Filter Results

2076 to 2100 of 4249
desrptwoodrowwilson
“Bond Issue is Needed Badly, Says School System Veteran,” March 11, 1946, p. 17. “Builders Plan Exhibits,” December 28, 1947, p.15 ...
0.002198874 |
a/76319
woodrow-wilson-designation
, 1940 p.5 “Bond Issue is Needed Badly, Says School System Veteran,” March 11, 1946, p. 17. “Builders Plan Exhibits,” December 28, 1947, ...
0.002198874 |
a/76596
capdetailedstatusreportfeb2015
added three gardens, in Northwest, Capitol Hill and Beacon Hill providing garden space ...
0.002198874 |
a/88258
lpbminutes11-20-19
Capitol Hill neighborhood. During the late 1920s, Hodgson apparently participated in competitions, ...
0.002198874 |
a/75006
seattledesigncommission-2011.04.07firsthillstreetcarminutes
. PRESENTATION The design team presented the schematic design of the First Hill streetcar, a 2.5 mile line from Pioneer ...
0.002198874 |
a/85612
seattle_4yrpiloteval_final
” programming to Seattle’s Center City (Uptown/Queen Anne, Capitol Hill, First Hill, and ...
0.002198874 |
a/106514
2024designreviewexemptionsepadetermination
Hill portion of the First Hill/Capitol Hill Urban Center, from the ...
0.002198874 |
a/155314
2018-work-program
Authority, Capitol Hill Housing, and Lake Union Partners are collaborating on a feasibility study and set ...
0.002198874 |
a/53343
seatran
Village:Neighborhood District:BallardBallardCrown Hill/BallardNeighborhood Plan:3RD AV NW and NW 105TH ST to NW 110TH ...
0.002198874 |
a/60376
seattle_public_utilities
and associated drainage infrastructure to treat runoff from over 200 acres of Capitol Hill. This project ...
0.002198874 |
a/61269
seattle_public_utilities
Code:C334B941000005,0935,1883rd Ave. NW & NW 107th Street Natural SystemC30032932114113113513814114401,151Capital Planning – Low Impact ...
0.002198874 |
a/61327
pmp_spab_120915
Broadview 146 Capitol Hill 133 Lower Queen Anne 128 Maple Leaf 123 Crown Hill 120 ...
0.002198874 |
a/99348
appendix a
difficult and O&M will increase as the system continues to age. Operations and maintenance costs are not expected to change as a result of ...
0.002198874 |
a/63556
appendix_a
to change as a result of this project. The Capitol Hill Underground Ordinance area does not have capacity ...
0.002198874 |
a/127139
appendixa_2328cip
costs are not expected to change as a result of this project. The Capitol Hill Underground Ordinance area ...
0.002198874 |
a/138611
appendixcip
are not expected to change as a result of this project. The Capitol Hill Underground Ordinance area does ...
0.002198874 |
a/134214
sclcip
:East DistrictTotal Project Cost:N/AUrban Village:First Hill/Capitol HillThis ongoing project funds a ...
0.002198874 |
a/147696
scl_2429adoptedcip
:First Hill/Capitol HillThis ongoing project funds a programmatic approach for comprehensive management of ...
0.002198874 |
a/153302
sdotcip
and the Capitol Hill Station (at Broadway and John Street). The system will provide reliable, frequent ...
0.002198874 |
a/127136
app f rapidride roosevelt hazardous materials technical ...
and lies on seven significant hills, including Capitol Hill, First Hill, ...
0.002198874 |
a/106304
entire_2007-2008_proposed_budget
have been completed, including the NewHolly branch (1999); Wallingford (2000); Delridge (2002); Capitol ...
0.002198874 |
a/61082
sdot
to the International District/Chinatown Station and the Capitol Hill Station (at Broadway and John ...
0.002198874 |
a/63567
sdotcap
but not limited to the International District/Chinatown Station and the Capitol Hill Station (at Broadway ...
0.002198874 |
a/63082
entire_2007_adopted_&_2008_endorsed_budget
. As of December 2006, 21 "Libraries for All" projects have been completed, including the NewHolly branch (1999); Wallingford (2000); ...
0.002198874 |
a/61058
sdotcip_000
centers to the regional Link light rail system, including but not limited to the International District/Chinatown Station and the ...
0.002198874 |
a/63153