Filter Results

4126 to 4150 of 5610
pspbminutes10-2-19
; that signs not hide, damage or obscure the architectural elements of the building; that signs be oriented toward and ...
0.002101731 |
a/74053
staff_report_grand_central
in the same way that a building is measured i.e. from the mid-point this would comply. The plans stated that the coverage ...
0.002101731 |
a/74256
mhcminutes_9-28-22
1532-B Pike Pl, Triangle Building Sarah Taylor, Business Owner Ms. Le explained the proposal for painting and fixtures for new business. ...
0.002101731 |
a/154649
seattledesigncommission2014.07.01firestation22-roanokeminutes
seattledesigncommission2014.07.01firestation22-roanokeminutes APPROVED MINUTES OF THE MEETING Ed Murray Mayor Diane Sugimura Director, ...
0.002101731 |
a/85816
gb-city-case-fire10
Consulting Architect, TCA Architecture- Planning, Inc. www.tca-inc.comMechanical Engineer Notkin ...
0.002101731 |
a/88360
id-02-24-15-minutes
School 1025 S. King St. 3 Applicant: Philip Riedel, NAC Architecture Ms. Frestedt explained the proposed ...
0.002101731 |
a/72907
2021.08.19sdc_33rdavewpedbridge_minutes
condition: Provide to a subcommittee of the SDC for comment at around the time of early 60% design, 1. Plans for where ...
0.002101731 |
a/84700
pedretailareaspedzonefaq
with existing or planned frequent transit service. Why is this zoning tool used in neighborhood commercial zones? Allowing ...
0.002101731 |
a/88122
seattledesigncommission-2010.03.18alaskanwayviaductandseawallminu ...
seattledesigncommission-2010.03.18alaskanwayviaductandseawallminutes APPROVED MINUTES OF THE MEETING Mike McGinn Mayor Diane ...
0.002101731 |
a/85530
seattledesigncommission-2016.03.17portagebayparkminutes
figures 1, 2 & 3 for more detail. Although the project team has not identified specific materials nor architectural ...
0.002101731 |
a/85077
732_1st_presentation
work (model shop for architecture firm). This unit is 6000sf on the main level, with an additional 1950sf on a second ...
0.002101731 |
a/126440
workshopnotesoct2018
: Desire to shape the quality of new buildings (setbacks, light and advance distinct design (setbacks, light, and air access, etc.). ...
0.002101731 |
a/86669
creative economy report 4.3.19
workforce. In planning, researching, and creating this report, we had three objectives:1. Define the creative economy: No ...
0.002101731 |
a/59954
creative economy report final
approach to thinking about the creative economy, knowing that we will continue to measure changes in the labor market and attempt to measure ...
0.002101731 |
a/59989
creative economy report final
approach to thinking about the creative economy, knowing that we will continue to measure changes in the labor market and attempt to measure ...
0.002101731 |
a/59955
wg2_2.18_presentation_schemata
wg2_2.18_presentation_schemata ISRD Workshop 1A Look Back and ForwardSchemata Workshop & BOLA Architecture and ...
0.002101731 |
a/86613
dadu_submission129
. ‐ Open plan allows for small gatherings.  Constructability ‐ Slab on grade foundation system. ‐ ...
0.002101731 |
a/86924
dadu_submission017
. These strategies will reduce the cost of heating/cooling. The square plan supports flexibility in site placement (see ...
0.002101731 |
a/86811
comprehensive_summary_mtbaker
painted many murals at the intersection of Rainier Ave and MLK Jr Way S. FHS staff highlighted this project as an opportunity to involve ...
0.002101731 |
a/159014
uhgts_drawings
EXTINGUISHERS AND CABINETS ARE NOT SHOWN ON PLANS. PROTECT EXISTING FIRE EXTINGUISHERS AND CABINETS (RECESSED OR SURFACE ...
0.002101731 |
a/75481
uhgts_drawings(0)
EXTINGUISHERS AND CABINETS ARE NOT SHOWN ON PLANS. PROTECT EXISTING FIRE EXTINGUISHERS AND CABINETS (RECESSED OR SURFACE ...
0.002101731 |
a/75480
lpb051524uwandersonhallbp
| 15 May ...
0.002101731 |
a/156216
metropole
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...
0.002101731 |
a/74174
notes-07182017
. Tobin Thompson of ZGF presented a brief overview and the latest iteration and proposal for the MUP submittal design review. The focus of ...
0.002101731 |
a/77117
18040_cac_road_map_of_topics_2020_08_03
18040_cac_road_map_of_topics_2020_08_03 SEATTLE CENTRAL COLLEGE MAJOR INSTITUIONAL MASTER PLAN August 3, 2020 CAC Road ...
0.00210150448 |
a/76959