Filter Results

6651 to 6675 of 11414
yvyc2019district5ballot
and 121st Cost: $109,000 5D. LAKE CITY * 19-184: Crossing Improvements on 123rd St and 35th Ave NE Cost: $17,600 5G. LICTON SPRINGS ...
0.00302357 |
a/78218
smc_2324adopted_mid-biennium
smc_2324adopted_mid-biennium              Seattle Municipal Court The Honorable Faye R. Chess, Presiding Judge (206) 684‐5600 ...
0.00302357 |
a/153255
kenyonways_diagram_circulation
kenyonways_diagram_circulation NWing Luke Elementary School39TH AVE SM L KING JR WAY S37TH AVE S38TH AVE SS KENYON STKENYON WAY SS THISTLE ...
0.00302357 |
a/126971
littlesaigon_trafficchanges_factsheet
crashes at S Weller St and 12th Ave S involved people walking and biking. To meet our Vison Zero goal of reaching zero ...
0.00302357 |
a/102087
2012seattlefirechapter9
in accordance with Section 907.5.2.2.Exceptions:1.Airport traffic control towers in accordance withSection 907.2.22 and ...
0.00302357 |
a/97616
2019_0723_greenlakeprogram_fs_gll
Lake Way N at NE Ravenna Blvd and NE 71st St: Squaring up the intersections as much as possible by adding curb bulbs and widening the west ...
0.00302357 |
a/102962
skenyon_map2
skenyon_map2 NWing Luke Elementary School39TH AVE SM L KING JR WAY S37TH AVE S38TH AVE SS KENYON STKENYON WAY SS THISTLE STS ROSE STS KENYON ...
0.00302357 |
a/127294
kenyonways_diagram_circulation_final
kenyonways_diagram_circulation_final NWing Luke Elementary School39TH AVE SM L KING JR WAY S37TH AVE S38TH AVE SS KENYON STKENYON WAY SS ...
0.00302357 |
a/137064
finalreport2013
on traffic, noise, circulation and parking in the area; and (5) Impacts on housing and open space. b. Need for Departure ...
0.00302357 |
a/76626
oneseattleplanphase1engagementreport
Seattle LGBTQ Commission Board of Parks and Recreation Commission Seattle Pedestrian Advisory Board Seattle Planning Commission Seattle ...
0.00302357 |
a/132344
oneseattleplan-phase1engagementreport
Seattle LGBTQ Commission Board of Parks and Recreation Commission Seattle Pedestrian Advisory Board Seattle Planning Commission Seattle ...
0.00302357 |
a/133681
19culturerecreation
and Recreation, a new park space will be created for the Ballard neighborhood. The Park Boulevard will provide usable park space while ...
0.00302357 |
a/61967
19artsculturerecreation
of Parks and Recreation, a new park space will be created for the Ballard neighborhood. The Park Boulevard will provide usable park space ...
0.00302357 |
a/61966
fg
361,855 School Safety Traffic and Pedestrian Improvement Fund 0 409,801 850,000 800,000 Total 2QA00 71,169,027 69,295,652 ...
0.00302357 |
a/62756
btgannualreport2010-final
52 pedestrian crossing improvements, replaced 7,544 regulatory signs, completed 290 bridge repair requests, installed 2,023 linear feet of ...
0.00302357 |
a/99106
btgannualreport2010-final
52 pedestrian crossing improvements, replaced 7,544 regulatory signs, completed 290 bridge repair requests, installed 2,023 linear feet of ...
0.00302357 |
a/99412
chapter42watershedmanagement
zone to intercept the material. An additional source of sediment to streams can be from road surfacing rock that breaks down under heavy ...
0.00302357 |
a/114749
2019_yvyc_district_5_postcards
islandsNALTON PL NENE 104TH PLNE 103RD PLP.O. Box 34996Seattle, WA 98124-4996OverviewWe’re improving safety and visibility for drivers, with ...
0.00302357 |
a/103680
2019_yvyc_district_6_postcards
construction schedule.Learn more:Seattle.gov/transportation/2018-YVYC-District-6YYVC_Projects@seattle.gov | (206) 316-2549YOUR VOICE,YOUR ...
0.00302357 |
a/103681
15thaves_safetyimprovements_doorhanger_final
with you about traffic circulation in the neighborhood and alternatives to the S Oregon St northbound access onto 15th Ave ...
0.00302357 |
a/103095
personnel rules 230316 single document final
of traffic and resulting risk to public safety. Therefore, employees who have not been designated as essential personnel ...
0.00302357 |
a/140391
btgannualreport2011final
regulatory signs, completed 221 bridge repair requests, installed 1,916 linear feet of new guardrail and maintained 1,055 ...
0.00302357 |
a/99107
btgannualreport2011final
regulatory signs, completed 221 bridge repair requests, installed 1,916 linear feet of new guardrail and maintained 1,055 ...
0.00302357 |
a/99413
2017q3noisereport
not able to be determined, therefore the analysis is restricted to maximum sound levels (hourly Lmax) only. Off-site sound sources included ...
0.00302357 |
a/110621
2017-q3 noise monitoring report
Station were not able to be determined, therefore the analysis is restricted to maximum sound levels (hourly Lmax) only. Off-site sound ...
0.00302357 |
a/110612