Filter Results

826 to 850 of 12073
ose director's report
Permitting fees tied to efficiency  Land use incentives for deep efficiency  Incentivize waste heat utilization  ...
0.00230919942 |
a/88450
sdot safe start ord d4_sepa
building premises. The permit program adapted from its existing permit structure to 26 ...
0.00230919942 |
a/131922
oneseattleplanfeis-chapter3.6-landuse
and energy efficient, low-carbon, green building techniques—such as the City’s green building ...
0.002309145 |
a/165725
desrpt_1101epike
the freight elevator overrun space and an exit stairway. The building is listed on the City of Seattle’s list of ...
0.00230878661 |
a/76323
treeregsconstituentemailsthrough103019
06/28/19 6718865-CN Construction Permit Preliminary Assessment Report 70 KB 03/07/19 001007-19PA ...
0.00230861572 |
a/119477
vol 3_b_bgt_feis_tech_appendix_b_web_lowrez
CHAPTER 1 Introduction to the Project ............................................................................................ 1-1 1.1 ...
0.00230844063 |
a/100533
2seattle2015swmp203272015011637.pdf
the project will require, and what the permit process will entail. If the project is a multifamily or commercial ...
0.00230824947 |
a/112736
draft eis_spu draft mimp_appendices_a-f
draft eis_spu draft mimp_appendices_a-f DRAFT ENVIRONMENTAL IMPACT STATEMENT APPENDICES for the SEATTLE PACIFIC UNIVERSITY Major Institution ...
0.00230806554 |
a/145270
1032_prop_rpt
unobserved. 3.5 DOCUMENTED BUILDING ALTERATIONS Permits for the subject buildings were ...
0.002307907 |
a/73288
062723_1032jacksonhistpropr
spaces were unobserved. 3.5 DOCUMENTED BUILDING ALTERATIONS Permits for the subject ...
0.002307907 |
a/143711
laquinta_nomination_application
are not known are identified by ranges based on available background information. (Figures 158-162) 1950 Work included construction of the ...
0.002307907 |
a/75307
lpbcurrentnom_laquinta
are identified by ranges based on available background information. (Figures 158-162) 1950 Work included construction of the detached ...
0.002307907 |
a/74492
2designforpermittingenvreviewfinalredacted
Agency RCW Revised Code of Washington RHA Rivers and Harbors Act ROW right-of-way RUP Revocable Use Permit SAC SEPA ...
0.00230779429 |
a/154258
2014stormwatermanagementprogram
will require, and what the permit process will entail. If the project is a multifamily or commercial ...
0.00230768463 |
a/112680
beps_stakeholder_engagement_summary_05.30.23
. 17. Projects in Progress. Buildings now in the permit process may not be delivered for several years, ...
0.00230756216 |
a/142270
2010_proposed_budget
commercial activity and efforts to conserve by residents. The Department of Planning and Development (DPD), which relies on ...
0.00230748835 |
a/61757
sdcirecommendationnov2017
% reviewed biannually. If the University does not achieve 18% SOV campus trips by 2022, 16% by 2024, 14% by 2026, and 12% by 2028, master ...
0.00230708718 |
a/77860
ose_directors_rule_2016-01
of Occupancy (C of O) – a certificate issued by the Seattle Department of Construction and Inspections (SDCI) after final inspection of ...
0.0023069398 |
a/57447
ose_directors_rule_2016-01
of Occupancy (C of O) – a certificate issued by the Seattle Department of Construction and Inspections (SDCI) after final inspection of ...
0.0023069398 |
a/88466
2009src
walls.i.See Table R611.3 for tolerance from nominal thickness permitted for flat walls.j.DR means design is required in ...
0.00230686925 |
a/97768
desrpteitelbuilding
could not be surveyed. Date Architect Description 1904 Move brick building from address to 2318 6th Ave. ...
0.0023067 |
a/75991
ellsworth-cottages-designation-nomination
of the interior spaces could not be surveyed. Date Architect Description 1904 Move brick building from address to 2318 ...
0.0023067 |
a/76362
seattle_2019_stormwater_plan
, what development standards apply, what types of permits the project will require, and what the permit ...
0.00230662338 |
a/113492
2018stormwatermanagementplan
with applicable adopted codes, and the building permit is issued when the plans comply with these codes ...
0.00230653072 |
a/112728
2009-2014_adopted_cip_book
East Internet Center in Tukwila from the Creston-Nelson Substation. The customer pays for this feeder. The project includes design, ...
0.002306521 |
a/61424
Previous 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 Next