Filter Results

8851 to 8875 of 14950
westlakehubstrategydraftrecommendations
mezzanine (existing)Retail-Based Entranceto station mezzanine (existing)Traffic Calming (with special roadway surface)Third ...
0.00310286274 |
a/101641
2020.01.08_spabsbab combined - vz presentation
improvementsDepartment of TransportationProactive Actions: LPI’s Leading Pedestrian Intervals (LPIs)•LPIs give pedestrians ‘walk’ signal ...
0.00310286274 |
a/98948
2020.01.08_spabsbab combined_vz presentation
improvementsDepartment of TransportationProactive Actions: LPI’s Leading Pedestrian Intervals (LPIs)•LPIs give pedestrians ‘walk’ signal ...
0.00310286274 |
a/99926
2016066
2016066 2016-66: REIMAGINING NE 85TH ST | 1 Reimagining NE 85th StreetSegment of NE 85th St from the east property boundary of Sedona ...
0.00310286274 |
a/103125
seattle_webinar_how-to-best-prep-for-your-project_researching-wha ...
streets and pavement moratoriums•Traffic Control Plans Map▪Base map for traffic control plans•Compliant ...
0.00310286274 |
a/174346
2016060
2016060 2016-60 & 2016-72: GOLDEN GARDENS DRIVE SIDEWALK | 1 Golden Gardens Drive SidewalkAlong the east side of 32nd Ave NW/Golden ...
0.00310286274 |
a/103120
seattle city light 2022 pos
courts of limited jurisdiction. The Seattle Municipal Court has limited jurisdiction over a variety of cases, including misdemeanor ...
0.00310286274 |
a/129751
2016046
and parking occurs on both sides of the street. There is an existing traffic circle for traffic calming at ...
0.00310286274 |
a/103115
whatsupnextintheseattlesqueeze_tab_march2019
transportation system and ROWDepartment of Transportation•Revise traffic signal timing operations when buses come out of ...
0.00310286274 |
a/117718
navigationteamreportingplan110717
with encampment removal and cleanup, such as trash removal, compliance monitoring by the Seattle Office of Civil Rights, and SPD overtime ...
0.00310286274 |
a/50602
1-0summary121814
, it was deemed infeasible to provide additional roadway and intersection capacity beyond what is currently planned to reduce impacts to ...
0.00310286274 |
a/87750
2017 permitted encampment evaluation
contribute to some negative public perception of the encampments. Further study is recommended to evaluate the level and impact of the foot ...
0.00310286274 |
a/69067
sectionsudistrictdrafteis1-0summary
. ALTERNATIVES3. ANALYSIS4. REFERENCESAPPENDICESplanned to reduce impacts to traffic congestion (which affects transit) and ...
0.00310286274 |
a/87796
seattle city light 2022 os
. The Seattle Municipal Court has limited jurisdiction over a variety of cases, including misdemeanor criminal cases, ...
0.00310286274 |
a/131003
bbps_outreachsummary_octobernovember_final
NW 18% Least Important Considerations from Online Open House Survey Traffic and congestion 42% Visual impacts and bridge ...
0.00310286274 |
a/100905
auditofdisciplinarysystemforspdswornpersonnel
hours of voluntary overtime shifts with the Traffic Unit on the same days they served a suspension.SPD does not appear to ...
0.00310286274 |
a/79149
don2017_annualreport
Historic Resources Inventory of University of Washington campus.       ANNUAL REPORT 2017 ...
0.00310286274 |
a/78511
seattle city light 2022 os with errata notice
criminal cases, traffic and parking infractions, collection of fines, violation of no-contact or domestic violence ...
0.00310286274 |
a/131376
seattle-solid-waste-os-2014
station was demolished in January 2014 and the new North Transfer Station is currently under construction. The old south-end transfer ...
0.00310286274 |
a/58561
seattle-solid-waste-os-2014
station was demolished in January 2014 and the new North Transfer Station is currently under construction. The old south-end transfer ...
0.00310286274 |
a/107412
duw_highlandparktreewalk
our streets friendlier places to walk and bike - Soaking up rainwater to keep our streams, lakes, and Puget Sound clean - Calming ...
0.00310286274 |
a/117753
magqa_treesofqueenannetw_leg2
communities by: - Making our streets friendlier places to walk and bike - Soaking up rainwater to keep our streams, lakes, and Puget Sound ...
0.00310286274 |
a/117764
ose_tua_mv_report_2020
exhaust fans to high-traffic hours only. Confirm AHU-1 satisfies 24/7 call-center operation on Level 5, and if so, schedule ...
0.00310286274 |
a/88543
montlakefactsheet_nov2016
. We expect construction will begin in mid-2017. Improvements include:Sidewalk restoration to improve walking connections on 19th Ave E and ...
0.00310286274 |
a/105086
ctr_program_performance_report_2022
, AND TRIPS154 of the 250 sites participating in the CTR program are also affected by Transportation Management Program (TMP) requirements. ...
0.00310286274 |
a/158570