Filter Results

6826 to 6850 of 14988
b2d_finalreport 05-16-14
of this study will inform futuredecisions regarding mode, alignment and implementation responsibilities to be included in ...
0.00222079945 |
a/99400
sample_documentation_1
was established November 8, 2018 that included all required information, 1) the ability to submit comments, 2) the ability ...
0.00222079945 |
a/78661
buildingelectrificationstrategy
unintended consequences. Throughout 2022 and 2023, City Light developed this strategy, which was informed by listening ...
0.00222079945 |
a/152234
lpb100224woodinhousepp
, Seattle19372023Presented by: Sarah J. Martin, historian – SJM Cultural Resource Services2AcknowledgementsScott Boone, ...
0.00222079945 |
a/160910
lpb010423pioneerpp
: December 21st, 20228ARC SUMMARY | Standards of RehabilitationSecretary of Interior Standards for Rehabilitation1. A ...
0.00222079945 |
a/137111
2_alternatives_mha_deis_2017
environmental information. The Seattle 2035 Final EIS found a significant unavoidable adverse impact in the area of ...
0.00222079945 |
a/64999
lpbcurrentnom_1915 3rd ave seattle landmarks nomination
of retail, restaurant, parking, and commercial properties, several of which have residential units on upper floors (Figures ...
0.00222079945 |
a/74404
lpb051822_fp_nom
the nomination in 2020. The NRHP nomination for Freeway Park has informed the Seattle Landmarks nomination.3 3 Chrisanne ...
0.00222079945 |
a/128196
lpbcurrentnom_freeway_park
the nomination in 2020. The NRHP nomination for Freeway Park has informed the Seattle Landmarks nomination.3 3 Chrisanne ...
0.00222079945 |
a/127374
thomas green street concept plan
. Streetscape Concept Plans define a vision that can be implemented over time, ei-ther with adjacent new development or through direct ...
0.00222079945 |
a/106657
thomas-green-street-concept-plan
. Streetscape Concept Plans define a vision that can be implemented over time, ei-ther with adjacent new development or through direct ...
0.00222079945 |
a/128915
802_16thave_nomination_application
offices for Glassman. In 1988, after Glassman moved his practice out of 802 and Ventura got divorced, the two decided to sell the ...
0.00222079945 |
a/75102
lpbcurrentnom_802_16
for Glassman. In 1988, after Glassman moved his practice out of 802 and Ventura got divorced, the two decided to sell the ...
0.00222079945 |
a/74411
lpbcurrentnom_viewlands_elementary
.............................................................................................................................. 1 1.2 ...
0.00222079945 |
a/75356
lpbcurrentnom_viewlands_elementary
.............................................................................................................................. 1 1.2 ...
0.00222079945 |
a/74567
isrd062822_blossom_pres
, LLCARCHITECT:LINK DESIGN GROUP, LLC2Blossom Apartments 214 - 220 5th Ave. S, Seattle - Certificate of Approval Package 06.28.2022ADDRESS ...
0.00222079945 |
a/129861
heliconreport
in January 2009. A list of the people interviewed and the interview protocol are attached as an appendix. This report reviews the findings ...
0.00222079945 |
a/49560
seattle energy benchmarking analysis 2016 for web
data to date. Seattle updated the benchmarking ordinance in 2016 to make reported data publicly available so that key ...
0.00222079945 |
a/88488
sw-310_code-of-conduct-for-patrons-of-transfer-stations
, and any real property or facilities owned, operated, or under its jurisdiction. Criminal Trespass. The unlawful entry or ...
0.00222079945 |
a/177687
impact fees-sepa checklist-final
of a fee schedule, estimates for growth in trips on the transportation network would be based on growth estimates for Seattle 2035. 8. ...
0.00222079945 |
a/53528
desrptfirestation38
desrptfirestation38 REPORT ON DESIGNATION LPB 19/05 Name and Address of Property: Seattle Fire Station #38 5503 33rd ...
0.00222079945 |
a/76030
desrptcocacolabottlingplant
desrptcocacolabottlingplant REPORT ON DESIGNATION LPB ...
0.00222079945 |
a/75950
adrule34.02.07
, the property owner or operator may have other obligations, including but not limited to, spill or leak reporting Seattle ...
0.002220046 |
a/64115
2008_adopted_slis
, by June 30, 2008 on the development of this program, including information on curriculum, how often and to which ...
0.002220046 |
a/61353
approvedjuly11minutes
: • The Interbay Armory site, a 25-acre property within the Ballard Interbay Northend Manufacturing Industrial Center ...
0.002220046 |
a/108330