ...
the Transit Master Plan, accelerate implementation of the Pedestrian Master ...
0.00176026381 |
a/61884
transportation
https://www.seattle.gov/documents/departments/financedepartment/0914propose ...
the Gap program for 2009 include a plan to repave more that 24 lane miles of arterials, continued implementation of the ...
0.00176012306 |
a/61533
stp_checklist2022_0610_signed_rd_encrypted
https://www.seattle.gov/documents/departments/sdot/projectsandprograms/stp_ ...
for the environmental elements (Part B) that they determine do not contribute meaningfully to the analysis of the proposal. June 2022 City ...
0.00175994239 |
a/129527
seattle city light 2020 final os
https://www.seattle.gov/documents/departments/investorrelations/2020 ...
Manager of Grid Operations and Planning. Mr. Baggs holds a bachelor's degree in Economics from the University of Colorado ...
0.00175985775 |
a/58477
approved sfab minutes october 2023
https://www.seattle.gov/documents/departments/sdot/boardscommittees/sfab/ap ...
have a lot of concerns about the freight elements in particular, and the plan overall. I don't see where ...
0.00175976777 |
a/153908
isrd101122ls2030ationplanfinalwebversion
https://www.seattle.gov/documents/departments/neighborhoods/historicpreserv ...
neighborhood has four distinct zoning categories: Neighborhood Commercial (NC), Downtown Mixed Residential (DMR), Downtown Mixed Commercial ...
0.00175975263 |
a/134616
appendixb
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/seatt ...
needs HCT.6/24/2014DisplayBoardsComp Plan must support all adopted transportation master ...
0.00175973843 |
a/87489
outsidecitywidereport2018
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/outsi ...
, school gardens, landscaping, master site plans. Many projects are proposed by a Parent Teacher Student ...
0.00175969023 |
a/87316
sdot_birt_report_appendices_110220_g
https://www.seattle.gov/documents/departments/sdot/projectsandprograms/ball ...
39) Freight W Dravus Street NB on/off-ramp SB Off/On-ramps Interbay Both Alternatives Freight ...
0.00175955368 |
a/103982
outsidecitywidereport2018
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/outsi ...
school buildings or grounds, including new playground equipment, murals, school gardens, landscaping, master site ...
0.00175916357 |
a/86170
comprehensive-annual-financial-report-2010
https://www.seattle.gov/documents/departments/cityfinance/financialservices ...
demands, including those priorities and investments identified in the Pedestrian Master Plan and the ...
0.00175869337 |
a/58356
sfab minutes april 2023 approved
https://www.seattle.gov/documents/departments/sdot/boardscommittees/sfab/sf ...
, a lot of community engagement. So, that was a big thing as part of coming in to make sure 16 Lot of community engagement. ...
0.00175864436 |
a/143516
lfs-existing-conditions-and-context-memorandum
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/lidi5 ...
, and happiness.The City of Seattle has developed a number of modal plans: Pedestrian Master ...
0.00175857812 |
a/135026
lidi5existingconditionscontextmemorandum
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/lidi5 ...
plans: Pedestrian Master Plan, BicycleMaster Plan, Transit ...
0.00175857812 |
a/87191
august 2023 sfab minutes approved
https://www.seattle.gov/documents/departments/sdot/boardscommittees/sfab/au ...
not acceptable to mix bikes and trucks. SDOT knows how to do it right with the design guidelines and the Freight ...
0.00175835588 |
a/147926
mageafinal
https://www.seattle.gov/documents/departments/sdot/bridgestairsprogram/brid ...
Neighborhood Association master plan proposal would increase residential density in the West Dravus Street ...
0.0017580709 |
a/100849
capitolhillneighborhoodplan1998
https://www.seattle.gov/documents/departments/opcd/ongoinginitiatives/capit ...
designL.,1- ,!.,,retains orig~al 79ti ,.,-, -,.,Olmsted design—–~ ? r—–”—~ ~–-!1IFigure 7. The Lincoln Reservoir/Park site ...
0.00175787508 |
a/86465
capitol-hill-plan
https://www.seattle.gov/documents/departments/neighborhoods/planning/plan/c ...
- ,!.,,retains orig~al 79ti ,.,-, -,.,Olmsted design—–~ ? r—–”—~ ~–-!1IFigure 7. The Lincoln Reservoir/Park site master ...
0.00175787508 |
a/78392
amstatuscondrpt2020final
https://www.seattle.gov/documents/departments/sdot/about/documentlibrary/re ...
environment: streetsillustrated.seattle.gov/ ✓ Bicycle Master Plan (BMP) – A 20-year plan ...
0.00175785588 |
a/140895
transportation_projects
https://www.seattle.gov/documents/departments/financedepartment/1015adopted ...
at the Budget Control Level. Amounts are in thousands of dollars.Bike Master Plan ImplementationSeattle ...
0.00175738311 |
a/61670