Filter Results

1801 to 1825 of 2735
cmpcucacreportaug2017
in the University District Northwest Urban Center Village (UDNUCV), including the number and types of units built, the number, types and ...
0.00215056958 |
a/77694
southparkrfptechanalysis2022
with the permitting and scheduling of large infrastructure projects; and the standards, design processes, methodologies and ...
0.00215056958 |
a/133382
cam5022_recreationalfires
cam5022_recreationalfires CAM 5022 Client Assistance Memo Seattle Fire Department Seattle Permits City of Seattle Fire ...
0.00215056958 |
a/64142
dpr_projects
resulting from this project are paid by the General Subfund, per Ordinance 121488.4th Quarter 20063rd Quarter 2008BCL/Program Name:West ...
0.00215056958 |
a/61250
dpr_projects
, per Ordinance 121488.4th Quarter 20063rd Quarter 2008BCL/Program Name:West Point Settlement ProjectsDiscovery Park - Building 653 ...
0.00215056958 |
a/61306
seattle questions aeg response design and transpo
is the anticipated building permit application submittal date? We anticipated pulling the building permit ...
0.00215056958 |
a/56278
1_summary_adu_feis_2018
modify the rules that regulate when and where a property owner can create an ADU to make it easier for property owners to ...
0.00215056958 |
a/53163
mpcf doc briefingpaper2
) for planning and outreach, design and permitting to construction funding, depending on project readiness. SPR staff ...
0.00215056958 |
a/92410
5022camrecreationalfires
5022camrecreationalfires CAM 5022 Client Assistance Memo Seattle Fire Department Seattle Permits City of Seattle Fire ...
0.00215056958 |
a/64035
2005annualreportweb
was installed and abatement and demolition of the shop building began. TheFremont Bridge Operations and Maintenance Shop ...
0.00215056958 |
a/99359
cost-of-green-affordhousing
LEED Checklists either achieved, or are pursuing both points under MRc2 Construction Waste Management which requires that least 75% of ...
0.00215056958 |
a/88276
equitabledevelopmentindicators
of units represented in permits flagged for TRAO (permits are flagged if changes may require tenants to ...
0.00215056958 |
a/108549
finalreport20141222revised20150203
in obtaining permits from WSDOT. To demonstrate how this plays out over the life of this analysis, SDOT accumulated …$61.7 ...
0.00215056958 |
a/50587
2011mar29_hotspotswhatworks
with this goal in mind. Issues such as police overtime for special operations to reduce crime, façade programs to improbusiness districts, ...
0.00215056958 |
a/143966
potentialcontractingopportunities
on privately-owned property. Includes demolition and restoration of an existing pavement, construction of 5 concrete ...
0.00215056958 |
a/50864
uw-annual-report-2020
Play yet, so there are no identified changes in direct, indirect, and cumulative adverse impacts to the surrounding community and the City. ...
0.00215056958 |
a/77866
cpted
. Secure access to vacant property 1261 S King St. Seattle Department of Construction and Inspections (SDCI) enforcement action ...
0.00215056958 |
a/142760
uwmc-northwest concept plan
throughout construction and redevelopment. This means that replacement buildings may be built for existing functions to relocate before ...
0.00215056958 |
a/140046
all_appendices_adu_deis_2018
, and mode for parcels of a similar size. Our development prototypes assume that any existing accessory structures would be demolished to ...
0.00215056958 |
a/53197
lpb102723terminalsales2smallversion
EXISTING STRUCTURE DIMENSIOINS. SEE DETAILS FOR ADDITIONAL INFORMATION.2. INSTALL BRACING PRIOR TO DEMOLITION OF EXISTING ...
0.00215056958 |
a/148796
ursula judkins viewpoint park concept plan report
, but provides an order-of-magnitude cost base for the project. Construction Costs (with markup and tax) Site Preparation and ...
0.00215056958 |
a/152695
dexter_horton_pres
. #108.03.2020PRICING SET REV. #208.10.2020HISTORIC REVIEW SETDemolition PlanI-1.31.OBTAIN DEMOLITION ...
0.00215056958 |
a/75221
lidi5economicfinancialfeasibilitymemorandum
of the lid project, alternatives analysis and preferred alternativeselection, planning—including public outreach and environmental ...
0.00215056958 |
a/87190
lfs-economic-financial-feasibility-memorandum
of the lid project, alternatives analysis and preferred alternativeselection, planning—including public outreach and environmental ...
0.00215056958 |
a/135023
lpb060524terminalsalesannexpp
INFORMATION.2. INSTALL BRACING PRIOR TO DEMOLITION OF EXISTING STRUCTURE.3. ALL EXISTING FOUNDATION INFORMATION IS NOT ...
0.00215056958 |
a/156830