Filter Results

4451 to 4475 of 5663
cswg minutes 04-15-2025
Agenda: Minutes 1 Call to order 2 Introductions 3 Quarterly Determination Report + Seattle IT Strategy 2025-2027 4 2025 Work ...
0.00220923638 |
a/168238
idminutes2-13-18
for the camera housing. Exhibits included photographs, renderings and plans. The Jackson Building was constructed in 1932. ...
0.00220923638 |
a/73115
61_preliminaryreport
, Zoning and land use, Comprehensive Plan, and Other plans: State Law requires government agencies to ...
0.00220923638 |
a/59634
idminutes9-11-18
portion of the building. Mark Angelillo, Stream Real Estate, explained that minor changes were planned that required a ...
0.00220923638 |
a/73160
b-5udistrictfeis2016_0505
Comprehensive Plan Update Final EIS May 5, 2016Comments Received on the Seattle Comprehensive Plan EIS ...
0.00220923638 |
a/87499
swedish cherry hill iac final meeting minutes may 8 2024
powerful for the neighborhood, future skybridge, construction management plan required during construction to include ...
0.00220923638 |
a/166573
swedish cherry hill iac draft meeting minutes may 8 2024
for the neighborhood, future skybridge, construction management plan required during construction to include bio-retention, ...
0.00220923638 |
a/159718
psb060524199alaskanwysr
and are regulated as set out in this Section 23.66.160. Building owners are encouraged to develop an overall signage plan ...
0.00220923638 |
a/156803
mhc-6-9-21
said for years they have sold their cherries and cherry candies to wineries who have been included the candies in wine gift boxes. She ...
0.00220923638 |
a/137376
isrd4-27-21
Ms. Frestedt explained the proposed change of use from commercial to residential amenity space (696 sq. ft.) Exhibits included ...
0.00220923638 |
a/73179
psb11-16-16_minutes
on the material and color samples. Applicant Comment: Jessica Bailey, Mallet Architecture, explained the proposed ...
0.00220923638 |
a/73749
prisemsystemenhancerfp140078
messaging is delivered to all participating jurisdictions. During development, the consultant will conduct regular change management ...
0.00220923638 |
a/70187
opcdincentivezoningamenitystandards
shall provide: a. an updated showing calculation of extra floor area and how it is proposed to be achieved b. detailed site ...
0.00220923638 |
a/87101
incentive zoning amenity standards 2018-07-30 public draft ...
: a. an updated showing calculation of extra floor area and how it is proposed to be achieved b. detailed site plan ...
0.00220923638 |
a/87100
urbandesignworkinggroupmeeting7notes
(Seattle Department of Planning and Development-DPD), Dave LaClergue (DPD) Overview This meeting started with a detailed ...
0.00220923638 |
a/87874
pspbminutes_4-5-23
, and additions while preserving those portions or features which convey its historical, cultural, or architectural values. ...
0.00220923638 |
a/145823
stadiumstudymeeting4notes
people attended and toured the study area on a bright sunny evening. Gary reminded the group of the end goals for the project: to inform ...
0.00220923638 |
a/87733
seattledesigncommission2012.12.06seattlearenaminutes
seattledesigncommission2012.12.06seattlearenaminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura Director, DPD ...
0.00220923638 |
a/85806
seattle design commission 2012.12.06 seattle arena minutes
seattle design commission 2012.12.06 seattle arena minutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura ...
0.00220923638 |
a/85880
seattledesigncommission2008.01.17firestation30minutes
that spans 12 feet in width, which is not standard for a multiuse trail, which is 14 feet. 3Public Comments t plan? ...
0.00220923638 |
a/85804
seattledesigncommission-2008.01.17thomasstreetpedestrianbridgemin ...
walking surface that spans 12 feet in width, which is not standard for a multiuse trail, which is 14 feet. 3Public Comments t ...
0.00220923638 |
a/85416
seattledesigncommission-2019.10.03southrecyclingfacilityminutes
Kenyon St from the proposed site, was completed in 2013. Phase I was not planned to accommodate all solid waste needs. ...
0.00220923638 |
a/85953
references.final press ready
. ———. 2015b. Evaluation of the 880,000 Gallon Steel Standpipe Volunteer Park Standpipe. Report prepared for Seattle Public Utilities. ...
0.00220923638 |
a/113562
sclreviewpanelsep172020mtgnotesfinal
guess when I think of that I think of 3rd party vendors using my stuff. Can you speak more to that? A: This is built on the premise of ...
0.00220923638 |
a/51672
oca_crime_prevention_review_09-05-2012
. These standards provide guidelines for audit planning, fieldwork, quality control systems, staff training, and reporting  ...
0.00220923638 |
a/127434