You just searched for:
Search
Filter Results
1276 to 1300 of 1839
2016_spp_rfi_final
http://www.seattle.gov/documents/departments/ofe/fundingopportunities/rfis/ ...
included in Exhibit B. The site visit may also include gathering additional information requested by the RFI Panel. The ...
0.002206975 |
a/79074
readersguide_cip
http://www.seattle.gov/documents/departments/financedepartment/2429proposed ...
spending may occur on a project. As a result, Stage 1 project cost estimates/budgets are “Rough Order of Magnitude” ...
0.002206975 |
a/147690
reader'sguide
http://www.seattle.gov/documents/departments/financedepartment/2227adoptedc ...
may occur on a project. As a result, Stage 1 project cost estimates/budgets are “Rough Order of Magnitude” estimates based ...
0.002206975 |
a/127133
reader's guide
http://www.seattle.gov/documents/departments/financedepartment/2227proposed ...
spending may occur on a project. As a result, Stage 1 project cost estimates/budgets are “Rough Order of Magnitude” ...
0.002206975 |
a/63565
2024_auar_title_vi_report
http://www.seattle.gov/documents/departments/sdot/oeei/2024_auar/2024_auar_ ...
describe the frequency of contact with LEP persons for services or projects (e.g., customer service interactions, public meetings, and ...
0.002206975 |
a/171559
public hearing 02-12-2024
http://www.seattle.gov/documents/departments/tech/surveillance/2024 ...
lane and Dearborn in front of resulted in several staff cars. Being shot, there was a home for Asian elders and both. Cases ...
0.002206975 |
a/153142
fascip
http://www.seattle.gov/documents/departments/financedepartment/2025proposed ...
have brought unique challenges to contractors bidding on public work. These requirements, such as a community workforce agr ...
0.002206975 |
a/63257
fas
http://www.seattle.gov/documents/departments/financedepartment/2025adoptedc ...
unique challenges to contractors bidding on public work. These requirements, such as a community workforce agreement, susta ...
0.002206975 |
a/63239
sprcip
http://www.seattle.gov/documents/departments/financedepartment/2328proposed ...
, windows), electrical, plumbing, storm and sewer line replacement, and synthetic turf replacement. Improve Operating Efficiency: The ...
0.002206975 |
a/134215
fascip
http://www.seattle.gov/documents/departments/financedepartment/2126proposed ...
, architectural and engineering design, bid, permitting and construction ...
0.002206975 |
a/63413
2017-18_spp_rfi_final
http://www.seattle.gov/documents/departments/deel/fundingopportunities/rfis ...
by the RFI Panel. The results of the site visits will be shared with the RFI Panel and may be considered as part of the ...
0.002206975 |
a/55721
spr_2328cip
http://www.seattle.gov/documents/departments/financedepartment/2328adoptedc ...
line replacement, and synthetic turf replacement. Improve Operating Efficiency: The project will result in reduction of ...
0.002206975 |
a/138620
lpbcurrentnom_crescentapt
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
for defense industry workers and military families, in 1943 9,573 families applied for housing. As a result, 122 units were ...
0.002206975 |
a/74452
2024_0404_ike sdc presentation final presentation
http://www.seattle.gov/documents/departments/opcd/designcommission/ike ...
local events.CUSTOMIZABLE QUESTIONSSurvey Says allows a city to solicit feedback from the public. Results are available in ...
0.002206975 |
a/155159
lpb061825georgetownsteamplantpp
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
Page 2 of 9 OVERVIEW SCOPE OF WORK: PROVIDE PREFABRICATED MODULAR ALUMINUM ACCESS RAMPS AND STEPS 1. SUBMITTALS 1.1 Product Literature must ...
0.002206975 |
a/169844
lpb061825georgetownsteamplantpp
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
Page 2 of 9 OVERVIEW SCOPE OF WORK: PROVIDE PREFABRICATED MODULAR ALUMINUM ACCESS RAMPS AND STEPS 1. SUBMITTALS 1.1 Product Literature must ...
0.002206975 |
a/169833
lpb061325georgetownsteamplantpp
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
Page 2 of 9 OVERVIEW SCOPE OF WORK: PROVIDE PREFABRICATED MODULAR ALUMINUM ACCESS RAMPS AND STEPS 1. SUBMITTALS 1.1 Product Literature must ...
0.002206975 |
a/169657
156-preliminary_report9162014
http://www.seattle.gov/documents/departments/fas/realestateservices/propert ...
by public bid or request for proposal.Transfer of Jurisdiction to other City Department: No other City Department expressed ...
0.002206975 |
a/59136
lpbcurrentnom_golden_rule_dairy
http://www.seattle.gov/documents/departments/neighborhoods/historicpreserva ...
was a result of the streetcar line that operated on the street until Seattle’s streetcar system was dismantled in 1941 and ...
0.002206975 |
a/74475
sbp_meeting_summary_2019-12-13f
http://www.seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategi ...
events have increased over the past 5-10 years. • SPU Integrated System Plan – SPU believes thinking more regionally ...
0.002206975 |
a/112274
18atemporarydischarges
http://www.seattle.gov/documents/departments/spu/construction-resources/sta ...
, or as the result of the tides. Refer to Ground Water Quality Standards, Chapter 9 173-200 WAC. Permissible Discharge ...
0.002206975 |
a/154321
cos-bim-standards
http://www.seattle.gov/documents/departments/tech/bim/cos-bim-standards.pdf ...
is left to the end of the project, often resulting in mistakes and schedule delays.•Shortcuts are taken to save time, ...
0.002206975 |
a/139344
spu_water_overview
http://www.seattle.gov/documents/departments/financedepartment/0914adoptedc ...
reduced in part because the construction bid was lower than the Engineer's estimate. This resulted in a ...
0.002205884 |
a/61473
water_narrative
http://www.seattle.gov/documents/departments/financedepartment/0914proposed ...
level by approximately $534,000. In 2009 the West Seattle Reservoir Covering project costs were reduced in part because the construction ...
0.002205884 |
a/61540
ethicscoderevsec1
http://www.seattle.gov/documents/departments/ethicselections/agendas and ...
shall not apply to any contract awarded through the public bid process in accordance with applicable law. 2 Issues ...
0.002205884 |
a/130795