Filter Results

476 to 500 of 12096
ose director's rule 2025-01 draft
purposes, demonstrated by submitting one of the following: a. A valid certificate of occupancy or construction permit ...
0.00241787033 |
a/169976
2003src
, but is not required to, record the approval of modifications and any relevant information in the files of the building ...
0.002411386 |
a/97766
lpbcurrentnom_fed_reserve_3
facades. The sub-basement plan of the permitted construction drawings (apparently not included in the Assessor’s ...
0.00241105678 |
a/74466
2008electricalcodequickref
. (E) Moved Buildings. Electrical permits for electrical work performed on a building or ...
0.00241091056 |
a/96411
5_comments_responses_adu_feis_2018
in Section 1.2, the objectives of the proposed Land Use Code changes are to remove regulatory barriers to make it easier for property owners ...
0.00241044862 |
a/53180
2018sbcchapter4
706.Exceptions:1.Anchor buildings of not more than three stories abovegrade plane that have an occupancy classification the ...
0.00240990217 |
a/97450
appendix_f_cultural_resource_assessment_dr
to wed of two other residents (1968 and 1972, respectively). A fire occurred on property in the early 2000s, affecting the attached ...
0.00240911217 |
a/106133
2015seattleplumbingcode
by this code or any permits or certificates issuedunder this code. 108.5 Responsibility for Compliance. Compliance withthe ...
0.00240764837 |
a/97286
industrialmaritimestrategyfinaleis
-specific conditions (e.g., methane mitigation systems for buildings built near historical landfills) required by the City ...
0.002406804 |
a/134324
4213-dunn-phaseiesa
, and a 2007 permits for storage of flammable and combustible liquids and corrosives, as well as a tracking sheet regarding ...
0.0024047466 |
a/59362
policiesandoperatingguidelinesoctober2014
Base (IPD) should be reviewed for each occu-pancy/building:• Inspection History.• Special requirements for the ...
0.00240453868 |
a/94991
oneseattleplanfinaleisappendices2025
permit review and processing for projects that meet green building requirements with a focus on clean ...
0.002404014 |
a/165058
oneseattleplanfeis-chapter6-appendices
permit review and processing for projects that meet green building requirements with a focus on clean ...
0.002404014 |
a/165728
compiled_mha_feis_2017
for Landmark eligibility. •Requiring project proponents to nominate buildings for landmark review when demolition of ...
0.0024038346 |
a/65067
compiled_mha_feis_2017
for Landmark eligibility. •Requiring project proponents to nominate buildings for landmark review when demolition of ...
0.0024038346 |
a/118743
10_ifc_2021
risers and a tread is permitted at locations not required to be accessible by Chapter 11 of the International ...
0.00240236055 |
a/139964
2021sfcchapter10
by the fire code official, the actual number of occupants for whom each occupied space, floor or building is designed, ...
0.002402124 |
a/162445
2021sbcchapter1
. 101.3 Applicability of City laws. A building permit application shall be considered under applicable ...
0.00239955331 |
a/162470
adoptedufcmeetingnotes050323
. SDCI gets most of its funding from building permits, nothing from trees except some fines. from Jessica ...
0.00239766249 |
a/144769
southdowntownfinaleis
and Streetscape and Circulation-related Amenities require the integration of high-quality public art. Before a building ...
0.00239342055 |
a/88171
appendixd
provided, to promptly permit entry therein by the Planning Director, Fire Marshal, City Health Officer or the ...
0.00239308574 |
a/87491
sustainable_building_cluster_study_030105
in Seattle Permitting • Accelerate the SEPA and Master Use Permit timeline for sustainable ...
0.00239182636 |
a/56441
finaleis20081110
site) - Grading Permit/Shoring Permit - Demolition Permit - Building ...
0.00239112321 |
a/77104
udistrictfinaleis121814_web
and Development â–¶Land Use â–¶Master Use Permit â–¶Seattle Design Commission Review â–¶Construction â–¶Demolition ...
0.00239018351 |
a/87836
2005electricalcodequickref
and the permit holder has agreed to correct all deficiencies found and has been issued an electrical ...
0.0023891083 |
a/96393
Previous 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 Next