Filter Results

1251 to 1275 of 1652
firefuel
an event in any park for which a permit is required by this chapter or by rules of the Superintendent without first ...
0.00214708922 |
a/92720
07.16.2020-ddr2020-13treeprotection
of the proposed location of structures, access, utilities and a consideration of the intensity and location of land disturbance activities ...
0.00214708922 |
a/118958
phase1summaryofchangestoproposedamendments
. Original proposal. The draft proposal was to limit the size of a lot permitted for new development to a maximum of ...
0.00214489433 |
a/87321
mo arena at seattle center mou ord
; 22 Anthony Auriemma MO Arena at Seattle Center MOU ORD D2 Template last revised December 1, 2016 4 C. Provide for design, ...
0.00214489433 |
a/56248
masterplan1
system. This park should not be asked to serve too many functions. It will best serve this city if it is permitted to ...
0.00214489433 |
a/92264
harvardbelmont-guidelines
Board, is requiredprior to the issuance of any city building, demolition, street use, or other permits for ...
0.00214489433 |
a/72898
mhc6-8-16_minutes
is in Zone 3, street 2 level, all uses permitted. No existing use approved for this space. Existing use approval: ...
0.00214489433 |
a/73431
annualreportjuly2013june 2014
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.00214489433 |
a/77158
annualreportjuly2014june2015
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.00214489433 |
a/77159
tmpreportjuly2015june2015
Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, 2011 the ...
0.00214489433 |
a/77244
overview
Center Master Plan in May 1999. The Planconsists of the following: demolition of the existing Municipal and Public Safety ...
0.00214489433 |
a/60370
notes20181107
through several reviews before it was put on hold. The approvals that were obtained earlier were the City Council approval for alley ...
0.00214489433 |
a/77637
context-neighborhood-commercial-properties
(Attachment C) was completed. This form included contextual information,building description and building history based on ...
0.00214489433 |
a/74340
feisscoping-2013-07-01
runoff (quality, quantity) • Noise (short term impacts from site preparation, demolition and construction activity) • ...
0.00214489433 |
a/77393
draft plan housing element
and economic needs of the surrounding neighborhood.  H5.11 Require advance notice to tenants and payment of relocation assistance to extreme ...
0.00214489433 |
a/87413
dr-annie-russell-house-designation
No permit records have been located, but several alterations have been made over the years. • In the 1970s a small ...
0.00214489433 |
a/76353
desrptdrannierussellhouse
reportedly used to sneak many of Dr. Russell’s patients into the house. Just north of the staircase is a large storage room. The final ...
0.00214489433 |
a/75977
solid-waste-moodys-2015
issued nearly $170 million of its $200 million of total debt within the last five years. Theseborrowings have financed the ...
0.00214489433 |
a/107433
notes20161115
plan that requires a Master Use Permit (MUP). The Citizen’s Advisory Committee (CAC), on the other hand, is formed to ...
0.00214489433 |
a/76864
lpb-minutes-01-21-15
finished up design review and that the MUP will be complete March 18. Ms. Sodt explained that they are working on completing Certificate of ...
0.00214489433 |
a/74368
lpb-01-21-15-minutes
finished up design review and that the MUP will be complete March 18. Ms. Sodt explained that they are working on completing Certificate of ...
0.00214489433 |
a/74606
notes08072017
the college would like to accomplish. Mr. Ernevad noted that one of the top priorities is the demolition of the north ...
0.00214489433 |
a/76990
spu sac 112918 minutes final
building that was destroyed, which was occupied by Gascoigne Lumber. Gascoigne Lumber and the University partnered with an environmental ...
0.00214489433 |
a/77203
desrptpier59
and the piers structural support system were repaired as necessary and strengthened to accommodate anticipated loading. Changes to the pier ...
0.00214489433 |
a/76207
mhc082323sr
business. To be operated by Pig & Pine Books LLC owned by Tiffany Brost (100%). Additional information: • Zone 1, below street level, ...
0.00214489433 |
a/145618