Filter Results

1551 to 1575 of 3745
seattledesigncommission-2006.05.04arboretumjapanesegardenentryimp ...
Olson Nic Rossouw Dennis Ryan Darrell Vange Guillermo Romano Executive Director Layne Cubell, Senior Staff Department of ...
0.00216877833 |
a/85379
2017 2-9 bpc minutes approved
lies about the necessity of this expansion. We have a jewel. Architecture and landscape architecture is ...
0.00216877833 |
a/92174
draftingautocadreq
Electronic file and Layouts ...
0.00216877833 |
a/50796
595informationtechnology
/doit/ Department Overview The Department of Information Technology (DoIT) manages the City's information technology infrastructure and ...
0.00216865516 |
a/62044
doit_563_582
/ Department Overview The Department of Information Technology (DoIT) manages the City's information technology infrastructure and performs ...
0.00216865516 |
a/62095
sept222011approvedminutes
previously Public Health's representative on the Neighborhood Planning IDT. Commissioner Sarah Snider disclosed that her ...
0.00216865516 |
a/109151
seattledesigncommission-2002.05.02animalcontrolshelteradditionmin ...
project is below the threshold for LEED ™ certification, Fleets and Facilities plans to incorporate many sustainable ...
0.00216865516 |
a/85293
cleanenergyreport
Architectural Products, BC Lightyear Technologies Inc., BC Madrona Investments WANatural Resources Canada, CanNepal Capital ...
0.00216865516 |
a/56423
context-columbia-city
of significancewhich demonstrate the district’s eligibility under Criterion A. The district is also eligible under Criterion C (area of ...
0.0021685618 |
a/74334
psb5-6-15_minutes
/commercial kitchen to do their baking there. Coffee shop will be at street level. Mr. Hester asked if retail was ...
0.0021685618 |
a/73774
seattledesigncommission-2002.08.01highpointlibraryminutes
into an awkward form. It creates awkward plan relationships, problematic relationships with existing grade, and the team is ...
0.0021685618 |
a/85298
lpbminutes5-3-17
to the building and noted the loss of integrity. She said prior to the building’s construction a gas station occupied the site. She said ...
0.0021685618 |
a/75035
idminutes11-27-18
architecture; they plan to add wood at the front entry. Mr. Stevens said at the entry portal they will ...
0.0021685618 |
a/73109
lpbminutes8-2-17
cabling at mortar joints. He said they propose to light the building shaft with narrow beam spotlights that will enhance the ...
0.0021685618 |
a/75050
doit
information security policy and management, development of common standards and architectures, development of a multi-year ...
0.0021685618 |
a/62410
doit
, development of common standards and architectures, development of a multi-year strategic IT plan, and IT ...
0.0021685618 |
a/62482
fire-station-38-designation
of the community, city, state or nation. D. It embodies the distinctive visible characteristics of an architectural style, ...
0.00216847076 |
a/76381
lpbminutes9-18-19
affect the features or characteristics specified in Ordinance #106052, as the proposed work is compatible with the massing, size and scale ...
0.00216847076 |
a/75053
psb12-16-15_minutes
of the building ARC Report: Mr. Kralios reported that ARC reviewed plans and photos. Staff Report: I have met with the ...
0.00216847076 |
a/73753
lpbminutes11-6-19
if SDOT was involved. Mr. Layton said better lighting is planned. Sound Transit owns a portion of the alley. They are ...
0.00216847076 |
a/75008
lpb3-16-16_minutes
and visually to their location; that signs reflect the character and unique nature of the business; that signs do not hide, damage, or ...
0.00216847076 |
a/74655
lpbminutes_6-15-22
Request for an extension Nathan Rimmer requested a six-month extension and noted the plan to do a Board briefing July 20, ...
0.00216847076 |
a/133697
pspbminutes5-15-19
benches, add tables and chairs, add lighting ARC Report: The ARC reviewed the plans and product specifications provided. ...
0.00216847076 |
a/74074
lpbminutes_11-16-22
. He said the building embodies the distinctive characteristics of its early 20th century architectural period so meets ...
0.00216847076 |
a/139566
lpbminutes_2-15-23
. The whole heart cannot keep alive on either wills as a break and Shakespeare strike together. Cultures turned rotten when they part. He ...
0.00216847076 |
a/145874