Filter Results

426 to 450 of 1943
pedestrianmasterplan_sepa_checklist
, directly related to this proposal. The following information has been prepared in relation to this project:  Seattle ...
0.00185974175 |
a/99325
sdot
throughout the city. Funding allocation varies year to year based on planned projects. The table below shows a summary of ...
0.00185962743 |
a/63567
sdot_2429adoptedcip
work includes street paving and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike, ...
0.00185944664 |
a/153290
transportation_projects
Bicycle Master Plan. Work includes installing bike lanes and bicycle route signing, completing key links ...
0.0018592804 |
a/61165
sdotcip_000
paving and resurfacing; • building new sidewalks and curb ramps; • school safety improvements; • implementation of the Bike and Transit ...
0.00185914792 |
a/63153
transportation
implementation of the Bicycle Master Plan, construction of more than 13 blocks of new sidewalks, further ...
0.00185896666 |
a/61345
sdot_projects
in thousands of dollars.2007-2012 Proposed Capital Improvement Program-308-TransportationStart Date:End Date:This program implements the ...
0.00185890461 |
a/61205
sdotcap
and resurfacing; • building new sidewalks and curb ramps; • school safety improvements; • implementation of the Bike and Transit ...
0.001858807 |
a/63082
2019annual_report_0106_2020_final
– Discrete project, refer to page 49 30 Freight spot improvements 6 5 5 5 5 21 For more detail on program performance, see ...
0.00185841054 |
a/99533
part_ii_intro
Enhances The freight network map, first- and last-mile connectivity needs for major port, industrial, and intermodal ...
0.00185815245 |
a/158019
ch4
Manufacturing and Industrial Center (BINMIC) Plan•Seattle Department of Transportation Freight Mobility ...
0.001858144 |
a/100491
lightrailamendmentsordinanceapril2025
and must be terminated 14 or removed when construction of the related light rail transit facility is completed or in 15 accordance with the ...
0.00185764942 |
a/168160
ducpg-plan
Streets andpedestrian-oriented streets.tCreate a downtown-wide urban designmaster plan..The City should hire a ...
0.0018574358 |
a/78400
transportation
of the Bicycle Master Plan, design and construction of three new trail segments, construction of more than ...
0.00185722241 |
a/61478
utilitiesandtransportation
the Transit Master Plan, accelerate implementation of the Pedestrian Master ...
0.0018571876 |
a/61884
transportation
the Gap program for 2009 include a plan to repave more that 24 lane miles of arterials, continued implementation of the ...
0.00185702508 |
a/61533
stp_checklist2022_0610_signed_rd_encrypted
for the environmental elements (Part B) that they determine do not contribute meaningfully to the analysis of the proposal. June 2022 City ...
0.00185681635 |
a/129527
seattle city light 2020 final os
Manager of Grid Operations and Planning. Mr. Baggs holds a bachelor's degree in Economics from the University of Colorado ...
0.00185671856 |
a/58477
approved sfab minutes october 2023
have a lot of concerns about the freight elements in particular, and the plan overall. I don't see where ...
0.0018566146 |
a/153908
isrd101122ls2030ationplanfinalwebversion
neighborhood has four distinct zoning categories: Neighborhood Commercial (NC), Downtown Mixed Residential (DMR), Downtown Mixed Commercial ...
0.001856597 |
a/134616
appendixb
needs HCT.6/24/2014DisplayBoardsComp Plan must support all adopted transportation master ...
0.00185658061 |
a/87489
outsidecitywidereport2018
, school gardens, landscaping, master site plans. Many projects are proposed by a Parent Teacher Student ...
0.001856525 |
a/87316
admiral_way_repl_study_final_report_5-31-24
and clearance standards?3. Are there identified freight projects in project area? (Freight ...
0.00185648142 |
a/166250
sdot_birt_report_appendices_110220_g
39) Freight W Dravus Street NB on/off-ramp SB Off/On-ramps Interbay Both Alternatives Freight ...
0.00185636722 |
a/103982
outsidecitywidereport2018
school buildings or grounds, including new playground equipment, murals, school gardens, landscaping, master site ...
0.00185591646 |
a/86170