Filter Results

2201 to 2225 of 2735
lpb062624firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00214708922 |
a/157543
lpb061424firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00214708922 |
a/157146
landuseapplicationfeerequirements
a minimum initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. ...
0.00214708922 |
a/98099
2019_0311 seattle amihac meeting #2
Elasticity of Supply(% change in price)(% change in supply)How are Middle Income Households Served in the Housing Market?9Filtering, ...
0.00214708922 |
a/72100
sccmimpprelimdrafteissectioniii3.4_environmental ...
following demolition of the building. Approximately 407 cubic yards of PCS were removed for off-side disposal. Soil samples ...
0.00214708922 |
a/138074
overview_2530adoptedcip
and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) ...
0.00214708922 |
a/166660
04-10-08
current building codes, although it continues to be home to a wide range of events through event permits issued by the Fire ...
0.00214708922 |
a/92037
03.28.2024 bprc meeting minutes
Scheduling Unit completed processing of the picnic lottery applications received to date on March 14th in record time! The team created a ...
0.00214708922 |
a/155891
firefuel
an event in any park for which a permit is required by this chapter or by rules of the Superintendent without first ...
0.00214708922 |
a/92720
spu drainage & wastewater fund 2023 audit fs
to accommodate SDOT's Waterfront Seattle Program  $3.2 million for construction project artwork  $2.9 million for ...
0.00214708922 |
a/156365
spu drainage & wastewater 2022 audit fs
(An Enterprise Fund of the City of Seattle) Management’s Discussion and Analysis 12 • $3.2 million for construction project artwork • $2.9 ...
0.00214708922 |
a/142567
solid-moodys-2016
-overyear, and commercial office vacancy rates continues todecline. The city is forecasting a slowing of growth in 2017 back to 2014 levels, ...
0.00214708922 |
a/58590
07.16.2020-ddr2020-13treeprotection
of the proposed location of structures, access, utilities and a consideration of the intensity and location of land disturbance activities ...
0.00214708922 |
a/118958
fascap
) weatherization program, and exterior repairs;SMT elevator controls study;SMT 14 demolition and structural repairs;Roof ...
0.00214489433 |
a/62376
finalreport2013
On July 26, 2013, the Seattle School District No. 1 submitted a request for departures from certain Seattle Municipal Code Development ...
0.00214489433 |
a/76626
moving.the.needle.2014
MaTeRialSProgreSSthe leading edgeconStruction & demolition ProgramIn part because of Seattle’s efforts, manufacturers are ...
0.00214489433 |
a/88432
moving.the.needle.2014
MaTeRialSProgreSSthe leading edgeconStruction & demolition ProgramIn part because of Seattle’s efforts, manufacturers are ...
0.00214489433 |
a/57490
moving.the.needle.2014
MaTeRialSProgreSSthe leading edgeconStruction & demolition ProgramIn part because of Seattle’s efforts, manufacturers are ...
0.00214489433 |
a/90629
fas
construction work includes, but is not limited to, demolition, complete construction of the interior finishes, including ...
0.00214489433 |
a/62903
fascap
construction work includes, but is not limited to, demolition, complete construction of the interior finishes, including ...
0.00214489433 |
a/62904
administration
) weatherization program, and exterior repairs;SMT elevator controls study;SMT 14 demolition and structural repairs;Roof ...
0.00214489433 |
a/62370
spr_2429adoptedcip
Remediation. • Changes to the Carkeek Bridge project budget reflect the actual project timeline given long timelines for BNSF and shoreline ...
0.00214489433 |
a/153296
dadu_submission116
ON CONSTRUCTION OF PERMIT #6588433-CN IN SUMMER -EARLY FALL OF 2019 WHICH RESULTED IN A CONSTRUCTION COST OF ABOUT $135K. ...
0.00214489433 |
a/86911
seacap2006plan
accelerates the process, it is not a new source of CO2.The City’s role in this project is limited to permit review and ...
0.00214489433 |
a/88486
seattle consumption based emissions inventory 2019
and encourage reuse of these same materials, Seattle requires building salvage assessments for all demolition projects and ...
0.00214489433 |
a/138290