Filter Results

2451 to 2475 of 5722
lpb030123cettolinhousenom
Resource Consulting Date: November 27, 2022 PO Box 115 / Seattle WA 98111 / 206-376-7761 / david@dphrc.com ...
0.002204882 |
a/139112
lpbcurrentnom_cettolinhouse
Resource Consulting Date: November 27, 2022 PO Box 115 / Seattle WA 98111 / 206-376-7761 / david@dphrc.com ...
0.002204882 |
a/137963
lpb040523olivewaynom
in this report include: • Material on file at the Seattle Department of Construction and Inspections (SDCI) microfilm library, including ...
0.002204882 |
a/140524
lpb040523olivewaynom
in this report include: • Material on file at the Seattle Department of Construction and Inspections (SDCI) microfilm library, including ...
0.002204882 |
a/140469
lpbcurrentnom_1550_olive
in this report include: • Material on file at the Seattle Department of Construction and Inspections (SDCI) microfilm library, including ...
0.002204882 |
a/139953
lpb092023leonapp
BE SUBMITTED FOR PERMIT, THE CONTRACTOR OR COMPONENT VENDOR MUST HIRE AN ENGINEER REGISTERED IN THE STATE OF WASHINGTON AND ...
0.002204882 |
a/147302
lpbcurrentnom_rainier beach graphics
....................................... A-43 Figure 79 • City of Seattle Permit no. 477553, To Const Bldgs - per plan, ...
0.002204882 |
a/74526
rb_nom
....................................... A-43 Figure 79 • City of Seattle Permit no. 477553, To Const Bldgs - per plan, ...
0.002204882 |
a/75413
ywca_photos
GUARDRAIL14EXHAUST SHAFT006PRE-MANUFACTURED STEEL STAIRS, LANDINGS, & HANDRAILSPRE-MANUFACTURED STEEL STAIRS, LANDINGS, & HANDRAILS16R @ ...
0.002204882 |
a/75523
pioneersquare-application
Square Preservation Board (hereafter, Board) and the Director of the Department of Neighborhoods. They are required before the City will ...
0.00220477465 |
a/73734
psb10-7-15_minutes
with these goals, installation of permanent metal security bars in storefront windows is prohibited. Permanent ornamental gates are ...
0.00220477465 |
a/73748
7templatecontract
, the amount withheld and actions the Consultant must take to resolve the disputed items. The City default is to delay payment until a ...
0.00220477465 |
a/145794
sipfrtransmittalform
. Optional Material Submittals: 1 CADD file of 90% plans. Other Materials Submitted: _____________________________ Formal Review Plan ...
0.00220477465 |
a/104858
2004_09_23_approvedminutes
and Commissioner Eanes seconded to approve the September 9, 2004 Commission minutes with the following revision: the Tacoma ...
0.00220477465 |
a/108268
pspb_application_2017
in subsection B, prior to issuance of permits for any work. Revised February 2016 APPLICATION FOR ...
0.00220477465 |
a/74093
pspb_application_2019
of Neighborhoods. They are required before the City will issue permits for work that results in any change to the exterior ...
0.00220477465 |
a/74094
pspbapplication ch
Preservation Board (hereafter, Board) and the Director of the Department of Neighborhoods. They are required before the City will issue ...
0.00220477465 |
a/74047
public_safety
position is proposed to develop and conduct a marine vessel fueling permit and inspection program required for public ...
0.00220477465 |
a/61093
public_safety
of the Joint Assessment Team. A Lieutenant Prevention Inspector position is added to develop and conduct a marine vessel fueling ...
0.00220477465 |
a/61067
2021-22_drc_contract_sampleagreement_21_0331 (1)
, the amount withheld and actions the Consultant must take to resolve the disputed items. The City default is to delay payment until a ...
0.00220477465 |
a/70335
seattledesigncommission-2018.10.049thavesstreetvacation_seattleni ...
is being developed on the parcel bounded by 9th Ave S and Airport Way S (Master Use Permit #3025665-LU). Phase II, which ...
0.00220477465 |
a/84719
seattledesigncommission-2004.04.01jointtrainingfacilityminutes
the recent changes and does not need to see the project again. Key Visitor Comments and Concerns ƒ The project will proceed into ...
0.00220477465 |
a/85336
city.of.seattle.consultant.agreement.boilerplate.2022
to resolve the disputed items. The City default is to delay payment until a revised invoice is submitted and approved. ...
0.00220477465 |
a/136378
cos_boilerplate_consultant_2022
items. The City default is to delay payment until a revised invoice is submitted and approved. However, the Consultant may ...
0.00220477465 |
a/145804
2024 dw rfp terms and procedures
a revised version that shows their proposed alternative contract language in track changes or redline format. The City is ...
0.00220477465 |
a/161086