Filter Results

4501 to 4525 of 11044
ovg seattle center - part 2 of responses to city follow-up ...
Team Questions/Requests   1. Seattle Police intersection control is currently in use for KeyArena events at high traffic lo ...
0.0030266738 |
a/56269
sw-406_markup-final
traffic access and use)). If containers are stored permanently in the public right-of-way or in publicly accessible areas ...
0.0030266738 |
a/135810
02222013arenamou_countyresponse
, the City and County will complete a full SEPA review, including consideration of one or more alternative sites, a comprehensive ...
0.0030266738 |
a/50484
egan-house-designation
East is a wide street, providing for two-way traffic, with a lane in each direction and two outer lanes for parallel ...
0.0030266738 |
a/76360
desrpteganhouse
is a wide street, providing for two-way traffic, with a lane in each direction and two outer lanes for parallel parking. ...
0.0030266738 |
a/75990
cos_droneuseguidelines_2022update
, and any control of public property required for operation of UAS. All operations in City of Seattle right-of-way shall comply with the ...
0.0030266738 |
a/130617
attachmentalowriseamendmentordinance
. Generally, the width of principal streets in the area should be sufficient to allow for two (2) way traffic and parking ...
0.0030266738 |
a/87991
lakeridgeopenhousesummarynotes20190608
project. Our project will be constructed prior to theirs. We anticipate making appropriate connections and are working together to ...
0.0030266738 |
a/93269
21stmyrtle_2015_0821
Neighborhood Greenway Project. This will require traffic and parking restrictions on SW Myrtle Street between August 26 and ...
0.0030266738 |
a/101996
03 -march 2019 sbab min
Department of Transportation Dusty Rasmussen, signal operations & design, SDOT Purpose: ● Discuss traffic signals ● ...
0.0030266738 |
a/106522
mimpannualstatusreportjuly2015-june2016
or redevelopment work along Harvard during the past year. 4. At the time of the Master Use Permit application for the development of the ...
0.0030266738 |
a/76982
secmeetingminutes011018
: Paula Rojo-Vega – Seattle Center, Steve Fong – Seattle Parks and Recreation, Kenneth Neafcy – OEM, A/Chief Greening – SPD Operations, Capt ...
0.0030266738 |
a/110162
morganjunctionexecsummary
increased traffic and parking problems and that the design of new buildings does not fit into the neighborhood character.• ...
0.0030266738 |
a/108034
mimpannualreport2016
to the following conditions: 1) that any access to the garage system from Terrace Avenue shall be limited to permit holder entry only and in ...
0.0030266738 |
a/76777
cedar_flyer_2023
cedar_flyer_2023 HEALTHY STREETS AND SCHOOLS What is a Healthy Street? Healthy Streets are open for people walking, rolling, biking, and ...
0.0030266738 |
a/139445
guidelines for runs
guidelines for runs and walks help keep park events well managed, minimize traffic and congestion, neighborhood impacts and ...
0.0030266738 |
a/93783
sbab_2021-06-30_emarginalwayraisegrantsupport
bicycle and vehicular traffic will increase safety for riders and create greater predictability for drivers. East Marginal ...
0.0030266738 |
a/100672
africanamericanworkshopnotesmarch2009
, not wanting to come out at night for meetings. • Some people feel safer during the day – day format meetings are preferable • ...
0.0030266738 |
a/88077
census2000seattle58pageprofile
| Fishing, Hunting, Mining: 320,421|| Farmers and Farm Managers 100 Aircraft & Traffic ...
0.0030266738 |
a/84511
20160527notice
. 14th Avenue S repaving begins as early as June 6 •Step 1: Initial repaving will take up to 4 days tocomplete. Once complete, ...
0.0030266738 |
a/114359
robert_flyer_2023
robert_flyer_2023 HEALTHY STREETS AND SCHOOLS What is a Healthy Street? Healthy Streets are open for people walking, rolling, biking, and ...
0.0030266738 |
a/139460
september122013approvedminutes
on the proximity to such large traffic flows. Commissioner Brower commented that developing large office space on WOSCA is ...
0.0030266738 |
a/109165
ctrsurveypostponement
to the workplace. As the state reopens on June 30th, we need your help promoting sustainable transportation options to avoid a post-pandemic ...
0.0030266738 |
a/77386
idminutes3-13-18
alterations to facilitate construction of a protected bike lane. Alterations include revision to channelization and design of ...
0.0030266738 |
a/73122
sixth-church-christ-designation
Depression. In 1940 the streetcar system in West Seattle was dismantled, but by 1943, automobile traffic congestion ...
0.0030266738 |
a/76545