Filter Results

4276 to 4300 of 5610
pspb7-21-21
’. Staff report: Ms. Nashem noted the plans also adjusts the location of bike racks and the size of previously proposed ...
0.00216453429 |
a/73832
uwmc_nwcampus_dac_notes_meeting 5
of alternative 1&2 was reviewed. Question- Is the road and the sidewalk included in the setback? Answer-A Road is allowed in the setback. ...
0.00216453429 |
a/144997
addendum 3 seattle arena rfp 3-22-17
to provide information directly to the public. Item 2. Site Plan Inquiries – Drawing Inventories The contact person for ...
0.00216453429 |
a/56141
idminutes3-14-17
of the neighborhood it is in. He noted the plan to activate the corner and said they will have a sidewalk café. Kailan ...
0.00216453429 |
a/73123
seattledesigncommission-2018.12.6southparkpumpstationminutes
ClarkRikerrious GeterRachel GleesonLaura HaddadBrianna HolanMark JohnsonRick KrochalisRoss TilghmanOffice of Planning and ...
0.00216453429 |
a/85943
lpb1-6-21
is a complete demolition. Mr. McCullough said yes, there is no structural integrity. Mr. Barnes asked about plans for the ...
0.00216453429 |
a/74624
lpb12-1-21
it over and destroy it. Ms. Doherty read brief comments by Alexa Berlow who supported nomination of the Panama Hotel’s ...
0.00216453429 |
a/163339
lpb12-2-15-minutes
exterior alterations and interior alterations are compatible with the massing, size and scale and architectural features of ...
0.00216453429 |
a/74642
lpb051723uwandersonagmnt
signage, consistent with a signage plan that has been approved by the Landmarks Board staff, and when the signage remains ...
0.00216453429 |
a/142447
psb11021
. Any remaining cobble will be removed and salvaged. While no alley work was discussed in the previous presentation, the ...
0.00216453429 |
a/74192
pspbminutes_10-5-22
of activities; she asked if there is a plan to regularly schedule the spaces so they are not sitting empty. Mr. Jobes said ...
0.00216453429 |
a/139594
23rdavenueactionplanphase2june29workshopsummary
23rdavenueactionplanphase2june29workshopsummary 1 23rd Avenue Action Plan - Visions, Goals, Strategies and Actions June ...
0.00216453429 |
a/86193
2018sbcchapter2
, whichever time period is less.DEFINITIONS242018 SEATTLE BUILDING CODE[S][BG] AWNING. ((An architectural projection that ...
0.00216453429 |
a/97432
seattledesigncommission-2010.02.04citywidedesignguidelinesminutes ...
seattledesigncommission-2010.02.04citywidedesignguidelinesminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane Sugimura ...
0.00216453429 |
a/85520
2021sbcindex
) ARCHITECTURAL ... ........................................................................ 1603.1.3 Seismic ...
0.00216453429 |
a/162603
rooseveltmodeanmemo1015
evaluation by the Seattle Department of Transportation (SDOT). The Seattle Transit Master Plan identified the RDHCT ...
0.00216453429 |
a/106350
2021secchapter5
on the HVAC system is planned. When using this exception, it is acceptable to replace a single appliance ...
0.00216453429 |
a/162722
dadu_submission148
TO OTHERSWITHOUT THE PRE-WRITTEN CONSENT OFASHLEY ZAWORSKA ARCHITECTURE, PLLC.ALL RIGHTS RESERVED. COPYRIGHT 2020.4603 15TH ...
0.00216453429 |
a/86943
2019annualreport
neighborhood is no easy task. The architects from NBBJ designed the project as “a physical merging of public infrastructure, ...
0.00216453429 |
a/50727
2021sbcchapter2
mean square, A-weighted sound pressure level measured over a 24-hour period, or the time any person is present, whichever time period is ...
0.00216453429 |
a/162479
public-webinar-5.8.25
, documentation required.)1st Director’s Rule Timeline OverviewQ4 2024Q3 2024Q2 2024Q2 2025Focused Topical Meetings (e.g., labs & critical ...
0.00216453429 |
a/168873
lloyd_briefing
CHARACTERISTICSDesignated a Seattle Landmark based on satisfaction of the following standards for designation of SMC 25.12.350:D. It ...
0.00216453429 |
a/75313
lightingandsignage
compliance. To ensure proper performance, architectural details should allow for ventilation and air flow around the ...
0.00216453429 |
a/96338
ebr-muni-buildings
YanG G L Oarchitecture | interior design | landscape architecture | planning & urban designDirector: Jill ...
0.00216453429 |
a/88322
ebr-muni-buildings-2012
, Wei YanG G L Oarchitecture | interior design | landscape architecture | planning & urban designDirector: ...
0.00216453429 |
a/57416