Filter Results

901 to 925 of 11044
transportation_projects
interconnects and upgrades three signalized intersections, provides new traffic controllers, and adds emergency vehicle ...
0.003074537 |
a/61290
transportation_projects
interconnects and upgrades three signalized intersections, provides new traffic controllers, and adds emergency vehicle ...
0.003074537 |
a/61348
sdot
operation of the City's movable bridges, traffic signals, street cleaning, pothole repairs, permit issuance, tree ...
0.003074537 |
a/62249
march2014outreachsummary
and the possible extension of the 39th Avenue NE neighborhood greenway. The meeting was held at Thornton Creek School. Display boards and a ...
0.003074537 |
a/102091
sdotcap
of the Bike and Transit Master Plans; investments to facilitate freight mobility; traffic cameras and signals; bridge ...
0.003074537 |
a/62909
transportation
of the Bike and Transit Master Plans; investments to facilitate freight mobility; traffic cameras and signals; bridge ...
0.003074537 |
a/62919
sdot
, • 122 bridges, • 509 stairways, • 614 retaining walls, • 22 miles of seawalls, • 158 traffic cameras, • 1,061 ...
0.003074537 |
a/62524
binmic-plan
property with environmentalprotection.IFREIGHT MOBIUI’Y AND TRANSPORTATION POLICIES (Page 11)1st bullet, change to readStrive to improve ...
0.003074537 |
a/78390
queen-anne-matrix
and traffic flow. The preliminary route forthe Key Landscaped Streets has been identified as follows and will berefined ...
0.00307379663 |
a/78378
23rdavenueactionplanvisioningsurveyresults
, and housingcenters. They need more storefront businesses, more height & density, more pedestrian traffic for alivable str ...
0.00307379663 |
a/86201
05-10_proposed_cip_sdot_project_detail
:This project interconnects and upgrades three signalized intersections, provides new traffic controllers and adds ...
0.00307379663 |
a/60854
05-10_sdot_adopted_project_detail_final
:This project interconnects and upgrades three signalized intersections, provides new traffic controllers and adds ...
0.00307379663 |
a/60794
q3 2020 cto quarterly surveillance technology determination ...
of recruit firefighters. DOT 2651 Active ITS: Incident Management Software SDOT has reviewed several software vendors with competing ...
0.00307379663 |
a/117350
spu_mimp_annual_report_july_2019-june 2020
by traffic and pedestrian calming measures. However, it is possible that during the long time-span of the MIMP, one or ...
0.00307379663 |
a/77234
sdot
stairways,•614 retaining walls,•22 miles of seawalls,•158 traffic cameras,•1,061 signalized intersections,•47 miles of bike ...
0.00307379663 |
a/62451
h line sepa checklist signed
, Seattle Department of Transportation, March 2017  Delridge Way RapidRide Stop Consolidation Analysis, Seattle Department of ...
0.00307379663 |
a/106029
annualreportjuly2018june2019
to improve pedestrian safety. Existing pedestrian safety problems involving multiple crossings of West Bertona Street are proposed to be ...
0.00307304761 |
a/77162
spu_mimp_annual_report_july_2020-june_2021
pedestrian safety. Existing pedestrian safety problems involving multiple crossings of West Bertona Street are proposed to be addressed by ...
0.00307304761 |
a/77235
transportation
, upgrading, and monitoring the use of the City’s system of streets, bridges, retaining walls, seawalls, bicycle and pedestrian facilities, ...
0.00307304761 |
a/61533
transportation
, upgrading, and monitoring the use of the City’s system of streets, bridges, retaining walls, seawalls, bicycle and pedestrian facilities, ...
0.00307304761 |
a/61478
annualreportjuly2017june2018
to improve pedestrian safety. Existing pedestrian safety problems involving multiple crossings of West Bertona Street are proposed to be ...
0.00307304761 |
a/77161
q4 2020 cto quarterly surveillance technology determination ...
documents from your email, by taking a picture on your phone, or through cloud storage services like Dropbox. DOT 2950 ...
0.00307304761 |
a/117352
sdot
of non-arterial streets; • 2,293 miles of sidewalks; • 124 bridges; • 502 stairways; • 613 retaining walls; • 22 miles of seawalls; • 267 ...
0.00307304761 |
a/63321
mayorsrecommendedordinance
; maintain a compatible scale within an area; minimize traffic congestion and enhance the streetscape and pedestrian ...
0.00307304761 |
a/87998
seattleindustrialfeisch3.13
duties include foot, car, and bike patrols, harbor patrols, 911 calls, investigations, traffic enforcement, parking ...
0.00307304761 |
a/134527
Previous 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 Next