Filter Results

8626 to 8650 of 11414
2016opa-1222ccs04-11-17
attached to their persons with a remote start button for the ICV on the microphone. When Named Employee #1 and Named Employee #2 heard the ...
0.003019525 |
a/81631
permitcond_7912-odmf
lights in operation. Mobile fueling vehicles shall not obstruct emergency vehicle access roads. (SFC 5707.6) 7. Mobile fueling vehicles ...
0.003019525 |
a/127047
psb011724boatlandsr
historical and cultural significance. Further, the regional sports stadiums, constructed in and near the Pioneer Square area, and the ...
0.003019525 |
a/151653
6j. 17-675, linden & n 77th
Design Contingency (10% of Design Phase Subtotal) $ 1,400 Total Design Phase Costs $ 15,400 Construction Phase Construction Costs (include ...
0.003019525 |
a/78142
6j. 17-675, linden and n 77th
Design Contingency (10% of Design Phase Subtotal) $ 1,400 Total Design Phase Costs $ 15,400 Construction Phase Construction Costs (include ...
0.003019525 |
a/78143
neighborhoodstreetfundpastprojects07-15
Eastlake Sidewalk E Newton St between Franklin Ave E and Eastlake Ave E $190,000 Central Jackson Place Traffic Calming 18th ...
0.003019525 |
a/103178
23rdavevz_potholingnotice_november2019
efforts to reach zero traffic deaths and serious injuries by 2030. Segment 1 was completed in 2018 and Segment 2 will go ...
0.003019525 |
a/106692
public guide_2013
appellant group might be: a neighbor who gives information about traffic conditions in the neighborhood and the results of ...
0.003019525 |
a/65220
2020opa-0691ccs050921
Code of Washington, which, for example, allow officers to drive outside of normal traffic patterns for legitimate law ...
0.003019525 |
a/83469
albuquerque_settlement_agreement
is the subject of a protective or restraining order; f) all vehicle pursuits and traffic collisions involving APD ...
0.003019525 |
a/52303
arts_and_cultural_affairs_
Decrease budget by $95,000, abrogate 0.96 FTE Parking and Traffic Coordinator position, and reduce intermittent staff as ...
0.003019525 |
a/61769
2019 suip district 3 projects
AVEYVYC 2019 - 29th Ave Leschi traffic calmingTRUE2019 SUIP Plans District 39Start DateEnd DateAgency NameOn StreetProject ...
0.003019525 |
a/105837
outreach_landers_relocation
South and 4th Avenue South (please see map on reverse) What you can expect  Signs and traffic control flaggers will ...
0.003019525 |
a/100934
2020opa-0723ccs071221
investigation, criminal traffic citation, arrest, or conviction.” The reporting must occur as soon as practical. (SPD ...
0.003019525 |
a/83487
sbab eastlake rapidride j bike lanes_nov 2021
of protection on the 1.5 blocks between Harvard and the bridge that the southern portion of Eastlake receives. If you are unable to create a ...
0.003019525 |
a/100670
seattledesigncommission-2003.08.21seattlecentertheatercommonsminu ...
there is increased traffic pressure on Madison St. ƒ Proponents reiterated that this alley dead-ends to the west and does ...
0.003019525 |
a/85322
2020opa-0330ccs122220
off one-way streets so that groups of marching protesters did not turn down them against the flow of traffic, causing ...
0.003019525 |
a/83257
nsngw_construction_notice_100th.aurora_dec2018_updated-1
nsngw_construction_notice_100th.aurora_dec2018_updated-1 January 2019 Construction at N 100th St and Aurora Ave N will resume as early as ...
0.003019525 |
a/102140
uwmc_nw_campus_dac_minutes_meeting 11
concept, these ideas trying to capture ideas coming up 39:37 Review of Traffic, Parking, Access, and Circulation • ...
0.003019525 |
a/154590
summerupdatecid_interactive_eng
from $1 to $2.25 with a Good To Go! pass. WSDOT is giving away free Good To Go! passes at 99tunnel.com. Plan ahead for when tolling starts ...
0.003019525 |
a/78536
notes-2013-07-18(0)
it will eventually lead to an increase noise, traffic, and congestion. She had negative experiences with retail at other ...
0.003019525 |
a/77426
january 2022 spab minutes
:oWe have three main pillars to our permanent design: providing public space, shifting priorityto people walking and biking, and changing ...
0.003019525 |
a/132408
pumpstation38-faq-update-7.5.22
features. During construction, residents in the area can expect: • Construction noise, dirt, dust, and vibration • Slowed vehicle ...
0.003019525 |
a/131022
sli_20-1-a-1_intial_response_report1
March 31, 2016 SLI 20-1-A-1 included crossing improvements like rapid flashing beacons and curb bulbs, traffic calming ...
0.003019525 |
a/72482
npdes-43a-structuralstormwatercontrolstable
acres of EIA at one site. This project will also provide traffic calming in priority areas for SDOT and the community. ...
0.003019525 |
a/142282