Filter Results

1776 to 1800 of 1839
final_eop
or in anticipation of an approaching incident or event that is expected to cause a significant impact and result. City of ...
0.00219842652 |
a/57120
2021-community-safety-capacity-building-rfp_finalv4
of requests close to the application deadline will result in limited availability of the technical advisors. Should availab ...
0.00219842652 |
a/69364
2021-community-safety-capacity-building-rfp_finalv3
of requests close to the application deadline will result in limited availability of the technical advisors. Should availab ...
0.00219842652 |
a/69363
rainierpf
into a sewer and covered with agarbage fill. A small comfort station was built in 1913. In 1916 the improvement ofstreets ...
0.00219842652 |
a/141335
anticipated_projects_flyer_1_2018(0)
to have N 40th as an additive with N 50th/Stone as the base bid. YYYYYYYYYYYYYNNYYYNNYYN46AAC - N 40th StMegan Hoyt ...
0.00219842652 |
a/99754
anticipated_projects_flyer_1_2018
to have N 40th as an additive with N 50th/Stone as the base bid. YYYYYYYYYYYYYNNYYYNNYYN46AAC - N 40th StMegan Hoyt ...
0.00219842652 |
a/99755
seattle arena rfp 1-11-2017
and termination rights. 5) The Development Agreement and Lease Agreement which result from this RFP are subject to ...
0.00219842652 |
a/56207
2021-community-safety-capacity-building-rfp_final
. Applicants are strongly encouraged to schedule help session appointments as early as possible. A high volume of requests close to the ...
0.00219842652 |
a/69361
notes20180522
and on-site parking demand counts during weekday periods, calculating the parking demand that could result from the ...
0.00219842652 |
a/76640
notes20180522_1
and on-site parking demand counts during weekday periods, calculating the parking demand that could result from the ...
0.00219842652 |
a/76641
2021-community-safety-capacity-building-rfp_finalv2
volume of requests close to the application deadline will result in limited availability of the technical advisors. Should ...
0.00219842652 |
a/69362
ebcxfaqs
monitoring, testing and analysis expertise needed to uncover problems and select cost-effective solutions. These providers also offer an ...
0.00219842652 |
a/50799
tilikumpl
todevote much of his career to northwest history, Indians and pioneers for which he re-received an award in 1960 from the Seattle Historical ...
0.00219842652 |
a/141244
center
for the replacement of the Flag Pavilion, with a new Festival Pavilion and adjacent open spaceadditions to the Seattle Center campus, was ...
0.00219842652 |
a/60381
1924proposedcipoverview
, FAS implemented a Citywide requirement on all public work bids and contracts above $300,000 called the “Public Works WMBE ...
0.00219842652 |
a/63072
2021_q1_report(0)
by $2.2M. • Program #20, Intelligent Transportation System Improvements, missed its spending target by $1.3M in Q1. Advertisements for ...
0.00219842652 |
a/99575
2021_q1_report
by $2.2M. • Program #20, Intelligent Transportation System Improvements, missed its spending target by $1.3M in Q1. Advertisements for ...
0.00219842652 |
a/99576
overview
address contracting equity for minority‐ and women‐ owned businesses. In 2011, FAS implemented a Citywide requirement on all public work 
0.00219842652 |
a/63142
seattledesigncommission-2008.12.04southeastseattletransportations ...
determine the direct results. What other factors are considered? In terms of modeling for the future, there will be a ...
0.00219842652 |
a/85460
2021levydeliveryplan_0223_2021
* 5-92021 accomplishments reflect current project schedules. The BMP Implementation Plan’s 2020 projects included some deliverables that are ...
0.00219842652 |
a/99571
seattledesigncommission-2006.11.02mercercorridorminutes
are currently under construction and renovation. 3 major trail projects are going to bid next year, of which this is one, ...
0.00219842652 |
a/85390
fta-dbe-goal-setting-methodology-2015-2016
assigned to each NAICS code. Then, for each NAICS code, the percentage of relative DBE availability was multiplied by the corresponding ...
0.00219842652 |
a/59001
2021-07-21_annexiv.eop.signed
through ESFs into an area after an incident has occurred or in anticipation of an approaching incident or event that is expected to cause a ...
0.00219842652 |
a/57064
spl_2328cip
roof and mechanical system replacement bid came in several hundred thousand dollars over estimates due to higher cost of ...
0.00219842652 |
a/138623
seattledesigncommission-2019.06.06_sr520roanokelidportagebaybridg ...
-build contract. The proposed concepts will include design elements and principles that will be embedded in WSDOT’s request for proposals ...
0.00219842652 |
a/85968