Filter Results

1726 to 1750 of 1936
sfab_agenda_20170516
. Announcements and Chair’s Report Johan Hellman, Chair 9:40 5. Duwamish MIC Discussion Dave Ghering 10:10 6. Freight ...
0.00177540432 |
a/101724
2013annualreport_web
the Bicycle Master Plan; development of a Freight Master ...
0.00177540432 |
a/54532
september 2021 sbab minutes
are weaving between cars. I recommend checking the street out at around 4:30pm on a weekday. It is somewhat of a shame that fixing these two ...
0.00177540432 |
a/100677
desrpt_swedish_club(0)
accessing the lower kitchen area. A small non-original storage shed is located adjacent to the sidewalk at the building’s northwestern ...
0.00177540432 |
a/76341
desrpt_swedish_club
accessing the lower kitchen area. A small non-original storage shed is located adjacent to the sidewalk at the building’s northwestern ...
0.00177540432 |
a/76342
appendix
Ave N/N 110th St/N 145th StTC366760Bike Master Plan ImplementationThis program will install bike lanes and ...
0.00177540432 |
a/61796
2016_accomplishments_spending
) and neighborhood greenway installations. For PBLs – bike lane installations were briefly put on hold in 2016 while SDOT worked with the ...
0.00177540432 |
a/99512
2018_0130_sdotfauntleroy_final
was formally adopted by the Seattle Department of Transportation (SDOT) and the Seattle Department of Planning and ...
0.00177540432 |
a/100543
2017_0315_project_folio_web
was formally adopted by the Seattle Department of Transportation (SDOT) and the Seattle Department of Planning and ...
0.00177540432 |
a/100539
2018_0725_sdotfauntleroy_folio
was formally adopted by the Seattle Department of Transportation (SDOT) and the Seattle Department of Planning and ...
0.00177540432 |
a/100544
52915sbabmoveseattlecomments
Plan, the Seattle BicycleAdvisory Board is reviewing the proposed Move Seattle Levy. We understand theimportance of this ...
0.001775061 |
a/107008
meeting2notes
in the ‘Industrial Areas Access Study’ as well as the ‘Freight Masterplan.’ Kevin O’Neill provided information about the ...
0.001775061 |
a/86755
desrptwindhamapartments
by an automatic electric freight elevator and will be heated by a hot water heating system utilizing oil for fuel." The ...
0.001775061 |
a/76316
windham-apartments-designation
will be served by an automatic electric freight elevator and will be heated by a hot water heating system utilizing oil for ...
0.001775061 |
a/76593
guiding principles
will be key to the Arena’s success. • The redevelopment should fit within the existing neighborhood and recognize the priorities outlined by ...
0.001775061 |
a/56247
7g.-transit-systems-and-services-in-seattle
Comprehensive Plan (page 3.9), states that “providing convenient and accessible transit service can help reduce reliance on ...
0.001775061 |
a/53336
lpb7-21-21
was entered on the University Street side. He noted the bas relief sculptural elements. He continued with the development of the hospital ...
0.001775061 |
a/74686
appendix_augfinal
and incorporated into the transit volume estimates include planned RapidRide routes and Metro Connects service investments ...
0.001775061 |
a/103056
2018_0201_bgt_dac_meeting9_summary_final
million → PMP/New Sidewalks – $1 million → BMP/Bike Master Plan – $0.2 million → Vision Zero – $0.2 ...
0.001775061 |
a/100380
desrpt_cassel_crag(0)
Stimson, Laura and Joshua Green, and now headquarters of the Washington Trust for Historic Preservation. For city planning ...
0.001775061 |
a/76328
desrpt_cassel_crag
Stimson, Laura and Joshua Green, and now headquarters of the Washington Trust for Historic Preservation. For city planning ...
0.001775061 |
a/76329
2018_0607_loc_presentation
:•New Sidewalks•Transit-Plus Multimodal Corridors•Bicycle Master Plan•Sidewalk Safety Repair •Curb Ramps & ...
0.001775061 |
a/99520
georgetownsouthpark_fact_sheet-khmer
ែរយៅកនាុងខផនការយមរបស់អនាកយ្មើរយជើង (Pedestrian Master Plan) ខផនការយមននការជិះកង់ (Bike ...
0.001775061 |
a/100555
georgetownsouthpark_fact_sheet-vietnamese
Master Plan), Kế hoạch Tổng thể Đường đi Xe đạp (Bike Master Plan), Kế ...
0.001775061 |
a/100557
levyfactsheet62915
and 60 miles of greenways, completing over half of the Bicycle Master Plan citywide network. Of the funds ...
0.00177487859 |
a/99258